EWRC,
Mahila
6 VisakhapatnamEGMM-DRDA ###
Pranganam,
Visakhapatnam.
Textiles,
9 Vizianagaram EGMM-DRDA ###
Vizianagaram
10 Warangal NAC ### NAC, Jangoan
Durgabhai Mahila
11 Nellore EGMM-DRDA ### Pranganam,
Nellore
19 Srikakulam NAC
Observations
1) In computer lab there is some pests on the wood furniture, Total 28 computers are
available.
2) Air Conditioners are damaged, Water leakage on roof side.
3) No alumni interaction with old students in class room, but the new students are
interacting with old students in training center campus.
4) No neatness maintaining in hostel. Dusty, three fans have damaged, and the fans are
running slowly.
5) Food is not tasty. Kitchen is very bad,very dusty not maintaining cleanly.
1) Students facing difficult with their daily travelling expenses nearly Rs. 30-40 per day
per student. Dropouts increasing for this cause only.
2) 10 Computers available, but two systems only working.
3) Drinking water facility not available, No toilets, students going outside for toilets.
4) Students requested that to arrange hostel facility.
5) EWRC training course 45 days completed, still no uniform, no shoes, no ID cards.
1) No chairs available for students.
2) Food is not good, restore items using, No safe drinking water available.
3) Training center entrance is very narrow.
1) The trainers mingled the next batch students with present batch students. 16
next batch students in the present batch class room.
2) Training centre capacity utilization is low. There are no need two trainers in the
centre.
1)Three trainerspart
3) Mobilization available in the training centre. No need of three trainers to train
is weak.
the trainees.
2) Capacity utilization is low. Mobilization part is weak.
3) Attendance registers are not maintaining properly.
4) 60 Juki Sewing machines are available, but only 21 trainees are training.
5) Still now support money not given to previous batch students. Still it is under
process.
1) Training Centre is in very old building, ready to break. Accommodation also in that
campus.
2) No lights, fans in the accommodations hall. No toilets, open bathing, aspirants are
going outside.
3) There is no hygiene in kitchen, mess. Holes on room in dining hall, in rainy season
there is water leakage problems.
4) Food provider is not providing quality food. They were saying that due to non
settlement of the mess bills by DRDA, they were doing like that.
5) The NAC trainers are not showing much interest to train the trainees.
6) Still now the trainers not prepared last batch placement readiness form.
7) No security in the training centre. The training centre is 2km away from the town.
8) Attendance registers also not updating properly.
1. EHW Course under mobilization. Present mobilized 35 members, but Trainers are not
available for EHW
2. Notice board not available
3. Class room are conducting in open place it is not comfortable in rainy season
4. Sports Material not available
5. No. of Toilets 10 ( no use) & No Bath rooms
6. Training center is market yard in this 1 Go down Using for Dining Hall & Store room.
Another 1 Go down Using for accommodation.
7. In Masonry Trade 1 Trainee have below 18 years
8. EHW course online starting date is 30/07/2010 to 28/10/2010 but training dates not
match with trainer given dates
Trainin
Serial Name of the Training
g Visit Date
Number District Centre
Partner
Sahithi Technosoft
2 Vizianagaram System ### Computers,
s Vizianagaram
Sahithi Sahithi
3 Visakhapatnam
System 31-12-201 Systems,
s Visakhapatnam
Comtec
4 Krishna Tally ### Computers,
Vijayawada
AVR Degree
College
6 Krishna Tally ###
Campus,
Avanigadda
Microsoft
7 Krishna Tally ### Computers,
Jaggaiahpeta
Global Soft
8 Krishna Tally ### Computers,
Ibrahimpatnam
Lakshya
9 Guntur CMC 2/8/2011 Infotech,
Guntur
Tally ACT-1,
10 Guntur Tally ###
Guntur
Tally ACT-2,
11 West GodavariTally ### e-computers,
Eluru
Global College
of Hotel
12 West GodavariGCHM ### Management,
Eluru
Tally, ACT,
13 West GodavariTally ### Tadepalligude
m
Tally, ACT,
14 West GodavariTally ###
Bhimavaram
Sahithi
Cat Computers,
15 Nellore System 3/8/2011
Nellore
s
Smart Bridge
16 Nellore CSEC 3/9/2011 Computer
Institute
Sri Lakshmi
17 Nellore CSEC ### Infotech,
Sullurupeta
Observations
1)Mobilization process started on 06-12-2010, still now enrolling the aspirants.
2)Batch commencement not started.
3)In their action plan batches start from 26-12-2010. But not divided the
batches course wise.
4)Computer systems not provided in lab.
5)No records available in the training centre.
6)Two trainers available out of five trainers in the training centre.
1) Online 40 aspirants’ names registered, in that only 10 aspirants are attending
the training. Another 15 aspirants are also in same training batch, but their
names are not registered in biometric and also not maintaining manual
attendance also.
2) At the time of my visit there is no biometric device, no manual attendance.
No proper maintenance of the attendance. They told that the biometric device is
in repair.
3) According to their action plan batch commencement date is from 3-12-10 to
10-01-11. But they started the mobilization process on 11-11-10 onwards. On
that day onwards they were conducting classes.
4) There are no toilets for boys in hostel, Open bath. They were going outside.
Hostel owner cattle is also accommodating in same boys bathing place.
5) Training centre Incharge Mr. Siva Prasad not concentrating well for provide
facilities in the training centre.
1) Aspirants’ attendance is poor. Some of the aspirants are available in the
hostel, but not attend the classes regularly.
2) Next batch commencement date not given, another side classes are running
for them.
1) Mobilization is not good.
2) Biometric device not installed. Manual attendance is not available.
3) Small class rooms.
4) Still aspirants data uploading.