Autoclave / Reactor / Nitrator / :-

1). Insulation :- Type & thickness to be added.


2). Details of internal coil, if applicable.
3). Equipment elevation.
4). IBR applicability of Internal coil.
5). Liquid level (HLL, LLL, NLL)

Economiser :-
1). MOC, Corrosion Allowance.
2). TYPE.
3). Tube rows, Tube pitch, TUBE DIAMETER.
4). Economiser header details.
5). Economiser size.

Shell & Tube Hex / Fin Tube Heat Exchanger / Reboiler / :-


1). Heating / cooling curve detail not required. Only TEMA sheet is required.
2). PHE - % margin requirement.'
3). CIP requirement,if any.

Storage Tank :-
1). Liquid levels for sloshing criteria & bottom nozzle elevation.
2). Sump / Slop requirement.
3). C.A for bottom, shell & roof.
4). Insulation detail.

Vessel :-
1). Insulation :- Type & thickness to be added.
2). Liquid level to be mentioned
3). Limpit coil height / size, HTA to be mentioned.
4). Equipment elevation.

WHB :-
1). We can deskid the scope of supply.