(CHAPTER 1. CONSTRUCTION AND
Praia esc eaaoaa ales COMPARTWENTALIZATION
273, Interior floor fishes shall be arsed in accordance with 10.6.4 based on test results
ftom NFPA 253, Standard Method of Test for Critical Radiant Flux of loo Covering
‘pete Using » Radiant Heat Energy Source, or ASTM E648, Standard Test Method for
Cita Radiant Fux of Floor Covering Systems Using @Radlant Heat Energy Source
374, Chasel interior Floor Finish
37.4.4. Cas | Inter flor fiih shall have 9 crea radiant flux of not less than 0.45
whem?
375, Classi iteror Floor Fish
375.1. Css Wintel flor finch shall have 2 etal radiant flux of not less than 0.22
Wem? but ess than 048 Wier,
37°52, Wherever the use of Class interior flor fish required, Clas interior flor fish
sal be permitted.
38, Interior Finish in relation to Automatic Sprinklers
38.1. Where an approved automatic sprinkler stem is provided, Class leterior wall and
telng finish materia shall be perited In any location where Cass Bs requlved, and
(age 8 interior wal and eeing fish mates Shall be permitedin any location where
(ass is required
38.2, Where an approved automatic spinler system is provided throughout the fire
compartment or smoke compartment containing the interior floor fish Clas interior
floor fish shall be permitted in any lection where Cass | interior floor fish i
requced, nd where Cass requited no citi radian ux rating sallbe required
39, Material Approval
394, Allthe Matra, Systems, Assembles, equpment, Products and Accesscres referred to
in this chapter wth respect to Life Safety, Fite Safety and Emergency Serces shall be
Usted, Approved and Registre by the Cv Defence Material Approval Ceparement
28.2, The above requirement applies tll the products with or without intentional isting
registration or approval
40. Further References
Siewert nel har oe an Senne hase eons oF
c aa)(CHAPTER 1. CONSTRUC
COMPARTMENTALIZATION
Fete i
ee rie
‘owe
1 ente"onp torn Se nn)
reagent: UL Tefen git tem |
A steno ring an OS
ssmesie; Totter em fester ete
c EaUnited Arab Emicates
Ministry of interior
Chi Defense 6.4.
Fir International Labs &
House of Expertise Training
Center Approval Committee
Sac pata
IVI. DEFENCE APPROVED,
INTERNATIONAL TESTING AND CERTIFICATI IES
5 Noe SORE PAGENO
“asa Ts =
APPL, SPA Tiare nceneaTON |e
aN SELGUM Tse eceRTCATION | — on
aM TRADA, UTED NGO HST A CERTIATION | oF
BRE GLOGALLT, UNITED KINGDOM. TESTING &CERTIFATON | 10
TSE ARIS STANDARD NSTTUTE UTED HNGOON
HORTY ERTCATION SERVICES UAE “ERT EATION
‘FOE POLAND Teeacotmeon
‘DURA CENTRAL LABORATORY ‘GERTFICATION |
BEAR ETHERS Ts KeeTFCRTON
Tec, ANE si cee
‘BOVA WARRINGTON, UE STNG
EAESHATION TESTING LABORATORTNG USA mie
FACTORY MUTUAL ESTAR USA
IFCCERTMCRTON, UNITED KINGDOM
Ts FOUN. Tis cE
aa ERMAN “Tsing scamincaTOn
HPA reser Gb SERVANT ING ECERTBCATION
Ss NO LT, MAND “Testes ceMNCATON
TEENA, An TESTING BEERTCATION
TELSTETION, NETHER THsTNG 8 ERTACATIN
THOMAS BEL WHT UAE
TOVSUD PSB PV LTD, SGAPORE
eta pi isc fiefs xfeelse| 2
eles fe} lle ele ll
‘OL UNDERWRITERS ABORATORES NG UR
ji Defense GHQ | fegitered abortorerandcariiatonsose 20s‘United Arab Emirates
‘Ministry of interior
Ci Defense 6.4.0
Fie international Labs &
House of Expertise & Training
tor Approval Commitee
= Eo
as a ys
fauieie
es ela sa
ea ly a igh
eles Alas
Eos
Srarromineonsmasio | wrt BmacToNDue wear ows
Defense GHQ | neystered Laboratories and eriaton dias 25/12/2015,