Professional Documents
Culture Documents
Estimasi Pekerjaan Pare Pare Oke1
Estimasi Pekerjaan Pare Pare Oke1
tiket
makan
Jacking -
Mess 7,000,000
Mobil 7,000,000
TRANSPORT MATERIAL 1
TIM 13
INSPEKSI PT 1.00
VACUM 1
HYDROTEST 1
COI PRV PSV 1
DIMET 1
JACKING -
MANPOWER 133,000,000
MATERIAL -
EQUIPMENT & CONS 171,133,650
PAINTING -
INSPEKSI -
MESS & KRP 28,000,000
TRANSPORTASI 69,000,000
ESTIMASI 401,133,650
BOQ PENAWARAN KE PDC 605,000,000 0.30
HITUNGAN KANTOR 2,100,000,000 120,340,095
521,473,745
ESTIMASI 1,698,866,350
690,000,000
SELISIH 203,866,350 288,866,350
1 30 15,000,000
2 30 27,000,000
2 30 21,000,000
2 30 15,000,000
4 30 24,000,000
1 30 9,000,000
1 30 9,000,000
13 1 6,500,000
13 1 6,500,000
160 1 -
133,000,000
1 1 -
- 1 -
- 1 -
- 1 -
- 1 -
1 -
- -
-
1 2 14,000,000
1 2 14,000,000
1 1 120,000,000
1 1 75,000,000
1 1 20,000,000
1 - -
1 - -
1 - 215,000,000
1 537,600,897
-
-
48,369,975 1 48,369,975
182,000,000 -
585,970,873
30,000,000 1 30,000,000
1,500,000 2 39,000,000
69,000,000
7,000,000 1 7,000,000
12,000,000 1 12,000,000
10,000,000 1 10,000,000
25,000,000 1 25,000,000
35,000,000 1 35,000,000
89,000,000
JACKING
TOTAL MANPOWER MANPOWER
MATERIAL
Forman 1 EQUIPMENT & CONS
Welder 2 PAINTING
Fitter 2 INSPEKSI
Ass Fitter 2 MESS & KRP
Helper 4 TRANSPORTASI
HSE 1
Supervisor 1
13
739,000,000.00
304,133,650
0.508
pemotongan 0.3
fit up / erection 0.25
0.720 welding 0.45
BOQ ESTIMASI
209,300,000 110,000,000
451,813,017 276,133,650
78,075,000
-
-
15,000,000
13,500,000
21,000,000
10,500,000
16,000,000
47,500,000
rolling plat
13,819,992.95 3500
18,426,657.27 3500
32,246,650.22 PLAT 67,550,000
16,123,325.11
13,510,000
108,080,000
19,903.53
7500
27,403.53
-
133,000,000
-
171,133,650
-
-
28,000,000
69,000,000
-
-
PEMBAGI
91,240,095 90 1,013,779
76,033,413 9.213 8,252,840
136,860,143 45 3,041,337
0.914332036896731
Rp 561,449,150 Rp 84,217,373
Rp 161,000,000
Rp 258,449,150
Rp 142,000,000
7
94,570,000
PEKERJAAN PERSIAPAN
1 Mobilisasi / demobilisasi Personil, Material, dan Peralatan Kerja
2 Direksi Keet minimal uk. 4 x 3 m
3 Pembuatan Tirai Air
6 Biaya air bersih, listrik penerangan selama pelaksanaan
7 Penyewaan Scaffolding
8 Biaya Rapid Test (Setiap 14 HK)
SUB TOTAL I
TOTAL
QUANTITY
FT. PARE-PARE
3,948.57
5,264.76
ement Plate t = 6 mm, gasket, bolt & nut + Blind Flange 1.00
1.00
1.00
mpel pada Steeling Wel) 1.00
1½" x 2" x 2 type flanges untuk tangki timbun (incl. Ball Val 1.00
Flange 2", Flange 1½", Tee & Elbow) 1.00
cl. Fitting
6.00
3.00
2.00
36.00
12.00
exible pipe ansi 150 dia.8" 1.00
