ACTIVATED PROJECT MANAGER

Score 0 of 1
(skipped)
Question:

Which of the following activities are part of the Realize Phase of a System
Conversion journey to SAP S/4HANA On-Premise Edition?
There are 3 correct answers to this question.

Operations impact analysis

Custom code adjustment

Delta configuration

Development system migration

Sandbox system migration

Response:

Score 0 of 1
(skipped)
Question:

What tool do you use to configure an SAP Business Suite on-premise solution?
Please choose the correct answer.

ABAP Workbench

SAP Implementation Guide

Configuration Composer
Expert Configuration

Response:

Score 0 of 1
(skipped)
Question:

What are the benefits of the SAP best practices?


There are 3 correct answers to this question.

Response:

Fast time to value

Predictable results

Simple on-boarding to cloud

Fixed organizational structure

Reduced functional scope

Score 0 of 1
(skipped)
Question:

What structure level do you see when you access the Roadmap Viewer and chose
work stream navigation?
Please choose the correct answer.

Deliverable

Scenario
Task

Scope Item

Response:

Score 0 of 1
(skipped)
Question:

What are the responsibilities of the Product Owner in release and sprint planning?

There are 2 correct answers to this question.

Analyze the functional and technical dependencies between the user


stories

Define objectives for each release

Prioritize backlog user stories by business priority

Estimate the backlog user stories

Response:

(skipped)
SAP Hybris

SAP S/4HANA Cloud Edition

SAP S/4HANA On-Premise Edition

Hybrid of SAP S/4HANA Cloud Edition and SAP S/4HANA On-Premise


Edition

Question:

What is the best target environment for a System Conversion journey is as


described in the SAP Activate methodology?

Please choose the correct answer.

Response:

Score 0 of 1
(skipped)
Question:

Which of the following are the key responsibilities of the Scrum Master?
There are 3 correct answers to this question.

Task initiator

Responsible for the project delivery

Team protection

Leadership skill
Team support

Response:

Score 0 of 1
(skipped)
Question:

What is the focus of a SCRUM of SCRUMS in an Agile context?


Please choose the correct answer.

Best Practice adoption

Communication to the Project Management Office

Backlog management

Integration topics

Response:

Score 0 of 1
(skipped)
Question:

Which of the following are available in the initial SAP Methodologies JAM Page?
There are 2 correct answers to this question.

Response:

Roadmaps

Accelerators

Task description

Summary

Score 0 of 1
(skipped)
Question:

Which criterion does the Product Owner use to sequence the product backlog?
Please choose the correct answer.

Resource availability

Complexity

Business priority

Relative effort

Response:

Score 0 of 1
(skipped)
Question:

Which activities are part of the Application: Solution Adaption work stream of SAP
Activate for new implementations?
There are 3 correct answers to this question.

Value Audits

Production Support Plan

Value Determination

Change Management Plan

Scope Validation

Response:

Score 0 of 1
(skipped)
Question:
Which of the following SAP S/4HANA Landscape Transformation options are
enabled?
There are 3 correct answers to this question.

System Upgrade

System Consolidation

Migration of Business Units

Migration of Selected Applications

Security Migration

Response:

Score 0 of 1
(skipped)
Question:

What is the final activity in the Realize phase of a new implementation of SAP
S/4HANA cloud edition?

Please choose the correct answer.

Data migration

End-to-End walkthrough

Readiness check

Solution validation

Response:

Score 0 of 1
(skipped)
Question:
Which of the following is not correct about the REALIZE phase?
There are 2 correct answers to this question.

The beginning of the Realize phase the team prepares a list of all the
requirements in a backlog.

The project team ensures that the build is meeting the business
requirements.

The team prepares for operations so that the functionality can be


brought live.

Detailed design workshops are held.

Response:

Score 0 of 1
(skipped)
Question:

What is the objective of a sprint retrospective meeting?


Please choose the correct answer.

