Professional Documents
Culture Documents
IBM’s statements regarding its plans, directions, and intent are subject to change or
withdrawal at IBM’s sole discretion. Information regarding potential future products is
intended to outline our general product direction and it should not be relied on in making a
purchasing decision.
Speeding service Increasing sales with Recognizing & repairing Reducing the time it
delivery from 45 days to new promotions from over 50% of issues before takes to backup critical
20 minutes 15% to 75% operations impact data by 80%
– Continue to produce High Quality products; – Expand deep Industry Solution functionality
leverage customer input during every step of and new Growth areas such as:
the development cycle • Intelligent Buildings
• Safety, Risk and Compliance
– Protect customer investment; upgrades to • Facilities Management/Space Planning
future Maximo versions
– Leverage IBM products and technology
– Commit to Open Standards: J2EE, SOA
• both IBM and non-IBM platform
components
Industry Solutions -industry-specific capabilities for the unique requirements of asset-intensive industries.
Maximo
Maximo Maximo Maximo Maximo
for
for Life Sciences for Nuclear for Oil & Gas for Utilities
Transportation
Add-on Solutions - options, used with core or industry solutions, provide deeper functionality for specific needs.
Integration Adapters - commercially-supported integration to other enterprise and 3rd party systems.
Maximo Maximo
Maximo Maximo
Adapter for Adapter for MS
Adapter for SAP Adapter for Oracle
Primavera Project
The information on the new product is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information on the new product is for
informational purposes only and may not be incorporated into any contract. The information on the new product is not a commitment, promise, or legal obligation to deliver any material, code or
functionality. The development, release, and timing of any features or functionality described for our products remains at our sole discretion. .
The information on the new product is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information on the new product is
for informational purposes only and may not be incorporated into any contract. The information on the new product is not a commitment, promise, or legal obligation to deliver any material,
8
code IBM Confidential
or functionality. The development, release, and timing of any features or functionality described for our products remains at our sole discretion. . © 2009 IBM Corporation
Feature Enhancements to Maximo 7.5
Important new enhancements have been added to base Maximo to extend core functionality, provide additional value,
improve customer satisfaction and deliver innovation through new capabilities
Focus Feature
Enhanced User Functionality New supply chain management: Inventory/receiving
Enhanced supply chain management:
– PO/PR/RFQ/Invoicing
Enhanced work and asset management
– Hard/soft reservations
– Linear Asset Visual Control
– Repair Facilities
– more
Improved cost of ownership Automation scripts
Application data import/export
Enhanced Migration Manager
Expanded ad-hoc Reporting capabilities
Usability and performance
Expanding the base Calibration and Scheduler add-on code included in base, simplified
installation
– Asset Templates
– Job Plan Revisioning
– PM Forecasting
– SLA Manager
Platform Currency OS: Windows, Linux, Unix
DB: DB2, Oracle, SQL Server
WS: WebSphere, Weblogic
9 IBM Confidential Browser: Firefox, IE © 2009 IBM Corporation
Maximo Health, Safety & Environment Manager 7.5
Best practices for improving HS&E, reliability and quality
• Integrating health, safety and environmental processes with work and asset management
Highlights
– IBM Intelligent Building Management is an integrated software
Lower building operating cost by offering that combines real-time systems monitoring with
consolidating building information and by facilities and event management to help analyze and optimize
facilities operations, reduce energy expense, and improve asset
performing analytics to identify energy
management and reliability
optimization opportunities
– The solution gives building owners and managers the ability
Improve facility operations by analyzing to collect vital real-time energy and operational metrics, apply
real-time equipment alerts and automated enterprise-wide analytics, and view that data in a cohesive
service requests to more efficiently service dashboard to support optimization capabilities.
key building equipment
Product Offering
Addresses critical processes for the total life cycle of a building from construction, design,
and project management to leasing, portfolio management, maintenance management,
space management, energy and environmental sustainability and asset disposition.