gate valve ansi 150 dia.8" (Valve Operasi dan Redundant V 2.00
ncl. Fitting 1.00
6.00
3.00
36.00
6.00
exible pipe ansi 150 dia.6" 1.00
gate valve ansi 150 dia.8" (Valve Operasi dan Redundant V 2.00
Sch. 40 incl. Fitting 1.00
13.00
2.00
4.00
18.00
3.00
gate valve ansi 150 dia.4" 1.00
ch. 40 incl. Fitting 1.00
1.00
1.00
18.00
3.00
gate valve ansi 150 dia.6" 1.00
1.00
1.00
entre) diameter 60cm 1.00
2.00
2.00
1.00
ng Device 1.00
nclude handrail) pada foam chamber 1.00
r sprinkle dia. 3 Inch 6.00
uk pipa water sprinkle dia. 3 Inch 2.00
2.00
2.00
56.00
84.00
2.00
2.00
e ansi 150 dia.8" 1.00
SUB TOTAL III
SUB TOTAL IV
an oleh PJIT/PI :
1.00
1.00
1.00
Holliday Test, & Pull Off Test untuk Coating) 1.00
1.00
leh Perusahaan Inspeksi Migas 1.00
1.00
SUB TOTAL V
TOTAL
HARGA SATUAN SUB TOTAL
MATERIAL JASA MATERIAL
-
- 99,600,000 -
- 3,000,000 -
- 27,500,000 -
- 12,000,000 -
- 51,200,000 -
- 100,000 -
- -
- -
- -
- -
21,500 - -
21,500 - -
- -
- -
- 450,000 -
- 480,000 -
- 9,500 -
- 7,000 -
- 750,000 -
- 830,000 -
- 1,780,000 -
- 500,000 -
- -
- -
- 55,000,000 -
15,500 - -
- 7,000 -
15,500 - -
- 4,320,000 -
- -
- 3,400,000 -
- -
- -
- 4,831,000 -
8,630,000 - 3,600,000 -
- 3,100,000 -
- 2,744,000 -
36,000,000 - -
7,560,000 - -
- -
1,020,000 - -
1,980,000 - -
74,400 - -
15,400 - -
325,500 - -
5,040,000 - 2,450,000 -
27,500,000 - 2,450,000 -
- -
670,000 - -
1,094,000 - -
15,400 - -
304,000 - -
3,900,000 - 1,980,000 -
36,500,000 - 1,980,000 -
- -
384,000 - -
282,000 - -
420,000 - -
27,600 - -
243,000 - -
12,700,000 - 1,600,000 -
- -
412,000 - -
1,094,000 - -
15,400 - -
304,000 - -
31,500,000 - 2,270,000 -
- 2,450,000 -
- 1,980,000 -
- 1,750,000 -
- 2,160,000 -
- 270,000 -
- -
- 2,160,000 -
- 3,460,000 -
270,000 - 3,760,000 -
316,000 - -
1,440,000 - -
1,632,000 - -
27,600 - -
15,400 - -
- 1,466,000 -
- 1,604,000 -
16,750,000 - 1,280,000 -
- -
- -
- -
- 150,000 -
- 275,000 -
- -
- 245,000 -
- 235,000 -
- -
- -
- -
- -
- -
- 10,250,000 -
- 13,500,000 -
- 15,500,000 -
- 9,700,000 -
- 45,000,000 -
- 25,000,000 -
- 3,500,000
-
-
SUB TOTAL
TOTAL
JASA
99,600,000 Rp 99,600,000
3,000,000 Rp 3,000,000
27,500,000 Rp 27,500,000
12,000,000 Rp 12,000,000
51,200,000 Rp 51,200,000
16,000,000 Rp 16,000,000
- Rp 209,300,000
- Rp -
- Rp -
- Rp -
- Rp -
20,632,500 Rp 20,632,500
22,008,000 Rp 22,008,000
87,526,622 Rp 87,526,622
64,493,300 Rp 64,493,300
34,387,500 Rp 34,387,500
38,055,500 Rp 38,055,500
14,240,000 Rp 14,240,000
18,560,000 Rp 18,560,000
- Rp -
- Rp -
55,000,000 Rp 55,000,000
- Rp -
74,831,394 Rp 74,831,394
- Rp -