Define the stakeholder management approach

Review and prioritize the backlog

Provide formal feedback to the project manager

Improve the SCRUM process

Response:

Score 0 of 1
(skipped)
Question:

How are the build and test tasks planned and executed in the Realize phase?
Please choose the correct answer.
Response:

By using the sprint backlog list as input for each iteration.

By executing regression tests after each iteration

With Q-Gates for sign off after each iteration

By using incremental build in fixed-scope iteration

Score 0 of 1
(skipped)
Question:

Identify the two landscape transformation specific tasks in the explore phase.
There are 2 correct answers to this question.

Setup Landscape Transformation Software

Define the Data Migration Architecture

Perform Client transfer

Run a Landscape Transformation Assessment

Response:

Score 0 of 1
(skipped)
Question:

Which key deliverable includes the development of RICEFW objects?


Please choose the correct answer.

Response:

Development Build
Enhancement Delivery

Sprint Execution

Custom Extensions Management

Score 0 of 1
(skipped)
Question:

What is the purpose of the scrum board?


Please choose the correct answer.

Response:

To document the results of integration testing

To manage the resource load

To show the functional breakdown of the solution scope

To visualize team progress

Question Results
Score 0 of 1
(skipped)
Question:

Which of the following tools are used for rapid database migration?
There are 2 correct answers to this question.

Software Update Manager (SUM)

Database Migration Option (DMO)

SWPM (software provisioning manager)


SAP Solution Manager

Response:

Score 0 of 1
(skipped)
Question:

Which new project roles are introduced with the SAP Activate Agile methodology?
There are 2 correct answers to this question.

SCRUM Master

Product Owner

Integration Lead

Design Thinking Coach

Response:

Score 0 of 1
(skipped)
Question:

What is the hierarchy level under Phase in the SAP Jam space for SAP Activate on-
premise?
Please choose the correct answer.

Key Deliverable

Scenario

Work Stream

Task

Response:
Score 0 of 1
(skipped)
Question:

What are key characteristics of the implementation approach in SAP Activate


Methodology?
There are 3 correct answers to this question.

Premium engagement ready

On-premise only

Fixed scope

Validate solution

Start with SAP Best Practices

Response:

Score 0 of 1
(skipped)
Question:

What is a benefit of using Guided Configuration instead of the Implementation


Guide?
Please choose the correct answer.

It ensures configuration is done using SAP Solution Manager

It eliminates the need for Content Lifecycle Management

It eliminates the need to generate transport requests for configuration


settings

It ensures SAP updates do NOT conflict with customer configurations

Response:
\Score 0 of 1
(skipped)
Question:

What are deliverables of the Application: Integration work stream in the prepare
phase?
There are 3 correct answers to this question.

Fit/Gap Analysis

Data Cleansing

Security Checks

Adaptation Specifications

Network Connectivity Checks

Response:

Score 0 of 1
(skipped)
Question:

Which of the following is a Key Deliverable of the Prepare phase?


Please choose the correct answer.

Solution Scope and Value Determination

Change Impact Analysis and Communication Plan

Baseline Build

Release and Sprint Plan

Response:

Score 0 of 1
(skipped)
Question:

What does a project jump-start include for a new implementation of SAP S/4HANA
on-premise edition?
Please choose the correct answer.

SAP Best Practices

Rapid prototyping

Project team training

Full project SCRUM

Response:

Score 0 of 1
(skipped)
Question:

Which of the following is not a characteristic that the quality principles are based
on?
Please choose the correct answer.

Experience of Typical Pitfalls

Best Practices

SAP Quality Award example winners

International standard

Response:

Score 0 of 1
(skipped)
Score 0 of 1
(skipped)
Question:
Which of the following tools is used to install SAP S/4HANA.
Please choose the correct answer.

Response:

SAP Solution Manager

SWPM (Software Provisioning Manager)

Cloud Application Library

Data Migration server

Score 0 of 1
(skipped)
Question:

In what respect is SAP Activate Methodology different from the ASAP


Methodology?
Please choose the correct answer.

