EMPLOYMENT STATE
No : 035 – OCS B – TWPC / 005
This is to state that FERDINANDUS SIHOMBING has been working in our company
at TWPC Project at Tra Vinh , Vietnam as CHIEF OFFICER at our vessel OCS MISS BEE
since September 2020 until tentative estimation February 2022 for project demobilization
Here this statement letter made by request from respective employee for educational purpose .
Thanks
Acknowledge by ,
AHMAD FAISAL
MASTER
1. Project Overview
[Electronic document]
The plan approval office
Logbook Aktivitas Perkakas Tangan
20 – 24 Juni 2021
Identitas Mahasiswa
Nama Mahasiswa : FERDINANDUS SIHOMBING
NIM : 3422011021
Rincian Kegiatan
No Date Main Activity Remarks
1 20 June 2021 - Anchor handling activity , Multicat OCS Miss Bee pick up and - Done by Student with
deployed 5T Anchor as HDB 402 move to WTG 1. Boat Crew assistance
2 21 June 2021 - Towing Material Barge My Anh 01 cast off from Work Barge HDB - Done by Student with
402 to holding area and hand over with Towing Tug Phu My 03 Boat Crew assistance
- Receive replacement Material Barge and assist barge to and Barge Foreman
alongside Work Barge HDB 402
3 22 June 2021 - Ballasting and adjust inclination for Work Barge HDB 402 as - Student assisting Ballast
preparation for Crane Crawler Liebherr 1125 safe lifting activity Mech. & Field Engineer
4 23 June 2021 - Crawler Crane Liebherr 1125 lifting T1 , T2 and T3 pile - Done by Crane Operator
- Monthly Safety Inspection as Student monitoring
under Field Engineer
guidance
- Safety Inspection
handled by Student
5 24 June 2021 - Crawler Crane Liebherr 1125 lifting Nacelle and Blade Hub - Done by Crane Operator
- Fresh Water and Diesel Fuel Oil Bunker as Student monitoring
under Field Engineer
guidance
- Bunker handled by
Student and Boat Crew
APPENDIX :
20 June 2021
21 June 2021
Crane Crawler Liebherr 1120 Achieve safe inclination 0.3 deg for lifting Work Barge HDB 402 Tank Monitoring System
Motion Monitoring operation
22 June 2021
23 - 24 June 2020
( Ferdinandus Sihombing )
Logbook Aktivitas Perkakas Tangan
Pekan ke 1
Identitas Mahasiswa
Nama Mahasiswa : FERDINANDUS SIHOMBING
NIM : 3422011021
Rincian Kegiatan
No Date Activity Remarks
1 1 March 2020 - Discharge Oxygen , Acetylene and work equipment from AHT - Done by Student with
Nasos to Barge HDB 402 with OCS Miss Bee Knuckle Boom Rigger assistance
Crane
2 2 March 2020 - Dismantle Fairlead , Winch , Hydrolic Hoses and Wire from HDB - Done by Welder and
402 Fitter . Student assist
(progressing) Mechanic to dismantle
hydraulic hose
3 3 March 2020 - Commenced Planned Maintenance System on Generator 25 - Student assisting Chief
Kva . Change Oil Filter , Racor , Engine Oil and Coolant Water Engineer
4 4 March 2020 - Splice Wire end for Crawler Crane 1250 T Boom fastening - Student assisting Barge
- MPI test on fastening Pad Eye and apply Bulldog Clamp to lock Foreman and Rigger
Wire splice
5 5 March 2020 - Troubleshoot Generator 25 Kva fault on Engine cooling - Student assist Chief
temperature sender . Check Thermostat , Water Pump Impeller Engineer
and Temperature sensor . ( Progressing )
APPENDIX :
1 March 2020
2 March 2020
3 March 2020
4 March 2020
5 March 2020
( Ferdinandus Sihombing )