This
ThisRelease
ReleaseDelivered:
Delivered:
––IBM
IBMre-branding,
re-branding,Open
Opensource
sourceremediation
remediationand
and
3rd
3rdparty
partycontracts
contracts
––Replacement
ReplacementofofCrystal
CrystalReports
Reportswith
withBIRT
BIRT
––New
Newlanguage
languagesupport
supportfor
forFrench,
French,Spanish,
Spanish,
Italian
Italianand
andBrazilian
BrazilianPortuguese
Portuguese
––Functionality
Functionalitywithin
withinReal
RealEstate
Estateto
to
accommodate
accommodatenew newFASB/IASB
FASB/IASBaccounting
accounting
rules.
rules.
The information on the new product is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information on the new product is for
informational purposes only and may not be incorporated into any contract. The information on the new product is not a commitment, promise, or legal obligation to deliver any material, code or
14
functionality. The development,IBM Confidential
release, and timing of any features or functionality described for our products remains at our sole discretion. . © 2009 IBM Corporation
IBM Smartcloud Control Desk – address IT/OT for intelligent assets
Create a Work Order Query that will capture the WOs assigned to labor/crew for the day.
Map is based on Work Order Query List.
Field Technician’s
Work Order Route
1.1. Advanced
AdvancedScheduling
Schedulingand
andField
FieldWork
WorkForce
ForceManagement
Management
–– Continued
Continuedenhancements
enhancementstotoMaximo
MaximoScheduler
Schedulerleveraging
leveraging2012
2012deliverable,
deliverable,leading
leadingtoto
optimization
optimizationand
andautomation
automationinin2013
2013
2.2. Focus
Focuson
onMobile
MobileApplications
Applications
–– Maximo
MaximoMobile
Mobileand
andSmart
Smartfor
forTririga
Tririga
–– Develop
Develop next generation mobileplatform
next generation mobile platform
3.3. Data
DataCenter
CenterInfrastructure
InfrastructureManagement
Management
–– Partner
Partnerproduct,
product,gain
gainmomentum
momentumwith
withPOC’s
POC’s
4.4. Asset
AssetPerformance
PerformanceManagement
Managementand
andAnalytics
Analytics
–– Predictive
Predictiveasset
assetmanagement
management
–– Supply
Supply chain andvendor
chain and vendormanagement
management
–– Space management
Space management
2013 Focus:
• Optimization, Mobile Applications and Analytics Maximo
ACM/Transportation
7.5.1.0
• Address high-value customer requirements • Aviation/Spec 2000
across multiple industries • Flight Log Book
• Progressive Inspections
• Continued maintenance for multiple releases,
delivering Fix-packs for 7.1.x and 7.5.x TRIRIGA 10.4
Next Generation Mobile
- Reservation
• Mobile platform
Mgmt
Maximo-TRIRIGA Maximo Industry • Multiple Device Support
Integration Maximo Mobile - Sustainability Solutions and
7.5.1.0 enhancements • Connected/Disconnected
• Space & Move Add-On’s 7.5.x.0
Maximo - Building • Application Designer
Management • Android support
Fix-pack 7.5.0.4 System
• ISM download • RFID Integrations
H1 2013 H2 2013
New Products
Planned
Releases
The information on the new product is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information on the new product is for
informational purposes only and may not be incorporated into any contract. The information on the new product is not a commitment, promise, or legal obligation to deliver any material, code or
22
functionality. The development,IBM Confidential
release, and timing of any features or functionality described for our products remains at our sole discretion. . © 2009 IBM Corporation
Maximo Oil & Gas 7.5.1 - Target Q1 2013
Address critical gaps that remain in the HSE market, which will address opportunities in
both the Oil & Gas market and the overall Safety market:
Auditisisrequired
requiredby
byMaximo
Maximocustomers
customerstotomeet
meet“Quality
“QualityManagement
ManagementSystem”
System”requirements.
Survey
Surveyand
andAudit requirements.
Worksupports
supportsfull
fullpermit
permittotowork
workprocess
processincluding
includinginitiation
initiationofofaapermit
permitfrom
fromaaWork
WorkOrder
Orderand
andan
anability
abilitytoto
Permit
PermittotoWork
incorporate
incorporatepermit
permitinformation
informationinto
intoOperator
OperatorLogs.
Logs.