Supports cloud deployments

Supports only new implementations

Leverages iterative incremental build

Includes Fit/Gap analysis instead of Blueprint

Response:

Score 0 of 1
(skipped)
Question:

Which of the following are the benefits of SAP JAM?


There are 2 correct answers to this question.

Response:
Easy to use

Reduced Recovery Time

Highly available

User collaboration

Score 0 of 1
(skipped)
Question:

Which activities are critical for delivering Agile projects?


There are 2 correct answers to this question.

Retrospective agenda creation

Sprint planning

Release planning

Blueprint scheduling

Response:

Score 0 of 1
(skipped)
Question:

For the cloud edition, there is an additional work stream for integration
with on-premise systems

For the cloud edition, there is an additional Q-Gate for integration with
on-premise systems
For on-premise, there is an additional Q-Gate for system installation

For on-premise, there are additional deliverables for the system setup

What is a difference between the SAP Activate methodology for a new


implementation of SAP S/4HANA cloud edition and a new implementation of SAP
S/4HANA on-premise?
Please choose the correct answer.

Response:

Score 0 of 1
(skipped)
Question:

Which of the following can be used to navigate through the roadmap?


There are 2 correct answers to this question.

Response:

Tasks

Phases

Workstreams

Deliverables

Score 0 of 1
(skipped)
Question:

Arrange the following in the correct sequence of steps followed for a 'Fit to
Standard' workshop.
Please choose the correct answer.

Response:

Discuss how the process fit with customer requirements, Review Best
Practice Process Flow, Demonstrate Business Scenarios and Concepts,
Identify required configuration, Enable customer on execution of
scenarios, Identify gaps

Review Best Practice Process Flow, Demonstrate Business Scenarios


and Concepts, Identify required configuration, Discuss how the process
fit with customer requirements, Enable customer on execution of
scenarios, Identify gaps

Demonstrate Business Scenarios and Concepts, Review Best Practice


Process Flow, Identify required configuration, Discuss how the process
fit with customer requirements, Enable customer on execution of
scenarios, Identify gaps

Review Best Practice Process Flow, Demonstrate Business Scenarios


and Concepts, Discuss how the process fit with customer requirements,
Identify gaps, Identify required configuration, Enable customer on
execution of scenarios

Score 0 of 1
(skipped)
Question:

SAP now offers the ability to deploy and manage solutions in which of the
following environments?
Please choose the correct answer.

Response:

Cloud and On-premise

On-premise

Cloud

Cloud, On-premise and Hybrid

Score 0 of 1
(skipped)
Question:
Which of the following tasks are part of the Production support after the Go Live
key deliverable?
There are 2 correct answers to this question.

Resolve issues identified during the Hyper Care period

Provide further training to customer end users

Set up the Operations Control Center

Perform a Technical systems test

Response:

Score 0 of 1
Score 0 of 1
(skipped)
Question:

What is the purpose of the SAP Activate Methodology?


Please choose the correct answer.

Response:

To enable access to the SAP ecosystem

To accelerate the initial implementation of SAP S/4HANA

To provide end-to-end integrated application lifecycle management

To manage project and solution documentation

Score 0 of 1
(skipped)
Question:

Which content is made available after you activate SAP Best Practices for a new
financial implementation?
There are 2 correct answers to this question.

Response:
Implementation Guide

Online help

Pre-configured business processes

Standard chart of accounts

Score 0 of 1
(skipped)
Question:

Who determines the priority of user stories in the backlog of an Agile project?
Please choose the correct answer.

Project Manager

Project Team

SCRUM Master

Product Owner

Response:

Score 0 of 1
(skipped)
Question:

Which tool can you use to collaborate with other SAP Activate methodology
practitioners?
Please choose the correct answer.

Response:

SAP Jam

SAP Solution Manager


SAP Implementation Assistant

Roadmap Viewer

Score 0 of 1
(skipped)
Question:

What are SCRUM of SCRUMS?


Please choose the correct answer.

