ORGANIZACIJA GRAĐENJA DOKAZNICA MJERA 1.

ZEMLJANI RADOVI

1. ZEMLJANI RADOVI
1.1. ČIŠĆENJE TERENA NA MJESTU
OBJEKTA, TE 15 m OKO OBJEKATA
SA SJEĆENJEM ŠIBLJA,
PORAVNAVANJEM TERENA ITD.

66,45 x 50,65 = 3365,69


2
m 3365,69

1.2. SKIDANJE HUMUSA BULDOZEROM


U SLOJU 20 cm S GURANJEM NA 20
m UDALJENU DEPONIJU

66,45 x 50,65 = 3365,69


m2 3365,69

1.3. ŠIROKI ISKOP ZEMLJE U TLU III.


KATEGORIJE BAGEROM

46,19 ⋅ 30,39 + 36,45 ⋅ 20,65


⋅ 3,82 = 4118 ,74
2
m3 4118,74

VLAD 1
ORGANIZACIJA GRAĐENJA DOKAZNICA MJERA 1. ZEMLJANI RADOVI

1.4. PLANIRANJE ISKOPA

36,45 x 20,65= 752,69


2
m 752,69

1.5. NASIPAVANJE OKO TRAKASTIH


TEMELJA I TEMELJA STUPA

→ koeficjent rastresitosti za zemlju = 1,30

(34,35 x 18,55) x 0,65 - 15 x (0,55 x


0,55) x 0,65 = 414,18 - 2,9 5= 411,23
3
m 411,23

1.6. NASIPAVANJE OKO TRAKASTIH


TEMELJA I TEMELJA STUPA

→ koeficjent rastresitosti za zemlju = 1,30

(35,10 x 19,30) x 0,42 - 15 x (0,30 x


0,30) x 0,42= 284,52 - 0,52 = 283,95
3
m 283,95

VLAD 2
ORGANIZACIJA GRAĐENJA DOKAZNICA MJERA 1. ZEMLJANI RADOVI

1.7. NASIPAVANJE ŠLJUNKA ZA


TAMPONSKI SLOJ DEBLJINE d=15
cm

→ koeficjent rastresitosti za šljunak = 1,25

(35,10 x 19,30) x 0,15 - 15 x (0,30 x


0,30) x 0,15= 101,61 - 0,20 = 101,41
m3 101,41

1.8. RAZASTIRANJE I NABIJANJE


ŠLJUNKA

(35,10 x 19,30) - 15 x (0,30 x 0,30)=


677,43 - 1,35 = 675,88
2
m 675,88

1.9. ZATRPAVANJE OKO GRAĐEVINE

→ volumen pruzet iz stavke 1.3.


