You are on page 1of 43
MERALCO’s Standard: 1 Requirements for Service requiring Transformer Vault FILINVEST LAND, INC. fae 5 July 2016 f ities Engr. ROBERT GARCIA ies a a i ial PEEAS Requirements for aT ee eey eMC me ele (Secondary-Metered Customers) Sin g le Line INCOMING OVERHEAD LINE ezasco caro Diagram . POWER UP + TERMINAL FORUM SERIES SURGE __. i) POLE ARRESTER. FUSE CUTOUT OR POWER FUSE CABLE TERMINATION 4 ‘ALL CIVIL WORKS, i.e., CONCRETE-ENCASED PVC DUCTS & FITTINGS, TO BE UNDERGROUND PROVIDED AND INSTALLED BY PRIMARY, ————> ‘THE APPLICANT/CUSTOMER CABLES \ | ELBOW T T l+—— ARRESTER PADMOUNTED Tt TRANSFORMER VAULT TRANSFORMER ————* 2. TO BE CONSTRUCTED BY — THE APPLICANT/CUSTOMER BASED ON MERALCO STANDARD. SECONDARY o arse] CABLES METER TO CUSTOMER'S MAIN SECONDARY CIRCUIT BREAKER OVERHEAD LINE FEEDING A TRANSFORMER VAULT Si ng le Line UNDERGROUND FEEDER an Diagram 1 5 POWER UP + PADMOUNTED FORUM SERIES ‘SWITCHGEAR ALL CIVIL WORKS, i.e., CONCRETE-ENCASED PVC -—— _TO BE CONSTRUCTED BY ‘THE APPLICANT/CUSTOMER BASED ON MERALCO STANDARD ARM! UNDERGROUND DUCTS & FITTINGS, TO BE PRIMARY, ————+ PROVIDED AND INSTALLED BY CABLES ‘THE APPLICANT/CUSTOMER , fh ELBOW a ARRESTER PADMOUNTED Jor TRANSFORMER ' ‘TRANSFORMER VAULT | cre ‘SECONDARY CABLES METER TO CUSTOMER'S MAIN SECONDARY CIRCUIT BREAKER UNDERGROUND LINE FEEDING A TRANSFORMER VAULT Transformers for Vault sacceccan Installation POWER UP FORUM SERIES Meralco-Supplied Padmounted Transformers = Three-phase, 34.5 GrdY/20 kV or 13.2 GrdY/7.62 kV = Available in either 240Y/139-V secondary (75-1000 kVA) or 480Y/277-V secondary (500-2000 kVA) => 416Y/240 V secondary (500-1000 kVA) Transformers for Vault aie Installation POWER UP FORUM SERIES Meralco-Supplied Padmounted Transformers = Deadfront primary = Less flammable liquid filled => Completely self- protected with fuses = Provided with loop sectionalizing switch 34.5 kV wmeace, y OH Line Macca POWER UP FORUM SERIES iy Lightning Fuse Cut-Out Arrester or Power Fuse ‘s ¥ po ‘iciay Loadbreak Junction, 200A Transformer fp Vault ™ PRIMARY he Vault y T 1 Elbow Type ’ Arrester DT's ae he (SEE SeconDaRY’ NOTE) Load Load Single Line Diagram - 2 Banks wi 4-Way Junction ZispAice comoan Transformers for Vault POWER UP Installation Meralco-Supplied Deadfront Distribution Transformer = Single-phase, 34.5 GrdY/20 kV or 13.2 GrdY/7.62 kV = Available in either 139/277-V secondary or 240/120-V secondary => Available in 167 - 333 kVA Transformers for Vault POWER UP