Integration meeting between the various project teams

Alternative to regular SCRUM process for smaller teams

Mechanism for gathering and validating requirements

Frequent inspection of code and configuration prior to quality gates

Response:

Score 0 of 1
(skipped)
Question:

What is the most granular level of the methodology you can view in the Roadmap
Viewer?
Please choose the correct answer.
Scenario

Task

Deliverables

Phase

Response:

Score 0 of 1
(skipped)
Question:

In which tools can the project team across the SAP Activate Methodology content
including accelerators?
There are 2 correct answers to this question.

Response:

SAP Community Network

Roadmap Viewer

SAP Jam

SAP Service Marketplace

Score 0 of 1
(skipped)
Question:

How do you gain access to the SAP Activate Methodology Jam site?
Please choose the correct answer.

Register on SAP Service Marketplace

Send e-mail to SAP contact address


Submit e-mail address via on-line form

Join SAP S/4HANA group on SAP Community Network

Response:

Score 0 of 1
(skipped)
Question:

What is the purpose of the Solution Builder tool in the SAP Activate Guided
Configuration?
Please choose the correct answer.

Response:

To activate the Best Practices content

To create delta building blocks for complementary content

To personalize activated, ready-to run business processes

To create customer-specific scope items

Score 0 of 1
(skipped)
Question:

What do you do during Sprint Execution?


Please choose the correct answer.

End a sprint when the sprint backlog items are all complete

Measure the sprint progress with a percentage complete report

Hold a retrospective at the end of each week

Present status of selected user stories in the sprint scope on a


scrumboard

Response:

What is SAP Activate?


Please choose the correct answer.

A step-by-step instruction on how to remove from SAP best practices to


your custom solution

A methodology for each of the deployment modes (cloud , on-premise,


hybrid)

A bundle of ASAP , SAP Launch , and Rapid Deployment Solutions

A combination of SAP best practices , methodology, and guided


configuration

Response:

Score 0 of 1
(skipped)
Question:

What do you do during post cutover?


Please choose the correct answer.

Response:

Setup Operational Support

Perform the Verification Session of the SAP Going Live Check

Perform Technical System Test

Conduct Organizational Readiness Check

Score 0 of 1
(skipped)
Question:
What must you do when you implement SAP Business Suite On-Premise with SAP
Best Practices?
Please choose the correct answer.

Activate and apply SAP Best Practices content with the self-service
configuration UI

Activate and apply SAP Best Practices with SAP Solution Manager

Apply SAP Best Practices with the Configure your Solution application

Assemble and apply SAP Best Practices to the system

Response:

Score 0 of 1
(skipped)
Question:

Which estimation technique can be used in Agile project delivery to size the user
stories during sprint planning?
Please choose the correct answer.

Response:

Detailed bottom-up effort estimate the breaks each user story up into
hours or shorter tasks

Relative estimate in ideal person days that reflects the best estimate
provided by the project team

Detailed bottom-up effort estimate by the SCRUM Master in story points


based on the user story complexity

Product Owner’s relative estimate of the effort that will be needed to


implement the user story

Score 0 of 1
(skipped)
Question:
In the System conversion to SAP S/4 HANA Deploy phase, which of the following
tasks are included?
Please choose the correct answer.

Hyper care support

Interface setup

Final testing

Scheduling project plan

Response:

Score 0 of 1
(skipped)
Question:

Which navigation option do you use in the Roadmap Viewer to access the SAP
Activate Methodology content?
Please choose the correct answer.

Navigate by assigned Delivery Mode

Navigate by RACI matrix accountability

Navigate by work stream

Navigate by Project Team Member Role

Response:

Score 0 of 1

(skipped)
Question:

What is a key characteristic of SAP Activate for new implementations of S/4HANA


cloud edition?
Please choose the correct answer.

Response:

Start with executable content

Limited involvement of business stakeholders

Waterfall approach

Design-based

Score 0 of 1
(skipped)
Question:

Which activities are part of the Design and Configuration application of the SAP
Activate methodology?
There are 2 correct answers to this question.