V=4118,74

4118,74 - {(35,10 x 19,30 x 3,17) +


(36,45 x 20,65 x 0,65)}= 4118,74 -
(2147,45 + 489,25)= 1482,04
3
m 1482,04

1.10. NASIPAVANJE ŠLJUNKA KAO


POKROVA RAVNOG KROVA
DEBLJINE d=5 cm

35,10 x 19,30 x 0,05 =33,87


m3 33,87

VLAD 3
ORGANIZACIJA GRAĐENJA DOKAZNICA MJERA 2. BETONSKI RADOVI

2. BETONSKI RADOVI
2.1. BETONIRANJE TRAKASTIH
TEMELJA BETONOM MB 20, BETON
SPRAVLJEN U CENTRALNOM
POGONU

(36,45 x 1,05 x 0,65) x 2 + (18,55 x


1,05 x 0,65) x 2 = 49,75 + 25,32=
75,07
m3 75,07

2.2. BETONIRANJE TEMELJA SAMACA


BETONOM MB 20, BETON
SPRAVLJEN U CENTRALNOM
POGONU

(0,55 X 0,55 X 0,65) X 15 = 2,95


m3 2,95

2.3. BETONIRANJE NADTEMELJNOG


ZIDA TRAKASTIH TEMELJA
BETONOM MB 20, BETON
SPRAVLJEN U CENTRALNOM

(35,86 x 0,38 x 0,65) x 2 + (19,30 x


0,38 x 0,65) x 2 = 17,71+ 9,53 = 27,24
m3 27,24

2.4. BETONIRANJE NADTEMELJNOG


ZIDA TEMELJA SAMCA BETONOM
MB 20, BETON SPRAVLJEN U
CENTRALNOM POGONU

(0,30 x 0,30 x 0,65) x 15 = 0,92


m3 0,92

VLAD 4
ORGANIZACIJA GRAĐENJA DOKAZNICA MJERA 2. BETONSKI RADOVI

2.5. BETONIRANJE DONJE BETONSKE


PODLOGE DEBLJINE d=8 cm,
BETONOM MB 10, BETON
SPRAVLJEN U CENTRALNOM
POGONU

[(35,10 x 19,30) - 15 x (0,30 x 0,30)] x


0,08 = [677,43-1,35] x 0,08 = 54,09
m3 54,09

2.6. BETONIRANJE GORNJE BETONSKE


PODLOGE DEBLJINE d=7 cm,
BETONOM MB 10, BETON
SPRAVLJEN U CENTRALNOM
POGONU

[(35,10 x 19,30) - 15 x (0,30 x 0,30)] x


0,07 = [677,43-1,35] x 0,07 = 47,33
m3 47,33

2.7. BETONIRANJE BETONSKOG ZIDA U


PODRUMU ZGRADE DEBLJINE d=30
cm, BETONOM MB 20, BETON
SPRAVLJEN U CENTRALNOM
POGONU

35,10 x 0,30 x 2,72 =28,64


3
m 28,64

VLAD 5
ORGANIZACIJA GRAĐENJA DOKAZNICA MJERA 2. BETONSKI RADOVI

2.8. BETONIRANJE BETONSKE PLOČE U


PADU BETONOM MB 20, BETON
SPRAVLJEN U CENTRALNOM
POGONU

19,30 ⋅ 35,10 ⋅ 0,05


(19,30 ⋅ 35,10 ⋅ 0,05 ) + =
2

33,87+16,94=50,81
3
m 50,81

VLAD 6
ORGANIZACIJA GRAĐENJA DOKAZNICA MJERA 3. AB RADOVI

3. ARMIRANO BETONSKI RADOVI


PODRUM:

3.1. BETONIRANJE AB ZIDOVA


PODRUMA BETONOM MB 30, BETON
SPRAVLJEN U CENTRALNOM
POGONU

(35,7 x 2,92 x 0,30) + (19,60 x 2,92 x


m3 65,61

3.2. BETONIRANJE AB STUPOVA


DIMENZIJE 30 x 30 BETONOM MB 30,
BETON SPRAVLJEN U
CENTRALNOM POGONU

(0,30 x 0,30 x 3,05) x 20 = 5,49


3
m 5,49

VLAD 7
ORGANIZACIJA GRAĐENJA DOKAZNICA MJERA 3. AB RADOVI

3.3. BETONIRANJE AB GREDA


BETONOM MB 30, BETON
SPRAVLJEN U CENTRALNOM
POGONU

(35,7 x 0,30 x 0,25) x 5 + (4,60 x 0,30 x


0,25) x 28 = 13,39 + 9,66 = 23,05
3
m 23,05

3.4. BETONIRANJE AB PLOČE I


KONZOLE BETONOM MB 30, BETON
SPRAVLJEN U CENTRALNOM
POGONU

(35,70 x 19,90 x 0,25) + (23,9 x 1,5 x


0,25) + (6,0 x 1,5 x 0,25) x 2 - (5,60 x
4,60 x 0,25) = 184,63
3
m 184,63

VLAD 8
ORGANIZACIJA GRAĐENJA DOKAZNICA MJERA 3. AB RADOVI

PRIZEMLJE:

