Ibris Mineral Ltd acting for PT KawasanIndustriDelma

TECHNICAL SPECIFICATION OFBATHYMETRIC SURVEY FOR


FEASIBILITY STUDY

1. Purpose of Bathymetric Survey


The purposes of bathymetric survey are to determine the optimal layout of the power and
nickel plant and design level of power block, the location and level of marine structures such
as jetty or wharf, cooling system and other related facilities.

2. Scope of Bathymetric Survey


 Bathymetric Survey on an area of about 8000x7000 m2, interval line spacing 50 m,
map scale of 1:1000 with contour interval of 0.5 m
 Processing of Data and Drawings
 Report & Plotting Map / Drawing consist of paper print & original electronic file (not
PDF file) in CD
 Tidal Level Observation (30 days)
 Review and report of 50 year occurrence of high wave from relevant port authority
 Report on sedimentation effect
 Average wave height and period
 Reporting

3. Bathymetric Survey Technical Requirement


The technical requirement of bathymetric survey consists of but not limited to the following:

3.1. Survey Location

The bathymetric survey is to be conducted on the coast linebetween the river mouth at Tanah
Kuningand the river mouth at Mangkupadi, for a total area ofapproximately 13000 (shoreline)
x 6000 m2 (protrusion into the sea in an easterly direction) covering the locations of the
proposed jetty and trestle, cooling water intake and discharge and other marine structures. The
survey area is shown on the attached map.

3.2. Bathymetric Survey Procedure


The Bathymetry should be carried out along the coast line extending over the
topographicsurvey up to minimum of 20 m MSL depth to produce a bathymetric map at a
scale of 1: 1000 with0.50 m contour intervals inAutoCAD format (digital map). This map
should overlap with the topographic map being prepared over the topographic survey area.

An echo sounder, Raytheon or equivalent.should be used for bathymetric survey in deeper


area (waterdepth > 1.5 m), while the topometric survey method should be used in the shallow
surf zonethat cannot be reached in the survey vessel.

The bathymetric survey should be carried out in a grid pattern with a longitudinal survey line,
perpendicularto the coast up to a depth of 20 m MSL. Positioning should be determined using
a Differential Global PositioningSystem (DGPS) to record sounding positions. The sounding
positions along thesurvey line should be recorded at 50 m spacing.

Tidal observations should be carried out during the period of the bathymetric survey for
tidalreductions to the echo sounder recorded levels, and MSL (mean sea level) should be used
as the datumelevation for this survey.
The Topometric survey method should be used in the coastal zone which is too shallow to be
reached by survey vessels.
Tidal Measurement

Tidal measurements should be made, based on local tidal fluctuation charts and adopt the
position of0.00 m LWS as the reference level.

The Tidal measurement should be carried out to collect tidal level data that will be used to
analysethe main harmonic constituents and to obtain the datum elevationsfor the project site
i.e.: HHWL,HWL, MSL, LWL, LLWL etc. An automatic tide recorder should be used to
record tidal data for 30days continuously through the bathymetric survey period. In addition
50 year data should be provided from local authorities to evaluate maximum expected wave
heights. Wave data should be provided in height and period.

3.3. Expected Output


The final products to be submitted to the owner at the completion of the work are:
 Technical report
 Hard copy in paper output of 1: 1000 scale of bathymetric map 0.50 m contour interval
 Soft copy of technical report and map in ASCII file of XYZ data and digital map in CD
ROM.

3.4 Work Items for Bathymetric Survey and Basis of Quotation

Description Price Basis


1 Mobilization/De-mobilization lump-sump
2 Base Camp lump-sump
3 Bathymetric Survey Length-km
4 Processing of Data and Drawings lump-sump
5 Report & Map Plot/ Drawing lump-sump
6 Tidal Level Observation (30 days) lump-sump