line pressure not devloping above 1ksc

Conveying
Checked(Y|
What to do?
Steps N
.No
Check pressure in localgauge (both digital
and analog) f pressure in analog gauge is more than inform c&
nsure that 1AC is in loaded condition Iftacis unloaded wait for line toget flushed
1 ALT has cold ash then take the alt in manual
and first empty It Cold ash to be removed through hammering
would be
If less than W portion(No ALI acting) then line pressure
heck level in butter hopper ( Should be more than W portion) less than 1 ksc.
f asth is
above W portion, check how much is alt getting filled ALT should getfilled above conical portion
AT not getting filled
1nsure udg manual valve isopen.
3)check
In vent mode- smaller diameter shaft is out in local( green in dcs)
PICheh operation of EQUALIZING valve. Inpressuring mode- bigger diameter shaft is out local( red dcs)
in in
Note: The vent line should not get choked and there should be no
maiuai valve Is open.
EQUALIZING valve during operation.Vent line hole
air lea kage from
should not be there. In that case inform control room.
Fluidising valve operation
Fludising valve to alt must operate during ldg opening. It
can be checked by dip in alt instrument air header pressure.
Ensure manual valves from blower to Buffer hopper pads
butter thopper W portion is cold i s not getting filled
are open and lines are hot. If lines are not hot check that header is
tet et15uring proper line up
hot or not,inform control room.
LDG/UDG to be opened for few seconds with equalising valve in
tere mode to give back pressure in Buffer hopper to Stablish
lepbs the case then hammering in Wportion and keep In severe
1eeatng tll ash fiow is established
anu emergency case dump valve can be closed
( This to be done only in presence of ahp executive)