You are on page 1of 3

1.2 C = 400 + 0.

5yd (y-T)

= 400 + 0.5 (3.050)

= 400 + 1525

C = 1925

I = 700 - 4000i + 0,2y

= 700 – 400 + 650

= 950

Ex – Im

= 100 + 0.1y* + 100(tcn) – 0.1y – 50(tcn)

= 100 + 100 + 200 – 325 – 100

= - 25

Déficit

C = 400 + 0.5yd (y-T)

= 400 + 0.5 (3300)

= 400 + 1650

= 2050
I = 700 – 4000i + 0.2 (3500)

= 700 – 400 + 700

= 1000

Ex – Im

= 100 + 0.1y* + 100(tcn) – 0.1y – 50(tcn)

= 100 + 200 + 200 – 350 – 100

= 50

Superávit

400 + 0.5y – 0.5 + 700 – 4000i + 0.2y + 400 + 100 + 0.1y* + 100tcn – 0.1y – 50tcn

= 400 + 0.5y – 100 + 700 – 400 + 0.2y + 400 + 100 + 200 + 200 – 0.1y – 100

Y – 0.5y – 0.2y + 0.1y = 400 – 100 + 700 – 400 + 400 + 100 + 200 + 200 – 100

Y – 0.6y = 1400

Y (1 – 06) = 1400

Y= 1 x 1400

(1 – 06)

Y= 1 x 1400

( 0.4 ) i

Y = 2.5 x 1400

Y = 3500

You might also like