2202
Plant Please define the the analysis.
17 m²
contents of these areas.
8
Plant
14 m²
TX 119009
7102
D0_004
W0_002 6
Classroom
61 m² LOUVRED DOOR Project: Murray Park School, Derby
11010
Title: Fire Safety Mark-ups (DRAFT)
CANOPY - TIMBER SUPORTS WITH POLYCARBONATE COVERING Revision: V1.0 (DRAFT) Scale: As shown
9
Server 1100 x 200 LOUVRE Prepared by: Alex Dragan Date: 01/09/17
Proposed new wall and fire door to achieve W0_001 6 m²
2888 Checked by: Tom Miles Date: 04/09/17
lobby protection on this side of the stair.
7300
Trenton Fire - Mark-up Legend
1100 x 200 LOUVRES
D0_002 D0_034
60 minutes fire resistance
W0_003 W0_004 D0_005 CW_ 002 W0_006 W0_007 D0_006 D0_007 W0_008 W0_009
30 minutes fire resistance
33 D0_033
FD30 Fire door
7215
and method of exposure should be in accordance
11 14 with BB100.
M WC F WC The final exit should
7 6 5 4 3 2 1 20 m² 20 m² Unless otherwise shown, fire doors should be in
UP be at least as wide as accordance with BB100.
1.8 m
D0_032 851 sq m the stair it serves.
17
1.8 m
3000
D0_028
Stair Lobby CW_ 004
2382
CW_ 001 1 10 4 D0_022
22 m²
Lobby Circulation
23 m²
D0_014 D0_015 D0_016 D0_017 D0_018 118 m² D0_019 D0_020 D0_021 D0_023
UP
1
8203
2
3
D0_013 26 22 4
5
D0_012 Store Store 6
1 ISSUED FOR PLANNING 09/08/17 ELB DCC
4
3 m²
4 20 4 m²
33 33 33 18
7
8 Rev Description Date Drn. Chk.
Store 9
6 m² CLIENT
5 D0_024
W0_023
4 25 24 Derby City Council
Reception / Office Interview room Head teacher's Office
26 m² 18 m² 24 m²
1.8 m
W0_022 23
2939
SEN 21 20 19 Store rooms should not CONTRACTOR
25 m² Classroom Classroom Classroom
56 m² 56 m² 56 m² open directly into the stair.
Wates Construction
W0_021 W0_020 W0_019 W0_018 W0_017 W0_016 W0_015 W0_014 D0_010 D0_009 W0_013 W0_012 W0_011 W0_010 D0_008
PROJECT
Consider adjusting the Please define the maximum occupancy,
door location. use and contents of this area.
A cross corridor door is required at
Murray Park Community
this location, as per floor above. School
3065 40800 4275
ST TITLE
Highest occupied floor is below 7.5m and, consequently, fire-fighting shafts are not required. Similarly, sprinkler protection is not proposed in this building. Proposed Ground Floor GA
BB 100 states that the maximum compartment size on a single single storey for an unsprinklered building should be no more than 800m2. The internal footprint of the building currently
stands at approximately 850m2. Therefore, it is proposed that the enclosures of the stairs should be increased from 30 mins to 60 mins compartment walls in order to meet this DRAWN BY. ELB DATE. 26/07/2017
10/08/2017 10:57:05
STATUS
If any classroom will be classified as an area of special fire hazard (e.g. laboratory, technology room, etc. as per Section 3.1 of BB100) or additional fire safety provisions will have to be PLANNING
employed.GROUND FLOOR PROJ - ORIGIN - ZONE - LEVEL - TYPE - ROLE - NUMBER REV
1 1 : 100
Vertical escape capacity is sufficient for up to 300 occupants on the first floor as dictated by the 1,500 mm wide stairs (and discounting the one which is not lobby protected). THis results in MUR LFA ZZ 01 DR A 0200 S2-P01
the LRC maximum occupancy as 26 occupants, depending on the occupancy of the staff office on this level.
Providing lobby protection to both stairs on the ground floor level will increase the occupant capacity on the first floor to 360 (as dictated by the widths of the storey exits).
0 10 MILLIMETRES 100 Category L1(M) detection is proposed, which is above the minimum requirement.