3.5. BETONIRANJE AB ZIDOVA


PRIZEMLJA BETONOM MB 30,
BETON SPRAVLJEN U
CENTRALNOM POGONU

(19,90 x 0,30 x 3,05) x 2 = 36,42


3
m 36,42

3.6. BETONIRANJE AB STUPOVA


DIMENZIJE 30 x 30 BETONOM MB 30,
BETON SPRAVLJEN U
CENTRALNOM POGONU

(0,30 x 0,30 x 3,05) x 25 = 6,86


3
m 6,86

3.7. BETONIRANJE AB GREDA ŠIRINE


30 cm BETONOM MB 30, BETON
SPRAVLJEN U CENTRALNOM
POGONU

(35,70 x 0,30 x 0,25) x 2 + (19,30 x


0,30 x 0,25) x 7 = 5,35 + 10,13 = 15,48

3
m 15,48

3.8. BETONIRANJE AB GREDA ŠIRINE


15 cm BETONOM MB 30, BETON

(5,60 x 0,15 x 0,25) x 39 = 8,19


3
m 8,19

3.9. BETONIRANJE AB HORIZONTALNIH


SERKLAŽA U OTVORU LIFTA
BETONOM MB 30, BETON
SPRAVLJEN U CENTRALNOM
POGONU

(5,60 x 0,0,30 x 0,25) x 2 = 0,84


m3 0,84

VLAD 9
ORGANIZACIJA GRAĐENJA DOKAZNICA MJERA 3. AB RADOVI

3.10. BETONIRANJE AB PLOČE BETONOM


MB 30, BETON SPRAVLJEN U
CENTRALNOM POGONU

(35,70 x 19,90 x 0,25) - (5,60 x 4,60 x


0,25) = 177,61 - 6,44 = 171,17

3
m 171,17

PRVI KAT:

3.11. BETONIRANJE AB ZIDOVA


PODRUMA BETONOM MB 30, BETON
SPRAVLJEN U CENTRALNOM
POGONU

(19,90 x 3,05 x 0,30) x 2 = 36,42


3
m 36,42

3.12. BETONIRANJE AB STUPOVA


DIMENZIJE 30 x 30 BETONOM MB 30,
BETON SPRAVLJEN U
CENTRALNOM POGONU

(0,30 x 0,30 x 3,05) x 25 = 6,86

3
m 6,86

VLAD 10
ORGANIZACIJA GRAĐENJA DOKAZNICA MJERA 3. AB RADOVI

3.13. BETONIRANJE AB GREDA ŠIRINE


30 cm BETONOM MB 30, BETON
SPRAVLJEN U CENTRALNOM
POGONU

(35,70 x 0,30 x 0,25) x 2 + (19,30 x


0,30 x 0,25) x 7 = 5,35 + 10,13 = 15,48

m3 15,48

3.14. BETONIRANJE AB HORIZONTALNIH


SERKLAŽA U OTVORU LIFTA
BETONOM MB 30, BETON
SPRAVLJEN U CENTRALNOM
POGONU

(5,60 x 0,0,30 x 0,25) x 2 = 0,84


3
m 0,84

3.15. BETONIRANJE AB
SITNOREBRIČASTE PLOČE
DEBLJINE d=25 cm, SA AB REBRIMA
ŠIRINE 15 cm, BETONOM MB 30,
BETON SPRAVLJEN U
CENTRALNOM POGONU

(35,70 x 19,90 x 0,25) + (5,60 x 0,15 x


0,25) x 39 x 6 - {(5,60 x 0,15 x 0,25) x
2} = 177,61 + 49,14 - 0,42 = 226,33

3
m 226,33

3.16. BETONIRANJE AB VIJENCA NA


KROVU, BETONOM MB 20, BETON
SPRAVLJEN U CENTRALNOM
POGONU

(35,70 x 0,30 x 0,40) x 2 + (19,30 x


0,30 x 0,40) x 2 = 8,57 + 4,63 = 13,20

3
m 13,20

VLAD 11
ORGANIZACIJA GRAĐENJA DOKAZNICA MJERA 4. ARMIRAČKI RADOVI

4. ARMIRAČKI RADOVI
PODRUM:

4.1. ARMIRANJE AB ZIDOVA PODRUMA

St. 3.1. x 100


65,61 x 100 = 6561
60 % D SS = 0,6 x 6561 = 3936,6 kg 3936,3
40 % T SS = 0,4 x 6561 = 2624,4 kg 2624,4

4.2. ARMIRANJE AB STUPOVA

St. 3.2. x 100


5,49 x 100 = 549
60 % D SS = 0,6 x 549 = 329,4 kg 329,4
40 % T SS = 0,4 x 549 = 219,6 kg 219,6

4.3. ARMIRANJE AB GREDA PODRUMA

St. 3.3. x 100


23,05 x 100 = 2305
70 % D SS = 0,7 x 2305 = 1613,5 kg 1613,5
30 % T SS = 0,3 x2305 = 691,5 kg 691,5

4.4. ARMIRANJE AB PLOČE PODRUMA

St. 3.4. x 100


184,63 x 100 = 18463
50 % D SL = 0,5 x 18463 = 9231,5 kg 9231,5
50 % T SL = 0,5 x 18463 = 9231,5 kg 9231,5

