nit – 1
Area calculations: Types of areas taken for estimation plinth areas, plot area,
timates etc.
it – 2
of works on site.
Working out cost of construction based upon the plinth area rates, covered
ea rates etc.
Rate analysis of various items concrete, RCC brickwork etc. using the market
es CPWD (97) of materials and labor.
Calculates the cost of the building based on the market rates and working out
e rate per sq.mtr. area of the building.
urpose of Estimating
) To know the approximate resources for proposed work.
) To know the requirement of tools, plants and equipment.
) To keep control over expenditure during construction.
) To draw up a construction schedule and programme.
) To fix up the completion period.
) To know value of property.
) To obtain administrative approval and technical sanction.
) To invite tender.
urpose of Costing
To know the probable cost of project before the execution.
To arrange the finance for proposed work.
For valuation of existing property
To know the cost of various items, well in advance, to be
onstructed.