You are on page 1of 3

Transmittal Report:

Created by AutoCAD eTransmit martes, 7 de diciembre de 2021, 19:58.

Drawing:
This is a transmittal based on ALINEAMIENTO Y PERFIL 1AUPV - copia (1).dwg.

Files:

Root Drawings: ALINEAMIENTO Y PERFIL 1AUPV - copia (1).dwg

Documento XML References:


_Autodesk Civil 3D Metric (2011) Roadway Design Standards.xml

The following files were excluded from the transmittal:


TERRENO FINAL--.xml
EC 1 TRAMO 1B DOBLE VIA 16+106.18-16+860.dwg
EC 2 TRAMO 1B DOBLE VIA 16+860--26+540.dwg
EC 3 TRAMO 1B DOBLE VIA 26+240--28+510.dwg
EC 4 TRAMO 1B DOBLE VIA 28+510--34+860.dwg
EC 5 TRAMO 1B DOBLE VIA 34+860--38+500.dwg
EC 6 TRAMO 1B DOBLE VIA 38+500--39+553.04.dwg
TRAMO 1B VIA EXISTENTE.dwg
TRAMO 1B VIA NUEVA.dwg
TRAMO 1A UNION PAR VIAL.dwg
TRAMO 1A CARACOLLO.dwg
ALINEAMIENTO Y PERFIL 1AUPV.dwg
CARIMBO_1AUPV.dwt
acad.fmp
simplex.shx
ltypeshp.shx
arial.ttf
sanss___.ttf
BOD_R.TTF
italic.shx
times.ttf
Concrete.Cast-In-Place.Flat.Grey.1.jpg
Sitework.Planting.Grass.Short.jpg
Sitework.Planting.Grass.Thick.jpg
Sitework.Planting.Gravel.Crushed.jpg
Sitework.Planting.Gravel.Mixed.jpg
Sitework.Planting.Soil.jpg
PLANTA.dwg
pavimento.dwg
romand.shx
rejilla.dwg
vinet.ttf
alcantarillas sin eje.dwg
ARIALN.TTF
sanssb__.ttf
romans.shx
romant__.ttf
simsunb.ttf
detalles topograficos (modificado).dwg
txt.shx
barreras.dwg
GEOMETRIA HORIZONTAL.dwg
BM.dwg
TERRENO FINAL PARA PLANTA.dwg
SE�ALIZACION HORIZONTAL COMPLETO.dwg
calibri.ttf
CUNETAS ASBUILT OF.dwg
MUROS.dwg

The following files could not be located:


abc2.JPG
BOLIVIA.JPG
logo nuevo abc.jpg
Sitework.Paving - Surfacing.Asphalt.jpg

Conversion:
All drawing files were converted to AutoCAD 2018/LT 2018 format.

Notes for distribution:

Material texture files:


Please copy these files to the AutoCAD Texture Maps Search Path directory.

The AutoCAD variable FONTALT was set to:


C:\Users\GIGABITE\appdata\roaming\autodesk\c3d 2018\enu\support\simplex.shx
Please make sure that the FONTALT variable is set to this file or an equivalent
before opening any drawings. All text styles with missing fonts are automatically
set to this font.

Data Shortcut Source File


E:\GABINETE\PLANOS AS BUILT\Source Drawings\Corridors\EC 1 TRAMO 1B DOBLE VIA
16+106.18-16+860.dwg
E:\GABINETE\PLANOS AS BUILT\Source Drawings\Corridors\EC 2 TRAMO 1B DOBLE VIA
16+860--26+540.dwg
E:\GABINETE\PLANOS AS BUILT\Source Drawings\Corridors\EC 3 TRAMO 1B DOBLE VIA
26+240--28+510.dwg
E:\GABINETE\PLANOS AS BUILT\Source Drawings\Corridors\EC 4 TRAMO 1B DOBLE VIA
28+510--34+860.dwg
E:\GABINETE\PLANOS AS BUILT\Source Drawings\Corridors\EC 5 TRAMO 1B DOBLE VIA
34+860--38+500.dwg
E:\GABINETE\PLANOS AS BUILT\Source Drawings\Corridors\EC 6 TRAMO 1B DOBLE VIA
38+500--39+553.04.dwg
E:\GABINETE\PLANOS AS BUILT\Source Drawings\Corridors\TRAMO 1A CARACOLLO.dwg
E:\GABINETE\PLANOS AS BUILT\Source Drawings\Corridors\TRAMO 1A UNION PAR VIAL.dwg
E:\GABINETE\PLANOS AS BUILT\Source Drawings\Corridors\TRAMO 1B VIA EXISTENTE.dwg
E:\GABINETE\PLANOS AS BUILT\Source Drawings\Corridors\TRAMO 1B VIA NUEVA.dwg

Surface File
G:\DV CARACOLLO CONFITAL\GABINETE\PLANOS AS BUILT\Source Drawings\Surfaces\TERRENO
FINAL--.xml

View Frame Layout


G:\DV CARACOLLO CONFITAL\GABINETE\PLANOS AS BUILT\Source Drawings\Alignments\
ALINEAMIENTO Y PERFIL 1AUPV.dwg

View Frame Template


G:\DV CARACOLLO CONFITAL\GABINETE\PLANOS AS BUILT\External References\DWT\
CARIMBO_1AUPV.dwt
C:\ProgramData\Autodesk\C3D 2018\enu\Data\Corridor Design Standards\Metric\
_Autodesk Civil 3D Metric (2011) Roadway Design Standards.xml

*** Map 2007 Data and Cache files ***

The drawing 'G:\DV CARACOLLO CONFITAL\GABINETE\PLANOS AS BUILT\Source Drawings\


PLANTA Y PERFIL\ALINEAMIENTO Y PERFIL 1AUPV - copia (1).dwg' refers to a cache
manifest XML file, zero or more cache files (.GWS) as well as raw data files.
Please ensure the manifest XML file and cache files are unzipped to the drawing
directory or your current MapCache directory.
You may also need to update the cache manifest XML file to point to the unzipped
location of the data files.

You might also like