Critical 

Check points for HE 100 

1) Before starting Mill 
 Check chill water flow, must be maintained nominal about 140 l/m at 7˚C and 3 bars.  
 Y‐strainer (mesh 100) must be fitted at chill water supply line and need to be cleaned every 2 
weeks. 
 Check for Product Pressure gauge cutoff settings, must be 1.5 bar 
 Check for Temperature gauge cut settings, must be 60˚C.  
 Check coolant level, must be adequate for machine operation. Please make sure that the 
coolant level is at nominal position. 
 Keep the exterior part of the mechanical seal and the rotating shaft clean as the leakage can be 
detected from here. Good flushing of the mill every time after use will prolong the life span of 
the mechanical seal. 
 Ensure that product pump RPM is at zero before starting the mill. 
 
2) During operation 
 Product Pressure must be maintained in following limits during operation: 
High limit: 1.5 bar, Low limit: 0.1 bar 
 Temperature must be maintained below 60˚C 
 Check for Mechanical seal barrier pressure gauge: Nominal 2‐3 bar.  
 Check for Chill water pressure gauge: Nominal 3‐4 bar 
 To increase the speed, gently turn the 'Potentiometer' at the operating panel in clockwise 
direction. 