You are on page 1of 1

Geological Map

PT. Ganda Dinamika


BS SKALA
WPM 0 2 4
Kilometer

Posyandu Karangan Log pond SI


Luas = 191.85 Ha
Desa Batu Lepoq
Gardu Induk PLN Blok Timur 1
GCVar = 2433 Pos Sumalindo Logging
TS (%) = 3.28
ASH (%) = 7.7
TM (%) = 59.8
Sta 15
Pasar Karangan
N 274 E/32
OC = 1.5 M Sta 3 Legends :
Portal Bima Agri Sawit Mess Telen N 306 E/26

GCVar = 3725 GCVar = 3606 GCVar = 2573


OC = 25 cm
26 Plan CPO Contour
MESS PT BAS
TS (%) = 3.07 TS (%) = 2.96 Darma Wanita Karangan TS (%) = 1.53
ASH (%) = 2.6 ASH (%) = 9.5 ASH (%) = 15.5 S. River
Ka
TM (%) = 42.7 TM (%) = 40.9 TM (%) = 45.5 rang
PT BAS AFDELING 8 an
Sta 10
ZKB STA 18 Road
NON COAL N 98 E/11 SMKN 1 Karangan
OC = 5 cm STA 8
OC = 25 cm NON COAL Study Consession (PT. Ganda Dinamika)
STA 11 Puskesmas
9
N 55 E/34
NON COAL 11 STA 9 Production Consession (PT. IC & PT. GAM)
34 N 190 E/9
GCVar = 3502 Sta 7 43 NON COALBlok Barat
STA 16 Mess Telen
TS (%) = 1.02 N 081 E/43 COAL
OC = 140 cmSTA 17 Strike dip
ASH (%) = 2.8 GCVar = 3435 Luas = 1.661.66 Ha 31

Blok Sesar NON COAL TS (%) = 0.27


TM (%) = 45.6 Blok Timur 2
Luas = 40.13 Ha
Sta 6
ASH (%) = 3.8
TM (%) = 46.5
Sta 14
GD Luas = 470.73 Ha
Mess Telen
Domaring Fm (Tmpd)

Sta 13 N 040 E/31 NON COAL Afdeling I Telen Manumbar Fm (Tmme)


N 60 E/28 28
OC = 90 cm
31
NON COAL
Sta 12 GCVar = 3670
35
N 68 E/35 TS (%) = 1.45 Pos BAS Pos BAS Afdaling II Telen Maluwi Fm (Tmma)
Pos BASOC = 0.45 cm
ASH (%) = 2.2
GCVar = 3861
TS (%) = 1.91 TM (%) = 41.0 Lebak Fm (Toml)
Afdeling IV BAS
ASH (%) = 2.9
TM (%) = 39.9 Blok Timur 3 Maau Fm (Tomm)

Luas = 96.52 Ha Sta 4


N 205 E/25
Mess Telen Mangkupa Fm (Teom)
Afdeling II Telen NON COAL
25 Mess Telen
23
Pos Telen
Sta 5 Marah Fm (Tem)
N 202 E/23 Sta 2
S. M Desa Baay OC = 100 cm N 139 E/41
NON COAL
uar
aB 41
Pabrik BAS ula
n
GCVar = 3668
TS (%) = 2.08
Afdeling III Telen

ASH (%) = 3.4

GMW TM (%) = 40.4


Mess Telen

Pabrik Telen
Afdeling III Telen

IC GAM

You might also like