VLAD 12
ORGANIZACIJA GRAĐENJA DOKAZNICA MJERA 4. ARMIRAČKI RADOVI

PRIZEMLJE:

4.5. ARMIRANJE AB ZIDOVA PRIZEMLJA

St. 3.5. x 100


36,42 x 100 = 3642
60 % D SS = 0,6 x 3642 = 2185,2 kg 2185,2
40 % T SS = 0,4 x 3642 = 1456,8 kg 1456,8

4.6. ARMIRANJE AB STUPOVA


PRIZEMLJA

St. 3.6. x 100


6,86 x 100 = 686
60 % D SS = 0,6 x 686 = 411,60 kg 411,6
40 % T SS = 0,4 x 686 = 274,40 kg 274,4

4.7. ARMIRANJE AB GREDA PRIZEMLJA


ŠIRINE 30 cm

St. 3.7. x 100


15,48 x 100 = 1548
70 % D SS = 0,7 x 1548 = 1083,6 kg 1083,6
30 % T SS = 0,3 x 1548 = 464,4 kg 464,4

4.8. ARMIRANJE AB GREDA PRIZEMLJA


ŠIRINE 15 cm

St. 3.8. x 100


8,19 x 100 = 819
50 % D SL = 0,5 x 819 = 409,5 kg 409,5
50 % T SL = 0,5 x 819 = 409,5 kg 409,5

4.9. ARMIRANJE AB HORIZONTALNIH


SERKLAŽA U OTVORU LIFTA

St. 3.9. x 100


0,84 x 100 = 84
70 % D SS = 0,7 x 84 = 58,8 kg 58,8
30 % T SS = 0,3 x 84 = 25,2 kg 25,2

VLAD 13
ORGANIZACIJA GRAĐENJA DOKAZNICA MJERA 4. ARMIRAČKI RADOVI

4.10. ARMIRANJE AB PLOČE PRIZEMLJA

St. 3.10. x 100


171,17 x 100 = 17117
50 % D SL = 0,5 x 17117 = 8558,5 kg 8558,5
50 % T SL = 0,5 x 17117 = 8558,5 kg 8558,5

PRVI KAT:

4.11. ARMIRANJE AB ZIDOVA PRVOG


KATA

St. 3.11. x 100


36,42 x 100 = 3642
60 % D SS = 0,6 x 3642 = 2185,2 kg 2185,2
40 % T SS = 0,4 x 3642 = 1456,8 kg 1456,8

4.12. ARMIRANJE AB STUPOVA PRVOG


KATA

St. 3.12. x 100


6,86 x 100 = 686
60 % D SS = 0,6 x 686 = 411,60 kg 411,6
40 % T SS = 0,4 x 686 = 274,40 kg 274,4

4.13. ARMIRANJE AB GREDA PRVOG


KATA ŠIRINE 30 cm

St. 3.13. x 100


15,48 x 100 = 1548
70 % D SS = 0,7 x 1548 = 1083,6 kg 1083,6
30 % T SS = 0,3 x 1548 = 464,4 kg 464,4

4.14. ARMIRANJE AB HORIZONTALNIH


SERKLAŽA U OTVORU LIFTA

St. 3.14. x 100


0,84 x 100 = 84
70 % D SS = 0,7 x 84 = 58,8 kg 58,8
30 % T SS = 0,3 x 84 = 25,2 kg 25,2

VLAD 14
ORGANIZACIJA GRAĐENJA DOKAZNICA MJERA 4. ARMIRAČKI RADOVI

4.15. ARMIRANJE AB PLOČE PRVOG


KATA
St. 3.15. x 100
226,33 x 100 = 22633
50 % D SL = 0,5 x 22633 = 11316,5 kg 11316,5
50 % T SL = 0,5 x 22633 = 11316,5 kg 11316,5

4.16. ARMIRANJE AB VIJENCA NA KROVU

St. 3.16. x 100


13,2 x 100 = 1320
60 % D SS = 0,6 x 1320 = 792 kg 792,0
40 % T SS = 0,4 x 1320 = 528 kg 528,0

VLAD 15
ORGANIZACIJA GRAĐENJA DOKAZNICA MJERA 5. TESARSKI RADOVI

5. TESARSKI RADOVI
PODRUM:

5.1. OPLATA TRAKASTOG TEMELJA

(36,45 x 0,65) x 2 + (34,35 x 0,65) x 2+


(20,65 x 0,65) x 2 +(18,55 x 0,65) x 2 =
47,39 + 44,66 + 26,85 + 24,12 =
143,02
m2 143,02