Installation Meralco-Supplied Deadfront Distribution Transformer = Deadfront primary = Round tank construction = Less flammable liquid filled = Provided with standard DT accessories issico conpoop oR UP RUM SERIES (ee) RP (see DETAIL) 1 TO MERALCO 4 PRIMARY “=~ SECONDARY TRENCH 1SONM THICK REINFORCED CABLE FEED PRIMARY TRENCH CONCRETE 150MM THICK REINFORCED __/ ‘CONCRETE | _ | || Nr) (SEE DETAIL 1) MERALCO POWER UP FORUM SERIES 4-WAY / 4-POINT JUNCTION {pEaALco conmooaTe POWER UP FORUM SERIES PREFERRED VAULT LOCATION: + PREFERRED VAULT LOCATION SHALL BE ON THE GROUND FLOOR + SECOND FLOOR MAY BE ALLOWED (FOR VAULT TYPE DT’s AND PADMOUNTED XF WITH HOISTING FACILITIES) + FIRST BASEMENT MAY BE ALLOWED FOR BUILDINGS WITH MULTIPLE BASEMENT {pEaALco conmooaTe POWER UP FORUM SERIES + THE VAULT SHALL BE LOCATED ON PERIMETER OF THE BUILDING + ADJACENT TO STREET/ROADWAY ACCESSIBLE TO MERALCO TRUCKS AND CRANE TRUCK MINIMUM ROAD WIDTH : 6.5 METERS Se lee gem ET La Specifications/Requirements {pEaALco conmooaTe POWER UP STANDARD SPECIFICATION/ REQUIREMENTS: |‘ * WALLS AND ROOF SHALL BE MADE OF REINFORCED CONCRETE NOT LESS THAN 150MM THERE SHALL BE NO OPENING FROM THE VAULT TO ANY PART OF THE BUILDING INTERIOR 150 MM DOORSILL IS REQUIRED FOR LIQUID CONFINEMENT PROVISION FOR ADEQUATE AND PERMANENT VENTILATION (EXHAUST FAN-TEMP CONTROLLED RATED % HP, 71 CuM/Min (2500 CFM)) CLEAR HEADROOM SHALL NOT BE LESS THAN 4M FROM THE BOTTOM OF THE I-BEAM TO MAINTAIN A 30 SLING ANGLE FROM THE VERTICAL (HOISTING FACILITY) {pEaALco conmooaTe POWER UP FORUM SERIES STANDARD SPECIFICATION/ REQUIREMENTS: + DUCTS (PRIMARY AND SECONDARY) - 110 MM DIAMETER, THICK WALLED, RED ORANGE COLOR, UNPLASTICIZED POLYVINYL CHLORIDE (UPVC) IN ACCORDANCE WITH PNS 14. IT SHOULD BE ENCASED IN CONCRETE + PROVISION OF PERSONNEL ACCESS DOORWAY DIRECTLY ACCESSIBLE FROM OUTSIDE OF THE BUILDING Customer Vault Layouts ire Padmounted Transformers Requirements for Customer Vault ZispAice comoan POWER UP SERIES FORUM MINIMUM DIMENSION PADMOUNTED TRANSFORMER IN VAULT LOCATION 1-BANK 2-BANKS (W) 5m X (D) 4m} (W) 8m X (D) 4m Ground Floor X(H) 3m Bi X(H) 3m 30 Floor (W) 5m X (D) 6m] (W) 8m X (D) 6m X (H) 4m* X (H) 4m* (W) 5m X (D) 6m} (W) 8m X (D) 6m 1" Basement X(H) 3m_ MB] Xx (H) 3m NOTES: [1] W= Width; D = Depth; H = Height (Headroom) *[2] 4m vertical distance measured from the bottom of the beam to the floor is required when hoisting the transformer EXCEPTION: For 2nd floor transformer vault with a hatchway, the depth