You are on page 1of 12

Residenti

Serial Name of the Training Training Centre


Visit Date al
Number District Partner Centre Capacity
Yes/No

1 Kadapa EGMM-DRDA ### EWRC, Kadapa

2 Kadapa NAC ### NAC, Kadapa

3 VisakhapatnamEGMM-DRDA ### EWRC, Chodavaram

4 VisakhapatnamNAC ### NAC, Narsipatnam

5 VisakhapatnamEGMM-DRDA ### EWRC, Araku Valley

EWRC,
Mahila
6 VisakhapatnamEGMM-DRDA ###
Pranganam,
Visakhapatnam.

7 Vizianagaram NAC ### NAC, Vizianagaram

8 Vizianagaram EGMM-DRDA ### EWRC, Vizianagaram

Textiles,
9 Vizianagaram EGMM-DRDA ###
Vizianagaram
10 Warangal NAC ### NAC, Jangoan

Durgabhai Mahila
11 Nellore EGMM-DRDA ### Pranganam,
Nellore

12 Srikakulam NAC ### NAC-Plakonda

13 Srikakulam EWRC-DRDA ### EWRC-Etcherla

14 Srikakulam NAC ### NAC-Haddubangi


15 Srikakulam NAC ### NAC-Mandasa

16 Srikakulam NAC ### NAC-Ranasthalam

17 Srikakulam NAC ### NAC-BRCPUR

18 Srikakulam NAC ### NAC-Veeraghattam

19 Srikakulam NAC
Observations
1) In computer lab there is some pests on the wood furniture, Total 28 computers are
available.
2) Air Conditioners are damaged, Water leakage on roof side.
3) No alumni interaction with old students in class room, but the new students are
interacting with old students in training center campus.
4) No neatness maintaining in hostel. Dusty, three fans have damaged, and the fans are
running slowly.
5) Food is not tasty. Kitchen is very bad,very dusty not maintaining cleanly.

1) Training center maintaining in old buildings.


2) No proper maintenance.
3) No cleanliness in mess. Food is an average.
4) Students are not able to communicate to explain on their subject.
5) Hostel accommodation is not good.

1) Students facing difficult with their daily travelling expenses nearly Rs. 30-40 per day
per student. Dropouts increasing for this cause only.
2) 10 Computers available, but two systems only working.
3) Drinking water facility not available, No toilets, students going outside for toilets.
4) Students requested that to arrange hostel facility.
5) EWRC training course 45 days completed, still no uniform, no shoes, no ID cards.
1) No chairs available for students.
2) Food is not good, restore items using, No safe drinking water available.
3) Training center entrance is very narrow.

1) 59 students available, but only one trainer.


2) Computers not available, White board markers not provide by DRDA.
3) No separate security guard for girls.
1) 13 Computer systems available, but 3 computer systems are working.
2) Budget not released for students placement.
3) TV, CD player available, recently TV has broken.
4) Food items not tasty, improve the hygiene in mess.
1) Training centre is in old building, in rainy season water leakage problems in
class rooms.
2) No toilets in the centre for aspirants, they were going outside for toilets. Only
one toilet available the trainers are using that.
3) No hygiene condition in the class rooms.
4) 5 trainees are below 18 years age in present batch.

1) The trainers mingled the next batch students with present batch students. 16
next batch students in the present batch class room.
2) Training centre capacity utilization is low. There are no need two trainers in the
centre.
1)Three trainerspart
3) Mobilization available in the training centre. No need of three trainers to train
is weak.
the trainees.
2) Capacity utilization is low. Mobilization part is weak.
3) Attendance registers are not maintaining properly.
4) 60 Juki Sewing machines are available, but only 21 trainees are training.
5) Still now support money not given to previous batch students. Still it is under
process.
1) Training Centre is in very old building, ready to break. Accommodation also in that
campus.
2) No lights, fans in the accommodations hall. No toilets, open bathing, aspirants are
going outside.
3) There is no hygiene in kitchen, mess. Holes on room in dining hall, in rainy season
there is water leakage problems.
4) Food provider is not providing quality food. They were saying that due to non
settlement of the mess bills by DRDA, they were doing like that.
5) The NAC trainers are not showing much interest to train the trainees.
6) Still now the trainers not prepared last batch placement readiness form.
7) No security in the training centre. The training centre is 2km away from the town.
8) Attendance registers also not updating properly.

1) 3 trainees are under aged.


2) Low capacity utilization.
3) 20 Juki machines are available, all are working.
4) Women & Child Welfare trainees are also under training in same hall. 30 domestic
machines are available for them.

1) Accommodation not sufficient to stay trainees.