Highest occupied floor is below 7.5m and, consequently, fire-fighting shafts are not required. Similarly, sprinkler Lungfish Architects
7th Floor City Gate East
©
e-mail: hello@lungfish-architects.co.uk
www.lungfish-architects.co.uk 2017
BB 100 states that the maximum compartment size on a single single storey for an unsprinklered building should be
no more than 800m2. The internal footprint of the building currently stands at approximately 850m2. Therefore, it is NOTES
proposed that the enclosures of the stairs should be increased from 30 mins to 60 mins compartment walls in order
1. DO NOT SCALE FROM THIS
DRAWING
2. ALL MEASUREMENTS ARE IN
MILLIMETRES UNLESS STATED
If any classroom will be classified as an area of special fire hazard (e.g. laboratory, technology room, etc. as per
LANDSCAPE AND STRUCTURAL
number of occupants, the DRAWINGS
SIPHONIC DOWNPIPE contents, use and layout of
Section 3.1 of BB100) or additional fire safety provisions will have to be employed.
this area.
W1_004 W1_005 W1_006
32175
Vertical escape capacity is sufficient for up to 300 occupants on the first floor as dictated by the 1,500 mm wide stairs TX 119009
(and discounting the one which is not lobby protected). THis results in the LRC maximum occupancy as 26 occupants, Project: Murray Park School, Derby
31 Providing lobby protection to both stairs on the ground floor level will increase the occupant capacity on the first
18.0 m
7215
9
D1_002
1.8 m
Does this area include
any cooking appliances? 33 33 33
1.8 m
48 33 35 36 38 39
Riser Classroom Cl St Acc WC Classroom Classroom
3 m² 55 m² 1 m² 4 m² CW_ 003
55 m² 55 m²
D1_003 3013 D1_116 D1_114
1.8 m
32 Circulation Stairs
3000
CW_ 004
Circulation 45 m² 33 m²
CW_ 001 70 m²
D1_108 D1_111
1 ISSUED FOR PLANNING 09/08/17 ELB DCC
D1_105 D1_106 D1_107 D1_109 D1_110 Rev Description Date Drn. Chk.
1.5 m 24
Reverse door. DN CLIENT
8203
23
22 3
21 4
20 5
19 6
33 33 33 33 33 18
17
16
7
8
9
Derby City Council
15 10
11
14 13 12
CONTRACTOR
CW_ 007
Wates Construction
1.8 m
46 45 44 43 42
2939
Classroom Classroom Classroom Classroom Classroom
56 m² 56 m² 56 m² 56 m² 56 m²
PROJECT
W1_033 W1_032 W1_031 W1_030 W1_029 W1_028 W1_027 W1_026 W1_025 W1_024 W1_023 W1_022 W1_021 W1_020 W1_019
Murray Park Community
School
TITLE
10/08/2017 10:58:57
STATUS
PLANNING
PROJ - ORIGIN - ZONE - LEVEL - TYPE - ROLE - NUMBER REV
FIRST FLOOR
1 1 : 100
MUR LFA ZZ 02 DR A 0201 S2-P01
0 10 MILLIMETRES 100
Lungfish Architects
7th Floor City Gate East
Tollhouse Hill
Nottingham
NG1 5FS
Tel: 0115 7841223
Fax: 0115 9583232
©
e-mail: hello@lungfish-architects.co.uk
www.lungfish-architects.co.uk 2017
NOTES
TX 119009
RL_001
Project: Murray Park School, Derby
1°
Title: Fire Safety Mark-ups (DRAFT)
M&E TO CONFIRM AREA OF PV PANELS IF REQUIRED. Revision: V1.0 (DRAFT) Scale: As shown
ACCESS HATCH FROM LRC FOR MAINTENANCE
Access via hatch is
2M DEMARKED SAFETY ZONE required at the head of Prepared by: Alex Dragan Date: 01/09/17
the stairs. Checked by: Tom Miles Date: 04/09/17
15.5 m
Notes:
This area should This drawing should be read in conjunction with
the building supporting detailed information.
include unobstructed
Unless otherwise shown, fire resistance provisions
access in between the RL_004
and method of exposure should be in accordance
two sides of the roof. with BB100.
Unless otherwise shown, fire doors should be in
accordance with BB100.
1°
1°
MIN. 2000MM
2NO. 400 X
400MM ROOF
COWL
1°
CLIENT
CONTRACTOR
TAPERED INSULATION TO
ALLOW WATER TO
COLLECT IN MAIN GULLY
Wates Construction
10/08/2017 11:00:27
STATUS
1 : 100
PLANNING
PROJ - ORIGIN - ZONE - LEVEL - TYPE - ROLE - NUMBER REV