Response:

Perform Fit/Gap Analysis

Schedule kick-off workshop

Conduct Scope Validation

Confirm Integration prerequisites

Score 0 of 1
(skipped)
Question:

Your project is preparing for the Fit/Gap analysis workshops. If you use the Agile
approach, what sequence of activities do you perform in the Explore Phase?
Please choose the correct answer.

Response:

a. Conduct Solution Validation workshops


b. Set reference value
c. Prioritize initial backlog
d. Conduct Delta Design workshops

a. Set reference value


b. Prioritize initial backlog
c. Conduct Delta Design workshops
d. Conduct Solution Validation workshops

a. Conduct Solution Validation workshops


b. Conduct Delta Design workshops
c. Set reference value
d. Prioritize initial backlog

a. Set reference value


b. Conduct Solution Validation workshops
c. Prioritize initial backlog
d. Conduct Delta Design workshops

Score 0 of 1
(skipped)
Question:

Which of the following tasks are required in the Prepare Phase?


There are 3 correct answers to this question.

Response:

Train the project team

Set up the infrastructure to support the project

Define the communication plan

Approve the test strategy

Identify relevant SAP Best Practices

Score 0 of 1
(skipped)
Question:
What are the responsibilities of the Project Team on level 4 in the picture below?

There are 2 correct answers to this question.

Set Project policy, standards and oversight

Set business priorities, goals and objectives

Identify and resolve issues and risks

Perform status reporting and communication

Response:

Score 0 of 1
(skipped)
Question:

What is the purpose of the Solution Validation activity in the Explore phase?
There are 3 correct answers to this question.

Response:

To verify technical installation

To identify gaps
To log additional scope items

To challenge changes to standard

To educate project participants

Score 0 of 1
(skipped)
Question:

How can SRCUM teams be organized?


Please choose the correct answer.

By job title

By work stream

By project phase

By project governance level

Response:

Score 0 of 1
(skipped)
Question:

What information does the product team need so that they can estimate the
relative size of backlog user story correctly?

Please choose the correct answer.

Response:

Available project resources

Test strategy
Definition of Done

Overall project schedule

Score 0 of 1
(skipped)
Question:

Which accelerations can you use during the Scope Validation/Fit-Gap Analysis
activity in the Explore Phase?
There are 2 correct answers to this question.

Sprint Backlog Template

RICEF Specification Template

Solution Validation Workshop

Quality Gate Checklist

Response:

Score 0 of 1
(skipped)
Question:

Which of the following is true about a cloud implementation project?


There are 2 correct answers to this question.

Response:

In the prepare phase of a cloud implementation project the project


team provide the customer with materials to review as self-enablement.

The entire transport system is kept intact and up and running.

The Starter System is specific to SAP S/4HANA Cloud.


Starter Systems are not required to be in place for the 'Fit to Standard'
workshops.

Score 0 of 1
(skipped)
Question:

Which accelerator can help you document the detailed design of solution
extensions?
Please choose the correct answer.

Response:

Sprint Backlog Template

RICEF Specification Template

Change Request Template

Product Backlog Template

Question Results
Score 0 of 1
(skipped)
Question:

Which of the following are not phases of the SAP Activate methodology?
There are 2 correct answers to this question.

Response:

Realize

Preparation

Go-Live & Support

Prepare

Score 0 of 1
(skipped)
Question:

Which content packages are available in the SAP Package Library?


There are 2 correct answers to this question.

Response:

SAP Activate Methodology

SAP Best Practices

Solution Builder

Rapid Deployment Solutions

Score 0 of 1
(skipped)
Question:

When do you perform User Acceptance Testing during the Agile Build?
Please choose the correct answer.

Response:

Before Integration Testing

During each Firm-up Sprint

After each Sprint

After Integration Testing

Score 0 of 1
(skipped)
Question:

Which tools does SAP Activate provide to support Guided Configuration?


There are 3 correct answers to this question.