4,320,000 Rp 4,320,000
- Rp -
17,758,200 Rp 17,758,200
- Rp 451,813,017
4,831,000 Rp 4,831,000
3,600,000 Rp 3,600,000
3,100,000 Rp 3,100,000
2,744,000 Rp 2,744,000
- Rp -
- Rp -
- Rp -
- Rp -
- Rp -
- Rp -
- Rp -
2,450,000 Rp 2,450,000
4,900,000 Rp 4,900,000
- Rp -
- Rp -
- Rp -
- Rp -
- Rp -
1,980,000 Rp 1,980,000
3,960,000 Rp 3,960,000
- Rp -
- Rp -
- Rp -
- Rp -
- Rp -
- Rp -
1,600,000 Rp 1,600,000
- Rp -
- Rp -
- Rp -
- Rp -
- Rp -
2,270,000 Rp 2,270,000
2,450,000 Rp 2,450,000
1,980,000 Rp 1,980,000
1,750,000 Rp 1,750,000
4,320,000 Rp 4,320,000
540,000 Rp 540,000
- Rp -
2,160,000 Rp 2,160,000
3,460,000 Rp 3,460,000
22,560,000 Rp 22,560,000
- Rp -
- Rp -
- Rp -
- Rp -
- Rp -
2,932,000 Rp 2,932,000
3,208,000 Rp 3,208,000
1,280,000 Rp 1,280,000
Rp 78,075,000
37,838,850 Rp 37,838,850
69,371,225 Rp 69,371,225
- Rp -
20,702,500 Rp 20,702,500
144,767,510 Rp 144,767,510
-
-
- Rp -
-
10,250,000 Rp 10,250,000
13,500,000 Rp 13,500,000
15,500,000 Rp 15,500,000
9,700,000 Rp 9,700,000
45,000,000 Rp 45,000,000
25,000,000 Rp 25,000,000
3,500,000 Rp 3,500,000
Rp -
1,134,318,102 739,188,017
131,500,000
156,000,000
54,200,000
Rp 50,000,000
Rp 391,700,000
Rp 1,130,888,017
No Item qty Un
Harga Unit Harga Total
1 Pelat baru 6 mm ( Material Plate 3,948.57 kg 17,327 68,416,862 0.20
2 Pelat baru 8 mm ( Material Plate 5,264.76 kg 17,327 91,222,483 0.20
3 Material Roof Framing + Top Angle 10,690.20 kg 7,000 74,831,394 0.20
4 Material Pelat t = 4 mm splash plat 491.14 Kg 15,500 7,612,708 0.20
5 Bolt & Nut Bracket 1.00 Ls 8,750,000 8,750,000 0.20
Nozzle ATG dia. 6" c/w. Flange,
reinforcement Plate t = 6 mm, 1.00 S
6 gasket, bolt & nut + Blind Flange 4,026,000 4,026,000 0.20
7 PRV dia. 1½" x 2" x 2 type flanges 1.00 Se 36,300,000 36,300,000 0.20
8 Ball Valve 1½ 2.00 bh 2,220,000 4,440,000 0.20
9 Ball Valve 2" 1.00 bh 3,000,000 3,000,000 0.20
10 Pipa 1½" 6.00 m' 484,100 2,904,600 0.20
11 Pipa 2" 6 m' 646,800 3,880,800 0.20
12 Flange 2" 156,000 - 0.20
13 Flange 1½" 103,000 - 0.20
14 Tee & Elbow 500,000 - 0.20
15 Pipa dia. 8" API 5L Gr. B Sch. 40 6.00 m' 850,000 5,100,000 0.20
16 Flange dia. 8" #150 SO ANSI B16.5 3.00 bh 1,650,000 4,950,000 0.20
17 Elbow 45" dia 8" Sch. 40 A 234 W 2.00 bh 620,000 1,240,000 0.20
18 Stud Bolt (size : 3/4") 36.00 bh 12,000 432,000 0.20
19 Gasket Spiral Wound ANSI 150# 8" 12.00 bh 403,000 4,836,000 0.20
20 Flexible pipe ansi 150 dia.8" 1.00 bh 4,200,000 4,200,000 0.20
21 Gate valve ansi 150 dia.8" (Valve 2.00 bh 37,000,000 74,000,000 0.20
22 Pipa dia. 6" API 5L Gr. B Sch. 40 6.00 m' 557,175 3,343,050 0.20
