Professional Documents
Culture Documents
C1 C2
0.7 X
4.75
1 0.3 2 0.3 3
2.75 0.6
0.6 C1 C2
rzi
4 5 6
rxi
PLAN
COLUMN C1 C2
MOMENT DUE TO SHEAR AT PILECAP BASE (MX') 31.19 27.58 kN.m
MOMENT DUE TO SHEAR AT PILECAP BASE (MZ') 5.83 -0.89 kN.m
NET MOMENT (MX") 27.77 23.58 kN.m
NET MOMENT (MZ") 7.75 -0.99 kN.m
MOMENT DUE TO UNEQUAL FORCES -133.95 kN.m
TOTAL VERTICAL UNFACTORED FORCE 1179.80 kN
TOTAL BENDING MOMENT (MX) 51.34 kN.m
TOTAL BENDING MOMENT (MZ) -127.19 kN.m
2 2
PILE NO. rxi (m) rxi rzi (m) rzi FINAL FORCES
IN PILE (kN)
1 2.000 4.00 1.000 1.00 221
2 0.000 0.00 1.000 1.00 205
3 2.000 4.00 1.000 1.00 189
4 2.000 4.00 1.000 1.00 204
5 0.000 0.00 1.000 1.00 188
6 2.000 4.00 1.000 1.00 172
Σrxi2 = 16.00 Σrzi2 = 6.00
C1 C2 X 2 1.55
4 5 6 0.475 204 kN
204 kN 188 kN 172 kN
0.15
SECTION ALONG Z
Z
1.6
1.3
0.825
0.7
2.00 2.00
Z-DIRECTION
MAXIMUM ULTIMATE BENDING MOMENT (MUX) = 232 kN.m
Ast REQUIRED = 1074 mm2/m
MIN. Ast REQUIRED = 740 mm2/m
DIA. OF MAIN BARS = 16 mm
DIA. OF DISTRIBUTION BARS = 12 mm
SPACING FOR MAIN BARS = 187 mm
PROVIDED SPACING FOR MAIN BARS = 175 mm
SPACING FOR DIST BARS = 153 mm
PROVIDED SPACING FOR DISTRIBUTION BARS = 150 mm
X-DIRECTION
747 kN 621 kN
UDL = 85 kN/m
2.000 2.000
ONE-WAY SHEAR
ALONG-Z
306 332
TWO-WAY SHEAR
ALONG-Z
ALONG-X