2) Masonry course online starting date is 14/07/2010 to 12/10/2010 but training dates
not match with trainer given dates.
3) Trainer don’t know online batch no.
4) Site visits for trainees not conducting
5) Class rooms are congested
6) No separate wash rooms
7) Toilet 1 ( No use), Both rooms 2 only

1. Computers, LCD Projector not available in training center.


2. Training Center In charge Sri. Satyanarayana Murtyhy . A.O Discouraging to Trainees
3. Sports Material & Medical Kit not available
4. Prescribed Food menu not following
5. Both rooms & Latrines are not hygienic condition
6. In Girls hostel Total no. of both rooms 5 (1 not working)
7. No Lights, Buckets & Mugs not sufficient both rooms
8. Girls & boys Hostels not hygiene
9. In boys hostel total no. of toilets 4(Not use)
10. English Newspaper not Available in the training center
11. Food No Quality
12. Note books and Pens Not Distributed to Trainees

1. Not Maintaining placement Register


2. Practical record not given to trainees
3. Accommodation not sufficient to stay trainees
4. Notice board not available
5. 5 Toilets available but not in good condition, No both rooms , No bucket & mugs
1. EHW Course under mobilization present mobilized 36 members
2. No chairs in class room
3. Notice board not available
4. Class rooms not Cleaned
5. Sports Material not available
6. No Toilets & Both rooms
7. In Training center total 3 rooms. One room using for accommodation, other two rooms
using for class rooms for EHW & P&S but accommodation available for EHW. Class rooms
also using to accommodation this rooms don’t have any doors. So trainees facing some
problems from pigs etc.
8. In class rooms fans not working correctly
9. Water not available in Dining Hall
10. Not following food menu

1. No chairs in class room


2. No Exhibits in the training center
3. Notice board not available
4. Class rooms not Cleaned & Congested
5. Sports Material not available
6. Toilets -3 ( One not working), Both rooms-3, No Taps, buckets and Mugs In toilets &
both rooms
7. In training center 2 class rooms & 2 rooms for accommodation ( 1 room 12 member
capacity, 1- room 20 member capacity)
8. Practical material not sufficient (Electrodes, Helmets, Hand screens, MS plates)
9. No Safe Drinking Water
10. Dormitory is not clean regularly
11. Food Provider (MMS) maintaining separate attendance to trainees, this attendance
register not updatedDaily.

1. Placement Details not available at training center


2. No chairs in class room
3. Notice board not available
4. Sports Material not available
5. 10 Both rooms,2 Toilet useful in training center, 4 toilets not using
6. In training center 2-Practical rooms, 3 class rooms, 1- office room, 1- security guard
room, 2- Guest rooms with useless toilet, both room

1. EHW Course under mobilization. Present mobilized 35 members, but Trainers are not
available for EHW
2. Notice board not available
3. Class room are conducting in open place it is not comfortable in rainy season
4. Sports Material not available
5. No. of Toilets 10 ( no use) & No Bath rooms
6. Training center is market yard in this 1 Go down Using for Dining Hall & Store room.
Another 1 Go down Using for accommodation.
7. In Masonry Trade 1 Trainee have below 18 years
8. EHW course online starting date is 30/07/2010 to 28/10/2010 but training dates not
match with trainer given dates
Trainin
Serial Name of the Training
g Visit Date
Number District Centre
Partner

1 Vizianagaram DRF ### DRF, Bobbili

Sahithi Technosoft
2 Vizianagaram System ### Computers,
s Vizianagaram

Sahithi Sahithi
3 Visakhapatnam
System 31-12-201 Systems,
s Visakhapatnam

Comtec
4 Krishna Tally ### Computers,
Vijayawada

5 Krishna Tally ### Machilipatnam


Computers,
Machiliptnam

AVR Degree
College
6 Krishna Tally ###
Campus,
Avanigadda

Microsoft
7 Krishna Tally ### Computers,
Jaggaiahpeta

Global Soft
8 Krishna Tally ### Computers,
Ibrahimpatnam
Lakshya
9 Guntur CMC 2/8/2011 Infotech,
Guntur