Response:
Solution Builder

Expert Configuration

Self Service Configuration

SAP Solution Composer

Model Company

Score 0 of 1
Score 0 of 1
(skipped)
Question:

Which of the following is not correct about workstreams?


There are 2 correct answers to this question.

Response:

It can span phases

It is assigned as an attribute to phases, deliverables and tasks

It is a collection of related deliverables

Workstreams are dependent on phase start and end

Score 0 of 1
(skipped)
Question:

How can the project manager help to keep momentum in the project and help to
keep the customer involved?
There are 2 correct answers to this question.

Response:

Increase the number of Q-Gates


Add customer resources to the project to reduce the need for
formal training

Leverage agile cycles to build and test the solution

Walk through the solution processes with the stakeholders

Score 0 of 1
(skipped)
Question:

Which collaboration features can SAP Activate Jam users access?


There are 2 correct answers to this question.

Response:

Ask questions

Update Key Deliverable wikis

Tweet questions

Comment on documents

Score 0 of 1
(skipped)
Question:

Score 0 of 1
(skipped)
Question:

Which component of SAP Activate offers customers a reference solution in the


cloud for a quick start?
Please choose the correct answer.

Response:

SAP Implementation Assistant


SAP Activate Methodology

Guided Configuration

SAP Best Practices

Score 0 of 1
(skipped)
Question:

When does the project team receive formal confirmation that the user stories are
completed to the satisfaction of the product owner?
Please choose the correct answer.

Response:

During the daily SCRUM meeting

During the sprint retrospective

During the sprint review

During user acceptance testing

Score 0 of 1
(skipped)
Question:

What technique helps agile project teams to prioritize a large, flat backlog?
Please choose the correct answer.

Response:

Fit/Gap Analysis

User Story Mapping

Retrospective
Planning Poker

Score 0 of 1
(skipped)
Question:

Who determines the tasks that are required to complete the committed backlog
items in a sprint?
Please choose the correct answer.

Response:

Project Manager

Product Owner

Project Team

SCRUM Master

Score 0 of 1
(skipped)
Question:

Which of the following building blocks are part of the SAP S/4HANA platform?
There are 2 correct answers to this question.

Response:

SAP Fiori UX

SAP HANA in-memory database

SAP Solution Manager

LOB Cloud Solution

Score 0 of 1
(skipped)
Question:
Which key activities does the Guided Configuration support you with?
There are 3 correct answers to this question.

Response:

Manage roles of configuration users

Train new users

Create test data

Test configured processes

View solution scope

Score 0 of 1
(skipped)
Question:

How many deliverables are a part of the Key Deliverable 'Project Initiation'?
Please choose the correct answer.

Response:

Three

Two

One

Four

Score 0 of 1
(skipped)
Question:

Which of the following activities support the Realize Phase of a System Conversion
journey to SAP S/4HANA On-Premise Edition?

There are 2 correct answers to this question.

Response:
Custom code Adjustment planning

Data aging configuration

Non-production systems migration

Value determination

Score 0 of 1
(skipped)
Question:

Which of the following activities are part of the Deploy Phase of a Landscape
Transformation journey to SAP S/4HANA On-Premise Edition?
There are 2 correct answers to this question.

Response:

Solution Activation

Optimize software Change Control Management

Training delivery

Access organizational and production readiness

Score 0 of 1
(skipped)
Question:

According to the Definition of Done, which activity must be completed for each
sprint?
Please choose the correct answer.

Response:

End user training must be delivered


Solution must be built and configured in the development system
(DEV)

Functionality must be tested in the Quality system (QAS)

Functionality must be released to the business

Score 0 of 1
(skipped)
Question:

Your project is performing some high-level planning for a System Conversion


journey from SAP Business Suite to SAP S/4HANA on-premise edition. What is the
correct sequence of selected key deliverables across the project phases?
Please choose the correct answer.