Modificationsintroduces
introducesthe
thecapability
capabilitytotomanage
manageturnaround
turnaroundand
andmodification
modificationproject
projectpreparedness
preparednessand
Turnarounds
TurnaroundsandandModifications and
execution.
execution.Customers
Customersare
arenow
nowable
abletotocreate
createresource
resourceprofiles
profilesassociated
associatedwith
withaaturnaround
turnaroundand
andmodification
modificationproject.
project.
Creation of certification records for assets, locations, surveys and audits fulfills compliance requirements for asset
Creation of certification records for assets, locations, surveys and audits fulfills compliance requirements for asset
intensive
intensivecompanies.
companies.
Data Center
DCIM extends an
enterprise-wide IT
Facilities
discussion about facilities DCIM
management, space Enterprise Facilities
IT Asset & Service
Management
Assets Operation - Racks, PDU,
planning and asset Power & UPS, CRAC, Change
management into the Facilities,
Transportation,
Cooling Cables, Management
Servers,
data center Production Facilities
Maintenance
Storage, etc
Systems
Monitoring
Equipment, etc
Physical IT Security
Security
Storage
Buyers/Decision Makers:
Facilities IT
- VP Facility Operations Need to consider how Need to understand
management of the physical aspects of data
- Facilities Manager physical space impacts IT center to ensure optimal
operations IT operations
- VP Data Center Operations
- Data Center Manager
25 IBM Confidential © 2009 IBM Corporation
Maximo Scheduler 7.5.2 - Target Q3 2013
Add capabilities to support optimization models, automated scheduling and routing
Value Added
Optimization: “Finding an alternative with the most cost
effective or highest achievable performance under the given
constraints by maximizing desired factors and minimizing
undesired ones.”
– Maximo Everyplace
• Access Maximo/SCCD applications from the browser on mobile devices
• Full Connectivity use-cases only
• iPad, iTouch, iPhone, BlackBerry, Androids (phones, tablets, laptops)
• Configure using Application Designer
• Same look/feel as standard products
1. The ability to manage assets, work (tickets) and inventory at point of performance
• Regardless of connection state
• Ensuring data is captured, accessible and properly maintained
• Increase efficiency of workforce
• Reduce reliance on paperwork and eliminate admin. tasks
2. Platform-independent ability to interact with Maximo, SCCD, TRIRIGA applications
• Regardless of device or form factor
• Leveraging evolving technology for access (Ruggedized devices, Laptops,
Smartphones, Tablets)
• Supports multiple operating systems (iOS, Android, BlackBerry, Windows)
Customer
CustomerPreferences
Preferences
Supports
SupportsConnected
Connectedand
andDisconnected
Disconnecteduse-case
use-casemodels
models
Common
Commonplatform
platformfor
forseamless
seamlessbusiness
businessprocesses
processes
Easily
Easilyconfigurable
configurableUI
UItotomeet
meetspecific
specificbusiness
businessrequirements
requirements
Single
Singlevendor
vendorsolution
solution(IBM)
(IBM)
Customer Adoption Across the Maturity Curve – Today and in the next 5 years
% customers today 30% 40% 20% 7% 2% 1%
Advanced Analytics
Optimization How can we achieve the best outcome?
Competitive Advantage
Degree of Complexity Based on: Competing on Analytics, Davenport and Harris, 2007
Common thread:
- Sensor connectivity
- Data repository for equipment and process data
- Statistical analytics and data mining
- Real-time dashboards with drill through
- Decision and incident management
Components:
– SPSS Decision Management, Modeler
– Cognos BI with dashboards
– IBM Informix, Infosphere Data Stage
– Centralized Configurator
– IBM server hardware
Key Benefits:
- Maximizes equipment availability
Predict failures, parts wear,
early warning, find design flaws
- Optimizes processes
Control process variability, determine best operating
conditions, root cause analysis, real-time monitoring,
statistical process modeling with scoring.
36 IBM Confidential © 2009 IBM Corporation
Thank you…
http://www.ibm.com/developerworks/rfe/?BRAND_ID=90
38 IBM Confidential © 2009 IBM Corporation
DeveloperWorks - Asset Management Blogs
https://www.ibm.com/developerworks/mydeveloperworks/blogs/a9ba1efe-b731-4317-9724-a181d6155e3a/?sortby=0&page=0&maxresults=15&lang=en