You are on page 1of 2

B U S S T O P C O N S T R U C T I O N P R O C E S S

I. PRE-CONSTRUCTION
A. PLANNING
B. MODELING IN SOFTWARE
II. DURING CONSTRUCTION
A. FOUNDATION
1) EXCAVATION
2) Footings dug, rebar set, inspection
B. SKELETAL CONST.
1. CUT SHS STEEL
2. WELD STL. COLUMN TO STL. PL.
3. BOLT L-BRKTS TO BASE STL. BM.
4. COAT WITH BLACK PAINT
C. TIMBER
1. TIMBER FLOORING&JOISTS
a) CUT WOODS INTO PLANKS
b) SCREW PLANKS ONTO TIMBER JOINTS
c) L-BRKT TIMBER JST. AND STL. BASE FRAME
d) SELF-TAPPING SCREW TIMBER
e) HEX HEAD BOLT&NUTS ON STL.
2. TIMBER SEATING&STEEL SUPPORT
a) L-BRKT TO HOLD STL. BASE FRAME
b) HEX HEAD BOLT&NUTS
c) TRIANGULAR BRKT STL. BASE FRAME
d) COLLUMN VERTICALLY
e) HEX HEAD BOLT&NUTS
f) SCREW LEANING BAR TO STL. BASE FRAME
g) SCREW WOODEN SEATING TO STL. BASE FRAME
D. STL. STR. FRAME
1. CONN. OF STL BM. TO STL COL.
a) FASTEN L-BRKT. TO BASE STL. FRAME
b) HEX HEAD BOLT&NUTS
2. CONN. OF STL. BRACING TO STL COL.
a) STL. GP. TO HOLD MAIN STL COL.
b) WELD RECT PL. EACH END OF BRACING
3. CONN. OF SUB-BEAM TO STL. BRACING
a) 2 DIFF ANGLE GP. TO HOLD ROOF
b) WELD RECT PL. TO SUB-BEAM
c) COAT WITH BLACK PAINT
E. STL ROOF FRAME W/ROOF SHT
1.STL JST. & ROOF FRAME
a) CONNECT W/L-BRKT EACH SIDE
b) HEX HEAD BOLT&NUTS
2.STL. ROOF FRAME-MAIN BM.&BRACING
a) ATTACH ROOF FRAME TO MAIN BEAM
b) FASTEN W/L-BRKT
c) HEX HEAD BOLT&NUTS
3. CONN. OF ROOF TO ROOF FRAME
a) PUT THE SHT AND SECURE
b) ATTACH GLAZING BAR TO STL.ROOF STR.

You might also like