Response:

a. Code adjustment
b. Detailed System Assessment
c. Production Readiness Check
d. Validation of Migration

a. Production Readiness Check


b. Detailed system Assessment
c. Code Adjustment
d. Validation of Migration

a. Detailed system Assessment


b. Code Adjustment
c. Validation of Migration
d. Production Readiness Check

a. Detailed system Assessment


b. Production Readiness Check
c. Code Adjustment
d. Validation of Migration

Score 0 of 1
(skipped)
Question:

In SAP Activate, what replaces the detailed Blueprint from ASAP?


Please choose the correct answer.

Response:

Business Process Mapping

Value Determination

Custom Extension management

Fit/Gap Workshops

Score 0 of 1
(skipped)
Question:

What is the minimum number of quality gates mandated by the SAP Activate
methodology?
Please choose the correct answer.

Response:

Score 0 of 1
(skipped)
Question:

What can users do in the Roadmap Viewer tool?


Please choose the correct answer.

Response:

Display and navigate detailed SAP Activate methodology WBS

Upload SAP Activate WBS into SAP Solution Manager7.1

Download full SAP Activate methodology content for use off-line

Create a customer-specific version of SAP Activate Methodology

Score 0 of 1
(skipped)
Question:

Which activity is part of the SAP Activate Methodology for a new implementation
of SAP S/4HANA on-premise edition but NOT of the cloud edition?

Please choose the correct answer.

Response:

End-to-End Integration Test

User Acceptance Test

Unit Test

Technical System Test

Score 0 of 1
(skipped)
Question:

Which deliverable is specific to on-premise and NOT for the cloud?


Please choose the correct answer.

Response:
Technical Design Solution

Knowledge Transfer

Adaptation Specification

Learning Needs Analysis

Score 0 of 1
(skipped)
Question:

What is the purpose of a firm-up sprint?


Please choose the correct answer.

Response:

To demonstrate functionality from previous sprint

To perform sprint testing

To revise a release plan and sprint plan

To run end-to-end integration test

Score 0 of 1
(skipped)
Question:

Which of the following is not correct about Fit/Gap Analysis?


There are 2 correct answers to this question.

Response:
Minimize the needs for rework during realization.

Validate pre-activate and pre-assembled solution in the


development system.

Prioritize delta requirement and gaps.

Drive towards adopting customers processes.

Score 0 of 1
(skipped)
Question:

Which of the following are the pillars of SAP Activate?


There are 3 correct answers to this question.

Response:

SAP Launch Methodology

SAP Activate Methodology

SAP ASAP Methodology

Guided Configuration

SAP Best Practices

Score 0 of 1
(skipped)
Question:

Which of the following content best outlines the scope of the Integration Test?
Please choose the correct answer.

Response:

a. Prototype
b. Delta/gap solutions
c. Data flows with non-SAP application

a. Prototype
b. Delta configuration
c. Data flows between SAP solutions

a. Solution baseline
b. Delta/gap solutions
c. Data flows with non-SAP application

a. Solution baseline
b. Delta configuration
c. Data flows between SAP solutions

Score 0 of 1
(skipped)
Question:

Which of the following activities are performed in the Explore phase of SAP
Activate in SAP S/4HANA Implementation?
There are 3 correct answers to this question.

Response:

Adjusting custom code objects

Implementing best practices

Creating transactional data

Organizational structure

Changing master data

Score 0 of 1
(skipped)
Question:

What are the three pillars of SAP Activate?


There are 3 correct answers to this question.
Response:

SAP Activate Methodology

SAP Best Practices

SAP S/4HANA in-memory database

SAP Solution Manager

Guided Configuration

Score 0 of 1
(skipped)
Question:

The tasks associated with Landscape transportation are in which workstream?


Please choose the correct answer.

Response:

System & Data Migration

Transition to Operations

Technical Architecture and Infrastructure

Application Solution Adoption

Score 0 of 1
(skipped)
Question:

Which of the following statements about Scrum is correct?


Please choose the correct answer.

Response:

In Scrum, the team is Self-organized, define all task necessary for all project life
cycle.
The three ceremonies are sprint planning, daily scrum, sprint review
(retrospective).