5.2. OPLATA TEMELJA SAMCA

(4 x 0,55 x 0,65) x 15 = 21,45


m2 21,45

5.3. OPLATA NADTEMELJNOG ZIDA

(35,86 x 0,65) x 2 + (35,10 x 0,65) x 2


+ (20,06 x 0,65) x 2 + (19,30 x 0,65) x
2 = 46,62 + 45,63 + 26,08 + 25,09 =
143,42
m2 143,42

5.4. OPLATA NADTEMELJNOG ZIDA


TEMELJA SAMCA

(4 x 0,30 x 0,65) x 15 = 11,70


m2 11,7

5.5. OPLATA AB ZIDOVA PODRUMA

(35,70 x 3,12) + (35,10 x 3,12) + (19,90


x 3,12) x 2 + (19,30 x 3,12) x 2 =
465,50
2
m 465,5

VLAD 16
ORGANIZACIJA GRAĐENJA DOKAZNICA MJERA 5. TESARSKI RADOVI

5.6. OPLATA BETONSKOG ZIDA


PODRUMA

(35,70 x 2,72) + (35,10 x 2,72) =


192,58
m2 192,58

5.7. OPLATA AB STUPA PODRUMA

(0,30 x 4 x 3,05) x 20 = 73,20


2
m 73,2

5.8. OPLATA AB GREDA PODRUMA

(35,70 x 0,25) x 2 + (19,90 x 0,25) x 2


+ (5,60 x 0,25) x 48 + (4,60 x 0,25) x
48 + (5,60 x 0,30) x 22 + (4,60 x 0,30)
x 19 = 17,85 + 9,95 + 67,2 + 55,20 +
36,96 + 26,22 =213,38
m2 213,38

5.9. OPLATA AB PLOČE PODRUMA

(5,60 x 4,60) x 23 + (23,9 x 1,5) + (6,0x


1,5) x 2 = 592,48 + 35,85 + 18 =
646,33
m2 646,33

PRIZEMLJE

5.10. OPLATA AB ZIDOVA PRIZEMLJA

(19,90 x 3,05) x 4 + (0,30 x 3,05) x 4 =


242,78 + 3,66 = 246,44
m2 246,44

5.11. OPLATA AB STUPA PRIZEMLJA

(0,30 x 4 x 3,05) x 25 = 91,5


m2 91,5

VLAD 17
ORGANIZACIJA GRAĐENJA DOKAZNICA MJERA 5. TESARSKI RADOVI

5.12. OPLATA AB GREDA PRIZEMLJA


ŠIRINE 30 cm

(35,70 x 0,25) x 2 + (19,90 x 0,25) x 2


+ (5,60 x 0,25) x 16 + (4,60 x 0,25) +
(2,3 x 0,25) x 64 + (2,23 x 0,25) x 24 +
(2,30 x 0,30) x 28 + (2,23 x 0,30) x 10
= 17,85 + 9,95 + 22,4 + 1,15 + 36,8 +
13,38 +19,32 + 6,69 = 127,54

m2 127,54

5.13. OPLATA AB GREDA PRIZEMLJA


ŠIRINE 15 cm

(5,60 x 0,25) x 2 x 39 + (5,60 x 0,15) x


39 = 109,2 + 32,76 = 141,96
2
m 141,96

5.14. OPLATA AB HORIZONTALNIH


SERKLAŽA U OTVORU LIFTA

(5,60 x 0,25) x 4 = 5,60


2
m 5,6

5.15. OPLATA AB PLOČE PRIZEMLJA

(2,23 x 5,60) x 12 + (2,3 x 5,60) x 34 =


149,86 + 437,92 = 587,78
2
m 587,78

PRVI KAT:

5.16. OPLATA AB ZIDA PRVOG KATA

(19,90 x 3,05) x 2 + (19,30 X 3,05) x 2


= 121,39 + 117,73 = 239,12
m2 239,12

VLAD 18
ORGANIZACIJA GRAĐENJA DOKAZNICA MJERA 5. TESARSKI RADOVI

5.17. OPLATA AB STUPA PRVOG KATA

(0,30 x 4 x 3,05) x 25 = 91,5


m2 91,5

5.18. OPLATA AB GREDA PRVOG KATA


ŠIRINE 30 cm

(35,70 x 0,25) x 2 + (19,90 x 0,25) x 2


+ (5,60 x 0,25) x 12 + (19,30 x 0,25) x
10 + (4,60 x 0,25) x 4 + (0,30 x 0,25) +
(4,60 x 0,30) x 19 = 17,85 +9,95 + 16,8
+ 48,25 + 4,6 + 0,08 + 26,22 = 123,75