23 Flange dia. 6" #150 SO ANSI B16.5 3.00 bh 912,000 2,736,000 0.20
24 Stud Bolt (size : 3/4") 36.00 bh 12,000 432,000 0.20
25 Gasket Spiral Wound ANSI 150# 6" 6.00 bh 271,000 1,626,000 0.20
26 Flexible pipe ansi 150 dia.6" 1.00 bh 3,250,000 3,250,000 0.20
27 Gate valve ansi 150 dia.8" (Valve 2.00 bh 28,000,000 56,000,000 0.20
28 Pipa dia. 4" API 5L Gr. B Sch. 40 13.00 m' 320,000 4,160,000 0.20
29 Elbow 90° dia. 4" Sch. 40 A 234 W 2.00 bh 235,000 470,000 0.20
30 Flange dia. 4" #150 SO ANSI B16.5 4.00 bh 350,000 1,400,000 0.20
31 Stud Bolt (size : 5/8") 18.00 bh 23,000 414,000 0.20
32 Gasket Spiral Wound ANSI 150# 4" 3.00 bh 200,000 600,000 0.20
33 Gate valve ansi 150 dia.4" 1.00 bh - 0.20
34 Elbow 90° dia. 6" Sch. 40 A 234 W 1.00 bh 342,000 342,000 0.20
35 Flange dia. 6" #150 SO ANSI B16.5 1.00 bh 600,000 600,000 0.20
36 Stud Bolt (size : 3/4") 18.00 bh 12,000 216,000 0.20
37 Gasket Spiral Wound ANSI 150# 6" 3.00 bh 271,000 813,000 0.20
38 Gate valve ansi 150 dia.6" 1.00 bh 21,000,000 21,000,000 0.20
39 Inlet dia 8" ANSI 150# 1.00 ls 4,026,000 4,026,000 0.20
40 Elbow 6" ANSI 150# 1.00 ls 342,000 342,000 0.20
41 pipa water sprinkle dia. 3 Inch 6.00 m' 224,000 1,344,000 0.20
42 flange untuk pipa water sprinkle dia 2.00 bh 264,000 528,000 0.20
43 Packing roof manhole Dia. 20 Inch 2.00 bh 1,200,000 2,400,000 0.20
Packing shell manhole Dia. 24
2.00 bh
44 Inch 1,360,000 2,720,000 0.20
45 Mur/Baut 5/8 Inch 56.00 bh 23,000 1,288,000 0.20
46 Mur/Baut 3/4 Inch 84.00 bh 12,000 1,008,000 0.20
47 Check valve ansi 150 dia.8" 1.00 bh 26,400,000 26,400,000 0.20
0.20
537,600,897
537,600,897
MATERIAL KASESORIS
Harga Unit Harga Unit
3,465 20,792 82,100,235
3,465 20,792 109,466,980
1,400 8,400 89,797,673
3,100 18,600 9,135,250
1,750,000 10,500,000 10,500,000
229,421,075 645,121,077
303,130,158
3
Plate : 50000 Gasket : 1500000 Bolt & Nut 22000 Jasa 1 Juta
PMT & DAILY 90 5,500,000 1 495,000,000
APD 25 5,500,000 1 137,500,000
MCU 25 1,500,000 1 37,500,000
WELDING HABITAT 30 7,000,000 1 210,000,000
SCAFFOLDING 90 1,400,000 1 126,000,000
GAS DETECTOR 90 200,000 1 18,000,000
MATERIAL PLAT 9213 21,000 1 193,473,000
MATERIAL RAFTER 10690 21,000 1 224,490,000
BLSTING 252 126,000 1 31,752,000
PAINTING 616 31,500 1 19,404,000
CAT 200 935,000 1 187,000,000
TOOLS 300 750,000 1 225,000,000
WELDER 5 45 250,000 56,250,000
FITTER 6 60 175,000 63,000,000
HELPER 6 90 150,000 81,000,000
RIGGER 3 90 175,000 47,250,000
PIPING MATERIAL 1 200,000,000 1 200,000,000
TEST SERTIFIKASI 1 250,000,000 1 250,000,000
