Diameter of Pile = mm 400 600 800 Adopted Pile length = m 12 12 12 Pile Capacity wrt soil report = KN 320 720 1250 Pile Ultimate Capacity wrt FOS (=2.5) = KN 800 1800 3125 For Mat supported Pies, we adopt 70% of pile ultimate capacity KN 560 1260 2187.5 Assuming efficiency of pile in group= % 90% 90% 90% Spacing of pile = m 1.86 2.80 3.68 Adopted spacing (4.5D)= m c/c 1.8 2.7 3.6
Capacity of Pile supported ground = KPa 155.6 155.6 151.9
% of settlement % 1.5 1.5 1.5 Spring constant for the pile group = KPa/m 25926 17284 12659 Note: to take effect of 70% of pie capacity, Pile load test is mendatory.