2
m 123,75

5.19. OPLATA AB HORIZONTALNIH


SERKLAŽA U OTVORU LIFTA

(5,60 x 0,25) x 4 = 5,60


2
m 5,6

5.20. OPLATA AB SITNOREBRIČASTE


PLOČE

{(9 x 5,60 x 0,15) + (20 x 5,60 x 0,25) +


(5,60 x 0,2875 x 4) + (5,60 x 0,35 x 6)}
x 23 = (7,56 + 28 + 6,44 + 11,76) x 23=
1236,48
m2 1236,48

5.21. OPLATA AB VIJENCA NA KROVU

(35,70 x 0,40) x 2 + (35,10 x 0,40) x 2


+ (19,90 x 0,40) x 2 + (19,30 x 0,40) x
2 = 30 + 28,08 + 15,92 + 15,44= 89,44

m2 89,44

VLAD 19
ORGANIZACIJA GRAĐENJA DOKAZNICA MJERA 6. ZIDARSKI RADOVI

6. ZIDARSKI RADOVI
6.1. ZIDANJE KANT ZIDA ZA ZAŠTITU H.I.
NF OPEKOM DEBLJIN d = 6,5 cm
PRODUŽNIM CEMENTNIM MORTOM
1:3:9

(35,86 x 2,52) x 2 + (19,90 x 2,52) x 2


= 180,73+100,30=281,03
2
m 281,03

6.2. ZIDANJE ZIDA OKNA LIFTA NF


OPEKOM DEBLJINE ZIDA d = 12 cm
PRODUŽNIM CEMENTNIM MORTOM
1:3:9

(5,60 x 3,05 x 6) + (4,60 x 3,05 x 3)=


102,48 + 42,09 = 144,57
m2 144,57

6.3. ZIDANJE PARAPETNOG ZIDA NF


OPEKOM DEBLJINE ZIDA d = 30 cm
PRODUŽNIM CEMENTNIM MORTOM
1:3:9

(5,60 x 1,10 x 6) x 3 x 0,30= 110,88

m³ 33,26

VLAD 20
ORGANIZACIJA GRAĐENJA DOKAZNICA MJERA 6. ZIDARSKI RADOVI

6.4. POSTAVLJANJE HIDROIZOLACIJE

6.4.1. POSTAVLJANJE HORIZONTALNE


HIDROIZOLACIJE PODRUMA, SA
PRETHODNIM NANOŠENJEM
BITUMENSKE EMULZIJE.1
LJEPENKA + 2 BITUMENSKA
PREMAZA
(36,45 x 20,65) -15 x (0,30 x 0,30) =
752,69 - 1,35 = 751,34
m2 751,34

6.4.2. POSTAVLJANJE VERTIKALNE


HIDROIZOLACIJE PODRUMA. 1
LJEPENKA + 2 BITUMENSKA
PREMAZA

→ površina preuzeta iz stavke 6.1.


P=281,03
2
m 281,03

6.4.3. POSTAVLJANJE KROVNE


HORIZONTALNE HIDROIZOLACIJE,
SA PRETHODNIM NANOŠENJEM
BITUMENSKE EMULZIJE.2
LJEPENKA + 3 BITUMENSKA

35,10 x 19,30 = 677,43


2
m 677,43

6.5. IZRADA PRODUŽNOG CEMENTNOG


MORTA 1:3:9
m³ 24,86

VLAD 21
I. ZEMLJANI RADOVI

REDNI BROJ JEDINIČNA BROJ GRAĐ.


OPIS KOLIČINA ŠLJUNAK
BROJ STAVKE MJERA NORME
Jedinično Ukupno
NASIPAVANJE ŠLJUNKA ZA
1. 1.7. TAMPONSKI SLOJ DEBLJINE 101,41 m3 - 1,25 126,7625
d=15 cm
RAZASTIRANJE I NABIJANJE 3
2. 1.8. 675,88 m - 1,25 844,85
ŠLJUNKA
NASIPAVANJE ŠLJUNKA KAO
3
3. 1.10. POKROVA RAVNOG KROVA 33,87 m - 1,25 42,3375
DEBLJINE d=5 cm
UKUPNO 1013,95

VLAD 1
II. BETONSKI RADOVI
PODRUM BETON MB 20

REDNI BR. JEDINIČNA BROJ GRAĐ.