Tally ACT-1,
10 Guntur Tally ###
Guntur

Tally ACT-2,
11 West GodavariTally ### e-computers,
Eluru

Global College
of Hotel
12 West GodavariGCHM ### Management,
Eluru

Tally, ACT,
13 West GodavariTally ### Tadepalligude
m

Tally, ACT,
14 West GodavariTally ###
Bhimavaram

Sahithi
Cat Computers,
15 Nellore System 3/8/2011
Nellore
s

Smart Bridge
16 Nellore CSEC 3/9/2011 Computer
Institute
Sri Lakshmi
17 Nellore CSEC ### Infotech,
Sullurupeta
Observations
1)Mobilization process started on 06-12-2010, still now enrolling the aspirants.
2)Batch commencement not started.
3)In their action plan batches start from 26-12-2010. But not divided the
batches course wise.
4)Computer systems not provided in lab.
5)No records available in the training centre.
6)Two trainers available out of five trainers in the training centre.
1) Online 40 aspirants’ names registered, in that only 10 aspirants are attending
the training. Another 15 aspirants are also in same training batch, but their
names are not registered in biometric and also not maintaining manual
attendance also.
2) At the time of my visit there is no biometric device, no manual attendance.
No proper maintenance of the attendance. They told that the biometric device is
in repair.
3) According to their action plan batch commencement date is from 3-12-10 to
10-01-11. But they started the mobilization process on 11-11-10 onwards. On
that day onwards they were conducting classes.
4) There are no toilets for boys in hostel, Open bath. They were going outside.
Hostel owner cattle is also accommodating in same boys bathing place.
5) Training centre Incharge Mr. Siva Prasad not concentrating well for provide
facilities in the training centre.
1) Aspirants’ attendance is poor. Some of the aspirants are available in the
hostel, but not attend the classes regularly.
2) Next batch commencement date not given, another side classes are running
for them.
1) Mobilization is not good.
2) Biometric device not installed. Manual attendance is not available.
3) Small class rooms.
4) Still aspirants data uploading.

1) Small Class rooms. Only two trainers are available.


2) Biometric device not installed.
3) Two toilets for all aspirants.
4) Still aspirants data online uploading.

1) Two trainers are available.


2) Biometric device not installed.
3) Two toilets for all aspirants.
4) Still aspirants data online uploading.
5) On that day 24 trainees present out of 48 trainees.

1) Only one trainer available in the training centre.


2) Biometric device not installed.
3) Still trainees online data uploading.
4) Only one toilet for all trainees.
5) Office room, Computer lab in same room

1) Still trainees online data uploading.


2) Batch commencement date not finalised, classes are conducting.
3) Biometric device not installed.
4) Still they have no syllabus to teach the trainees.
1) Two class rooms available at training centre, but three batches are running in the
sessions of morning, afternoon, evening.
2) Biometric machine not working from 03-02-2011. But manual attendance not
maintaining.
3) They were not following class room time table. Conducting classes two hours for
every batch, one hour lab facility to each trainee. Remaining time trainers are staying
at hostel.
4) 5 girl trainees are day scholars.
5) Placed batch trainees names have seen repeatedly in CMC centre by another ID
numbers.
1)Only class room available in the training centre.
2) Training centre incharge told that three trainers recruited, but on that day
training centre incharge only available in the training centre.
3) Only one toilet for all the trainees.

1) Trainees are attending the class at their own time.


2) 8 Computers in the computer lab.
3) Training material not given.
4) Class room, computer lab are congested.
5) No toilets in the training centre.
1) Training centre is not good, very dusty. Accommodation is not in hygiene condition.
2) No trainer for communicative English.
3) Training centre is one place, for practicals trainees are going 2km at GCHM office.
4) No proper supervision of GCHM management on the training centre.
5) No efficient trainers.
6) 7 trainees went for their home for write their exams. But they told that they were
absent.
7) In the same training centre GCHM management conducting training program parallel
for SC youth sponsored by SC Corporation.
1) Trainees are attending the class at their own time.
2) No White/Black board in one class room.
3) No toilets in the training centre.
4) Training material not given.

1) Class room, computer lab are congested.


2) 7 Computers in one lab, there is another web designing institute, there are 6
computers available, trainees doing practicals in there also.
3) 3 trainees are above 35 age group.
4) They told that 3 faculty are recruited, but at that time only one faculty available.
5) Toilets are located very close to office cabin, class room cabin.
1) 41 trainees only attended on that day out of 119 trainees, but the biometric
attendance showing
58 trainees attended. There is no evidence about the remaining trainees.
2) Dropouts, absentees’ data not matching.
3) 28 trainees’ dayscholrars. 24 boy trainees are in hostel, 7 girl trainees are in hostel.
4) M.C.A completed trainees are 2. Regular studying trainees are 7.
5) Computer lab, Class rooms are very congested.
6) Hostel is not hygiene.
7) More than one youth registered with the different biometric ID.
1) Total two batches trainees are 118, on that day present 83 trainees. There no
evidence on remaining 35 trainees without leave letters.
2) 6 trainees are regular students
3) 25 trainees taking lunch in the hostel, 16 trainees are purely day scholars.
1)9 trainees are regular B.Com studying.
2) Only 7 boys are in hostel, 19 trainees are taking only lunch, 11 day scholars’.
3) No trainer for communication skills.
4) No proper maintenance of records for leave letters.

You might also like