los CHARGING COMPATIBILITY WITH NISSAN EV
SSA RECOGNITION LETTER
NISSAN EUROPE, S.A.S,
Date of letter submission: 24-March-2017
Test date: 15-07-2016
Test venue: IDIADA Automotive Technology.
UAlbornar.
43710 Santa Oliva (Tarragona)
Spain
Mode 3 AC charging station tested: NISSAN test routine used:
Manufacturer: Wallbox Chargers Mr Charger version: 2 (based on MY13 LEAF)
Family name: Mode 3 Chargers NTC check sheet version: §
Product Name: ‘Commander Vehicle used: MY13 LEAF
‘Type of AC Supply: 3 Phase
Mode! Name: Wallbox Commander Compatibility with different Vehicles used:
Product Code WECOMMO101A Until MY16 LEAF
Serial Number: 00300 Until MY16 eNV200
Hardware Version Vota
Software Version: vo101_A
NISSAN R&D conditionally recognizes that the aforementioned charging station is compatible with the
aforementioned NISSAN LEAF models. This recognition is only valid provided that the following four conditions are
met at a time:
1. Allthe software and hardware modifications recommended by NISSAN R&D are duly implemented on the
corresponding production-level charging stations.
2, The corresponding production-level charging stations prove a right performance under real-life usage
conditions,
3. The manufacturer offers active cooperation in order to fix any charging incidence resulting from malfunction
of the corresponding production-level charging stations,
4, The manufacturer keeps NISSAN Europe informed on any hardware or software modification taking place
after the finalization of the charging compatibilty tests to which this letter refers.
Disclaimer
+ This letter is only valid provided that itis presented alongside the corresponding test report issued by
NISSAN R&D.
«This letter is not valid for any hardware or software changes made in the charging station after testing. The
manufacturer is expected to inform about the changes made, if any and if required it must be sent again for
testing
+ The charging compatibility tests to which this letter refers, the test reports issued by NISSAN R&D, and this
letter itself are exclusively meant for information and shall not be interpreted as agreement, favourable
pinion or approval through which NISSAN accepts any liability for or validates the quality of the
‘aforementioned charging station and the corresponding production-level units. Therefore, no NISSAN
company will be liable for any issue arising from compatibility problems caused by the aforementioned
charging station or by the corresponding production-level units.
+ As the charging station manufacturer and/or seller, you have the sole responsibilty for the charging station
and for the corresponding production-level units,
+ This certificate does not claim that the manufacturer and/or seller is @ Nissan recommended partner.