requirement is 8m. Requirements for Customer Vault ZispAice comoan POWER UP SERIES FORUM MINIMUM DIMENSION DEADFRONT DISTRIBUTION TRANSFORMERS LOCATION 1-BANK 2-BANKS crind Poor | Se a eS 2nd Floor Mo ©) a (w) om x ©) 6m rssosenen [25 2) Sg NOTE: W = Width; D = Depth; H = Height (Headroom) G/F Transformer Vault- 4000 _ (Single Bank) t . > + GROUND GRID METER A 1 wan TRANSFORMER SECONDARY w ACCESS DOOR cIRCUIT i |f o BREAKER z s g | i z & 2 2 & £ PRIMARY s ~—caBLE Ducts 8 EXHAUST FAN AND DUCT PLAN 3000 G/F Transformer Vault 1500 TRANSFORMER S Access DooR g a SIDE VIEW 2 3 PRIMARY CABLE DUETS EXHAUST FAN ‘AND DUCT 4000 TRANSFORMER, CUSTOMER'S MAIN SECONDARY CIRCUIT BREAKER 3000 1000 W SECONDARY CABLE DucTSs G/F Transformer Vault fe 8000 _ (Double Bank) 00 3300 —_ 3100 | SECONDARY CIRCUIT —F BREAKERS METER #2 { METER #1 = 0 3] i b 7 4 : : Inf z 7h TRANSFORMER TRANSFORMER BANK #1 BANK ! Ke Blea \ 7 3 are EXHAUST FANS Z Pa AND DUCTS + med xe z 2 | PRIMARY TRANSFORMER CABLE DUCTS ACCESS DOORS PLAN L 2500 | 3000 3000 4000 2/F Transformer Vault (Single Bank) METER 2500 cUstomers | MAIN SECONDARY CIRCUIT F BREAKER 5000 409 Oi. 2400 PRIMARY CABLE DUCTS 6000 EXHAUST FAN 3 1 a ACCESS DOOR HOISTING 3 ") | Ls > 1 3 |g aeces Lwraabe 2/F Transformer Vault EXHAUST FAN ‘AND DUCT TRANSFORMER | ACCESS DOOR | HOISTIN FACILI PERSONNEL . ACCESS e DOOR, & 2 & i § g 3 2 g = GROUND GRID ? SECONDARY CABLE DUCTS “ SIDE VIEW CUSTOMER'S MAIN SECONDARY CIRCUIT BREAKER 4000 (min.) (from bottom of I-beam) 2/F c 2350 3300 2380 Transformer cusrovers wan p=) ———F Vault BReances OUT METER #1 METER #2 BREAKERS (Double Bank). PRIMARY CABLE oucTs He = PERSONNEL ACCESS DOOR | 2800 | 3 | memusr HOISTING HOISTING. EXHAUST = FAN AND BEAM BEAM FAN AND — || over bucT 000 TRANSFORMER ACCESS DOORS 3300 PLAN == a £ a 3000 3000 1/B Transformer Vault with Hatchway PERSONNEL, 6000 ACCESS GROUND GRID PRIMARY DOOR CABLE DUCTS . = =] HATCHWAY, » | OPENING © q § 2 E z . § 2 3 © y & = / E 5 { d F x SECONDARY s CABLE DUCTS PLAN CUSTOMER'S MAIN SECONDARY CIRCUIT BREAKER : 5000 1/B Transformer Vault with Hatchway PERSONNEL ACCESS DOOR 9 STAIRCASE 650 _ 3000 200, 7 are nae | faNaVENT HATCHWAY i> AIR EXHAUST ! [[werer Ag VENT PLAN (Ground Floor) 1000 3000 1000 | 1/B Transformer Vault with Hatchway PERSONNEL ACCESS. ELEVATED DOOR HATCHWAY WITH STEEL COVER AR AIR INTAKE EXHAUST FAN FAN wt * 2 6 x = TRANSFORMER, b ¥ GROUND GRID SECONDARY ‘CABLE DUCTS LOWEST BASEMENT SIDE VIEW G/F Transformer Vault — 3000 CUSTOMER'S 