You are on page 1of 1

CALIBRATION PROCEDURE SYSTEM

THE CALIBRATION ABLE BE EFFECTED WITH TWO PROCEDURES!! USED ONLY THAT DESCRIBED UNDER FOR AVOIDING DIFFICULTY

START NITROGEN PLANT AND WAIT ABOUT 30 MINUTE ON SYSTEM TO STABLE

IN NORMAL OPERATION SAMPLE SELECTOR HAV POSITION SAMPLE AIR IN

TURN SELECTOR INTO POSITION CALIBRATE AIR FOR TEST HIGH ALARM OXYGEN

IN THE CONTROL PANEL OXY ANALYZER IN THE LINE 2 READ THE LEVEL OXYGEN INGREASE UP TO 20.8 %

WHEN THE VALUE GO UP THE 20.8% WAIT SOUND ALARM AND RED LIGHT HIGH OXYGEN IS ON

FOR CALIBRATE ON 1.5% OXYGEN TURN SELECTOR ON CALIBRATION GAS NO2

OPEN SPAN GAS CALIBRATION BOTTLE NO TOUCH REGULATOR IT ALREADY SET FOR THIS OPERATION

IN THE CONTROL PANEL OXY ANALYZER IN THE LINE 2 READ THE OXY % GO IN THE VALUE SET FROM SPAN GAS BOTTLE ABOUT 1,5%

WHEN THE OXY % IS ADJUSTED ON 1.5% TURN SELECTOR IN NORMAL OPERATION SAMPLE GAS IN AND CLOSE SPAN GAS BOTTLE

THE CALIBRATION PROCEDURE IS FINISHED