Scrum Master defines and prioritizes features and gathers requirements.

In Scrum, as best practices, we have three main roles, and three artifacts or
three ceremonies.

Score 0 of 1
(skipped)
Question:

Which of the following Key Deliverables do you complete in the Solution Design
work stream in the Explore phase?
There are 3 correct answers to this question.

Response:

Design for the Gaps and Deltas

Baseline Build

Data Migration Approach

Validation Workshops

Solution Scope and Value Determination

Score 0 of 1
(skipped)
Question:

Which activity helps the project team to add the user stories to the product
backlog?
Please choose the correct answer.

Response:

Planning the User Acceptance Test


Preparing a Project Schedule

Conducting the Solution Validation

Assessing Project Risks

Score 0 of 1
(skipped)
Question:

What is the key characteristic of Agile project delivery?


Please choose the correct answer.

Response:

Frequent and detailed project scheduling

Formal and detailed documentation

Iterative build with frequent inspections

Frequent Quality Gates

Score 0 of 1
(skipped)
Question:

In which SAP Activate methodology phase does the team complete the
Transformation Strategy?
Please choose the correct answer.

Response:

Deploy

Realize

Explore
Prepare

Score 0 of 1
(skipped)
Question:

What is a deliverable of the Application. Customer Team Enablement work stream


in the Prepare phase of SAP Activate?

Please choose the correct answer.

Response:

Project Charter

Project Documentation

Knowledge transfer to end users

Learning plan

Score 0 of 1
(skipped)
Question:

What does SAP Activate recommend to keep team members informed and aligned?
Please choose the correct answer.

Response:

Daily status meeting with project manager

Daily team stand-up meeting

Daily e-mail status updates to project manager

Daily progress review meeting with sponsor

Score 0 of 1
(skipped)
Question:
What do you do during an iterative approach to build a solution?
Please choose the correct answer.

Response:

Build the solution module by module

Deliver a prototype of the solution

Provide a working solution only at the end of the release

Include frequent inspection check-points

Score 0 of 1
(skipped)
Question:

In which SAP Activate methodology phase does the team identify and design
functional quick wins in scope of the conversion project?
Please choose the correct answer.

Response:

Realize

Deploy

Prepare

Explore

Score 0 of 1
(skipped)
Question:

In which phase of the SAP Activate methodology does the team complete the
Transformation Planning?
Please choose the correct answer.

Response:
Deploy

Explore

Prepare

Realize

Score 0 of 1
(skipped)
Question:

In Which phase does the Transition to Operations work stream start?


Please choose the correct answer.

Response:

Explore

Realize

Score 0 of 1
(skipped)
Question:

In which phase do you verify that the SAP Best Practice solution scenarios meet
the business needs of the customer?
Please choose the correct answer.

Response:

Explore

Deploy

Realize

Prepare

Score 0 of 1
(skipped)
Question:

In which phase do you create a prioritized list of user requirements?


Please choose the correct answer.

Response:

Realize

Explore

Prepare

Deploy

Score 0 of 1
(skipped)
Question:

In which SAP Activate methodology phase does the team complete the Integration
Validation?
Please choose the correct answer.

Response:

Explore

Realize

Deploy

Prepare

Score 0 of 1
(skipped)
Question:
In which phase of the SAP Activate methodology does the team complete the Cut-
over Rehearsal?
Please choose the correct answer.

Response:

Prepare

Explore

Realize

Deploy

Score 0 of 1
(skipped)
Question:

In which phase of the SAP Activate Methodology does the team complete the
System Assessment?
Please choose the correct answer.

Response:

Deploy

Explore

Prepare

Realize

Score 0 of 1
(skipped)
Question:

In which of the following project phases is it important to plan and schedule data
loads followed by load validation activities?
Please choose the correct answer.

Response:
Explore

Deploy

Prepare

Realize

Score 0 of 1
(skipped)
Question:

In which phase you execute the User Acceptance Test?


Please choose the correct answer.

Response:

Build and Test

Deploy

Final Preparation

Realize