Professional Documents
Culture Documents
General Information
Type of Submittal: Intent: References: Attachments:
A = Product data Proposal As per Specifications
B = Sample Alternative Change in Specification
C = Method Statement Resubmission
D = Shopdrawing Implications:
E = Test Result No Cost Implication
F = Others With Cost Implication
Description
Description: Elbow Fittings (FIRE SUPPRESSION SYSTEM)
Level: BASEMENT 1
BRAND: MECH
Note: Contractors to submit to EELHI (7) days a formal quotation/ cost proposal for any anticipated cost implication arising from this SRF evaluation