You are on page 1of 4
(CHAPTER 1. CONSTRUCTION AND Praia esc eaaoaa ales COMPARTWENTALIZATION 273, Interior floor fishes shall be arsed in accordance with 10.6.4 based on test results ftom NFPA 253, Standard Method of Test for Critical Radiant Flux of loo Covering ‘pete Using » Radiant Heat Energy Source, or ASTM E648, Standard Test Method for Cita Radiant Fux of Floor Covering Systems Using @Radlant Heat Energy Source 374, Chasel interior Floor Finish 37.4.4. Cas | Inter flor fiih shall have 9 crea radiant flux of not less than 0.45 whem? 375, Classi iteror Floor Fish 375.1. Css Wintel flor finch shall have 2 etal radiant flux of not less than 0.22 Wem? but ess than 048 Wier, 37°52, Wherever the use of Class interior flor fish required, Clas interior flor fish sal be permitted. 38, Interior Finish in relation to Automatic Sprinklers 38.1. Where an approved automatic sprinkler stem is provided, Class leterior wall and telng finish materia shall be perited In any location where Cass Bs requlved, and (age 8 interior wal and eeing fish mates Shall be permitedin any location where (ass is required 38.2, Where an approved automatic spinler system is provided throughout the fire compartment or smoke compartment containing the interior floor fish Clas interior floor fish shall be permitted in any lection where Cass | interior floor fish i requced, nd where Cass requited no citi radian ux rating sallbe required 39, Material Approval 394, Allthe Matra, Systems, Assembles, equpment, Products and Accesscres referred to in this chapter wth respect to Life Safety, Fite Safety and Emergency Serces shall be Usted, Approved and Registre by the Cv Defence Material Approval Ceparement 28.2, The above requirement applies tll the products with or without intentional isting registration or approval 40. Further References Siewert nel har oe an Senne hase eons oF c aa) (CHAPTER 1. CONSTRUC COMPARTMENTALIZATION Fete i ee rie ‘owe 1 ente"onp torn Se nn) reagent: UL Tefen git tem | A steno ring an OS ssmesie; Totter em fester ete c Ea United Arab Emicates Ministry of interior Chi Defense 6.4. Fir International Labs & House of Expertise Training Center Approval Committee Sac pata IVI. DEFENCE APPROVED, INTERNATIONAL TESTING AND CERTIFICATI IES 5 Noe SORE PAGENO “asa Ts = APPL, SPA Tiare nceneaTON |e aN SELGUM Tse eceRTCATION | — on aM TRADA, UTED NGO HST A CERTIATION | oF BRE GLOGALLT, UNITED KINGDOM. TESTING &CERTIFATON | 10 TSE ARIS STANDARD NSTTUTE UTED HNGOON HORTY ERTCATION SERVICES UAE “ERT EATION ‘FOE POLAND Teeacotmeon ‘DURA CENTRAL LABORATORY ‘GERTFICATION | BEAR ETHERS Ts KeeTFCRTON Tec, ANE si cee ‘BOVA WARRINGTON, UE STNG EAESHATION TESTING LABORATORTNG USA mie FACTORY MUTUAL ESTAR USA IFCCERTMCRTON, UNITED KINGDOM Ts FOUN. Tis cE aa ERMAN “Tsing scamincaTOn HPA reser Gb SERVANT ING ECERTBCATION Ss NO LT, MAND “Testes ceMNCATON TEENA, An TESTING BEERTCATION TELSTETION, NETHER THsTNG 8 ERTACATIN THOMAS BEL WHT UAE TOVSUD PSB PV LTD, SGAPORE eta pi isc fiefs xfeelse| 2 eles fe} lle ele ll ‘OL UNDERWRITERS ABORATORES NG UR ji Defense GHQ | fegitered abortorerandcariiatonsose 20s ‘United Arab Emirates ‘Ministry of interior Ci Defense 6.4.0 Fie international Labs & House of Expertise & Training tor Approval Commitee = Eo as a ys fauieie es ela sa ea ly a igh eles Alas Eos Srarromineonsmasio | wrt BmacToNDue wear ows Defense GHQ | neystered Laboratories and eriaton dias 25/12/2015,

You might also like