2,100,000,000
2,602,619,000
Tools & Consumable Cost
UNIT : Rp
PRICE
NO. DESCRIPTION UNIT Q'TY REMARK
U/PRICE AMOUNT
OTHER TOOLS
1 CUTTING TORCH c/w REGULATOR SET 2 1,250,000 2,500,000
2 MILLER MESIN LAS SET 2 5,000,000 10,000,000
2 SEMI AUTO CUTTING PLATE SET 2 10,000,000 20,000,000
3 GRINDING MACHINE 7 INCH SET 3 1,500,000 4,500,000
4 GRINDING MACHINE 5 INCH SET 3 1,200,000 3,600,000
5 WELDING CABLE MTR 50 85,000 4,250,000
6 POWER CABLE 4 X 35 mm2 MTR 50 250,000 12,500,000
7 POWER CABLE 4 X 10 mm2 MTR 50 45,000 2,250,000
8 POWER CABLE 4 X 6 mm2 MTR 50 38,000 1,900,000
9 POWER CABLE 3 X 2.5 mm2 MTR 50 14,500 725,000
10 ELECTRICAL PANEL & ACCESSORIES SET 1 2,500,000 2,500,000
11 SCAFFOLDING PIPE SET 130 320,000 41,600,000
12 SCAFFOLDING CLAMP SET 130 16,500 2,145,000
13 METAL DECK 3 METER SET 10 250,000 2,500,000
14 SLING BELT SET 4 900,000 3,600,000
15 BURNER SET 1 1,500,000 1,500,000
16 CHAIN BLOCK SET 4 2,500,000 10,000,000
17 WIRE SLING MTR 50 45,000 2,250,000
18 SHACKLE SET 2 75,000 150,000
19 WELDING CAP SET 4 120,000 480,000
20 TEMPORARY MATERIAL FOR JIG TON - 9,500,000 -
21 GANJAL KAYU (WOOD) M3 1 2,500,000 2,500,000
22 BODDY HARDNESS SET 6 255,000 1,530,000
23 OTHER TOOLS L/S 1 15,284,900 15,284,900 10%
24 TRANSPORT TO SITE TRIP - 1,500,000 -
TOTAL 168,133,650
PAINTING
1 THINNER FOR CLEANING LTR 9,000 -
2 PLASTIC TEND SHEET 20 150,000 3,000,000
3 MAJUN KG 15,000 -
4 TEST EQUIPMENT
4.1 Dry Thickness Film SET - 12,000,000 -
4.2 Wet Thickness Film SET - 2,500,000 -
4.3 Comparator SET - 4,500,000 -
4.4 TemperaturE Control SET - 1,500,000 -
4.5 Humidity Control SET - 2,000,000 -
4.6 Test Pax SET - 1,500,000 -
TOTAL 3,000,000
Page 28 of 31
thickness 12
root face 2
diameter 14500
keliling 45530 6000 7.588333
tangen 30 1.73 0.333333 0.576667 5264
6.92
volume 1 1092720 7.811016
volume 2 787669
vol tot 1880389 18803.89
P 146670.3 146.670342
KELILING TANGKI
UNIT PRICE 50000 7,333,517 TINGGI
PIPE TUBE 1
PIPE TUBE 2
PIPE TUBE 3
ASHIBA
BASE
LOCK
PIPE TUBE 1
PIPE TUBE 2
PIPE TUBE 3
ASHIBA
86400000
673920000
673.92
KEBUTUHAN SCAFFOLDING
JUMLAH JUMLAH
KELILING TANGKI 45.5 METER
9 METER
PIPE TUBE 1 6 METER 7.583333 16 BUTUH 16 PIPA 6 METER
PIPE TUBE 2 3 METER 15.16667 80 1 KELILING LINGKARAN BUTUH 40 PIPA
PIPE TUBE 3 1 METER 72 1 KELILING LINGKARAN BUTUH 24 PIPA 1 ME
PER 3 PCS 24 1 KELILING LINGKARAN BUTUH 24 ASHIBA
16 16
35,376,000
PA 6 METER
NGKARAN BUTUH 40 PIPA
NGKARAN BUTUH 24 PIPA 1 METER
NGKARAN BUTUH 24 ASHIBA
24
3
96
300
72
468 50000 23,400,000
70 6 420
400000
28000000