2 MAIN SECONDARY 2 BREAKER | i SECONDARY CABLE TRENCH a; PLAN L 1100 _L_ 1400 1400 1100 | 5000, $$$. G/F Transformer Vault 5000 1100 1400 EXHAUST FAN 8 DUCT CUSTOMER'S, SECONDARY 3000 © ec | Li BACK VIEW LOW-VOLTAGE, SERVICE CABLES G/F Transformer Vault #000 2000 2000 EXHAUST FAN & DUCT DEADFRONT 3 O 1000 TRANSFORMER | t Pp baat. PS TRANSFORMER 3 GROUND ||, Mf ACCESS DOOR 600 SECONDARY = CABLE DUCTS . PRIMARY CABLE DUCT SIDE VIEW 200| 9 oo ea \ 25 2/F Transformer Vault 3000 . | ___ 4500 REINFORCED METER PERSONNEL CONCRETE LEDGE ACCESS epee Bor — ; ; as i, TRANSFORMER ex ACCESS DOOR FAN Dn PRIMARY CABLE TRENCH g 5 3 < 8 ss 5 ~ CUSTOMER'S (7 TPN [ain if DEADFRONT TRANSFORMER BANK | SECONDARY = i BREAKER, o : $27 8 iE : ‘SECONDARY CABLE TRENCH ENTRANCE LI 1 : A L__ 1100 1400 1400 tt 1100 PLAN 5000 2/F Transformer Vault 1100 5000 1400 | 1400 CUSTOMER'S| MAIN SECONDARY| BRESKER| DEADFRONT 3000 TRANSFORMER BANK ("SECONDARY ABLES & DUCTS BACK VIEW 2/F Transformer Vault ary |__ 1500 2500 EXHAUST — | FAN & DUCT 1 DEADFRONT ses TRANSFORMER _ ia TRANSFORMER t [ | ACCESS DOOR 8 ao REINFORCED ~ 4 ‘| CONCRETE ae 3 _SECONDAR| CABLE DUCT} | PRIMARY CABLE DUCTS L 1300 "| SETBACK 25 400 ACCESS ROAD (VARIES) LA SIDE VIEW 1/B Transformer Vault tot \HATCHWAY PENING g > a 3 cont (o> CUSTOMER'S ! (( MAIN SECONDARY = BREAKER s ris a GROUND PERSONNEL || GRID bu ACCESS DOOR PLAN —_— 29990 0 1/B Transformer Vault 200 1500 4 eg! | HATCHWAY BASEMENT VAULT WALL WITH STEEL COVER 1500 EXHAUST FAN INTAKE FAN & VENT METER & VENT ' = GROUND FLOOR BUILDING WALL Ese DOOR Dn STAIRCASE ACCESS DOOR PLAN . (Ground Floor) 1/B Transformer Vault PERSONNEL _AGCESS DOOR ELEVATED f HATCHWAY WITH STEEL COVER EXHAUST > 4 FAN & VENT = 2 ; 1 o— | @ ( z DEADFRONT /| PRIMARY CABLE ‘__)| TRANSFORMER DucTS 5 weil g GROUND g i | GRID =| a ‘SECONDARY =f ag $, CABLE DUCTS } ~ 7007 700 25 SIDE VIEW 1/B Transformer Vault HATCHWAY OPENING E “EXHAUST FAN if INTAKE FAN & DUCT CUSTOMER'S MAIN SECONDARY BREAKER 3000 1100 L 1400 1400 SECONDARY _ CABLES & DUCTS 1100 J __ LOWEST BASEMENT 6000 1000 1600 = 1600 1800 G/F Transformer Vault Double Bank q ‘SECONDARY CABLE TRENCH 3) | METER #2 CUSTOMER'S WAIN ECONDARY AKER #2 FAKER #2 ‘TRANSFORMER ACCES: PRIMARY CABLE TRENCH | sh eee PRIMARY CABLE bucts DEADFRONT TRANSFORMER BANK #1 \ i i \ [ } METER #1 L209 —-! a MERAICO Fe] POWER UP TYPICAL PRIMARY METERING VAULT {iezaico cononrre POWER UP Questions? {iezaico cononrre POWER UP FORUM SERIES Thank you.

You might also like