Work Permit Receiver
1 Who leads joint site inspection make sure gas test is taken?
‘Ans The issuer
2 Issuer tell to driver drive to oil processing area What permit required?
Ans Hot Work
3 Two main hazards in oil gas Area?
‘Ans Flammable and toxic gas present
4 Why do receiver go on the joint site inspectin with the issuer?
‘Ans To Discus hazards and risks
5 Who must sing the work permit renwal and close it?
Ans The issuer and receiver
6 Welding working in storage tank so what permit need?
‘Ans Hot, Confind space
7 Who will install the lock and tags?
‘Ans issuer and each receiver
8 spray paint inside confined space?
‘Ans Flammable paints vapur can case bulk explosive limit
9 When issuer given permission receiver leave the site before leaving the site what he will do?
Ans Permit handover to certified permit receiver and leave the site
10 When make sure when install lock and hole tags and equipment to De-Energined ?
‘Ans When energe in system to injury people or workers
11 Why receiver asks hot work permit to use ignition source restricted area ?
‘Ans Flammble liquied present
12. When the stop work?
‘Ans You observe unsafe con
ions
13. Fire watch main responsibility is do?
‘Ans Use equipment given to him and monitor ignitions sources
14 Why issuer assign the fire watch?
‘Ans To Monitor the ignitions sources
15 When permit closed?
‘Ans A Time started on the work permit(Duration box)
16 What exact work location?
‘Ans Work site
Scanned with CamScannerv7
Ans
18
Ans
19
Ans
20
Ans
a
Ans
2
Ans
23
Ans
24
Ans
25
Ans
26
Ans
27
Ans
28
Ans
29
Ans
30
Ans
31
Ans
32
Ans
3
Ans
What are two important reasons for using work permit ?
To communicate and control work
‘What two things receiver must do before receving work permit?
Read the permit and Agree to all condition
Why receiver tell to issuer what equipment used and scope of?
So that the safety precaution and agreed
‘What do wet call a person who is required to be at job site ignition source
Fire watch
‘When issuer issed hot work permit to monitor ignition source in restected area why?
Flammable and toxic gas present
Who must the receiver contact request for work permit?
Certified issuer
Fire watch two responsibility?
Operate the fire equipment and monitor ignition source
Why issuer assign the stand by man in confined space?
To monitor work activity
Why we use work pemit in restricted area?
To control the hazard activities
Why issuer make sure install lock and tags to De-Energized?
People can injury
You know that area is hazard is designed?
Restricted area
What is do representitave unsite?
‘A Conduct the joint site inspection
What happen it work must contine past that time the orginal permit to expairy?
Extend the permit or issue new work permit
An equipment opening line breaking permit is(EOLB) Required when?
Opening flange and install blind
Which permit require perform welding inside of tank?
Confined space and hot work permit
Why spary painting is more dangerous in confined space?
Vapour may be come explosive
What we called the person who will remain 30min after how done site?
Fire watch
Scanned with CamScanner34. Issuer assign fire watch he told to issuer that he can not use fire equipment?
‘Ans Replace the fire watch with trained
35. Where must the receiver keep work permit after it is used?
Ans Display of the job site
36 What is the responsibi
of designated representative?
‘Ans Inspect the work site ( Joint site inspection)
37 Who must sing the work permit to close it ?
Ans issuer and each receiver
38. Restricted area includes?
‘Ans Pump station, sewer plants and wells
39 We use work permit in hazards area to?
‘Ans Be sure that precautions are taken
40 We use work permit in hazards area to identity?
‘Ans Hazards and precautions
41. Who must sign a work permit to renuwal/Extand?
‘Ans Issuer and receiver
42. Why we are use work permit in site?
Ans Identifi hazards control
43 Why issuer and receiver go to site?
‘Ans To discus safety hazards and risks
44 Hazards in excavtion common to identifi?
Ans Side wall Collapes and utilities under ground?
45 How long can work permit extended?
‘Ans 24hours
46 Why must work permit to be closed?
‘Ans To communicate the status of work
47. Receiver is a?
Ans Certified craft man
48 Work pemit issuer responsibility?
Ans Equipment or work area
49. When preparing equipment for maintance work the issuer make sure that is?
‘Ans Shut down isolation and de-energized
50 Ifissuer write a permit SCBA is to use after receiver noted no need SCBA what receiver will do?
‘Ans Stop the work and inform the issuer
Scanned with CamScanner51
Ans
52
Ans
53
Ans
54
Ans
55
Ans
56
Ans
37
Ans
58
Ans
59
Ans
60
Ans
61
Ans
62
Ans
6
Ans
Ans
65
Ans
A group is working on electrical equipment who will install lock and tag out?
issuer and each receiver
Why should the issuer make sure that equipment is De-pressurized?
To prevent person injury
Who lead JSI?
Issuer
‘When must a work permit close?
To communicate the status of work
How many steps to stop work authority?
5 Steps 1) Stop work 2)Investi
ition 3) Communication 4) inform the supervisor 5) Followup
Where you find stop work authority system?
Safety management, system construction, safety manual hand book
Joint site inspection has completed but hazard analysis check list not complete what receiver will do?
Stop the work and inform the issuer
What dutation box tell to receiver?
When he start the work and must stop the work
When renuwed hot work permit?
Issuer and receiver sign the permit
Why joint site inspection conduct the issuer and receiver?
To they can clearlu understand the scope of work
Process use for EOLB when work on hydro carban line?
Drain, issolate, purge, clean and gas test
Shoring benching and slopping use for?
To prevent excavation from cave in
The responsibilty belongs to stand by man work?
Maintain the two way communication between entrant
‘Who must sign a work permit issued to 30days.
Operation and maintanace divison head
Responsibilty of issuer?
Identifi hazards and take precaution