OPIS KOLIČINA BETON
BROJ STAVK MJERA NORME
Jedinično Ukupno
BETONIRANJE TRAKASTIH 3
1. 2.1. 75,07 m - 1 75,07
TEMELJA BETONOM MB 20
BETONIRANJE TEMELJA SAMACA
2. 2.2. 2,95 m3 - 1 2,95
BETONOM MB 20
BETONIRANJE NADTEMELJNOG
3. 2.3. ZIDA TRAKASTIH TEMELJA 27,24 m3 - 1 27,24
BETONOM MB 20
BETONIRANJE NADTEMELJNOG
3
4. 2.4. ZIDA TEMELJA SAMCA BETONOM 0,92 m - 1 0,92
MB 20
BETONIRANJE BETONSKOG ZIDA
3
5. 2.7. U PODRUMU ZGRADE DEBLJINE 28,64 m - 1 28,64
d=30 cm, BETONOM MB 20

BETON MB 20 UKUPNO PODRUM 134,82

VLAD 2
II. BETONSKI RADOVI
PODRUM BETON MB 10

REDNI BR. JEDINIČNA BROJ GRAĐ.


OPIS KOLIČINA BETON
BROJ STAV MJERA NORME
Jedinično Ukupno
BETONIRANJE DONJE BETONSKE
3
2.5. PODLOGE DEBLJINE d=8 cm, 54,09 m - 1 54,09
BETONOM MB 10
BETONIRANJE GORNJE
2.6. BETONSKE PODLOGE DEBLJINE 47,33 m3 - 1 47,33
d=7 cm, BETONOM MB 10
BETON MB 10 UKUPNO PODRUM 101,42
PRVI KAT BETON MB 10

REDNI BR. OPIS KOLIČINA JEDINIČNA BROJ GRAĐ. BETON


Jedinično Ukupno
BETONIRANJE BETONSKE PLOČE
2.8. U PADU BETONOM MB 20 50,81 m3 - 1 50,81

BETON MB 10 UKUPNO PRVI KAT 50,81

VLAD 3
III. ARMIRANO BETONSKI RADOVI
PODRUM

REDNI BROJ JEDINIČNA BROJ GRAĐ.


OPIS KOLIČINA BETON
BROJ STAVKE MJERA NORME
Jedinično Ukupno
BETONIRANJE AB ZIDOVA 3
1. 3.1. 65,61 m - 1 65,61
PODRUMA BETONOM MB 30
BETONIRANJE AB STUPOVA 3
2. 3.2. 5,49 m - 1 5,49
DIMENZIJE 30 x 30
BETONIRANJE AB GREDA 3
3. 3.3. 23,05 m - 1 23,05
BETONOM MB 30
BETONIRANJE AB PLOČE I
4. 3.4. 184,63 m3 - 1 184,63
KONZOLE BETONOM MB 30
BETON MB 30 UKUPNO PODRUM 278,78

VLAD 4
III. ARMIRANO BETONSKI RADOVI
PRIZEMLJE

BETONIRANJE AB ZIDOVA
5. 3.5. 36,42 m3 - 1 36,42
PRIZEMLJA BETONOM MB 30
BETONIRANJE AB STUPOVA
6. 3.6. 6,86 m3 - 1 6,86
BETONOM MB 30
BETONIRANJE AB GREDA
7. 3.7. 15,48 m3 - 1 15,48
ŠIR. 30 cm BETONOM MB 30
BETONIRANJE AB GREDA
8. 3.8. 8,19 m3 - 1 8,19
ŠIR. 15 cm BETONOM MB 30
BETONIRANJE AB HOR.
9. 3.9. 0,84 m3 - 1 0,84
SERKLAŽA BETONOM MB 30
BETONIRANJE AB PLOČE
10. 3.10. 171,17 m3 - 1 171,17
BETONOM MB 30
BETON MB 30 UKUPNO PRIZEMLJE 238,96

VLAD 5
III. ARMIRANO BETONSKI RADOVI
PRVI KAT

REDNI BROJ JEDINIČNA BROJ GRAĐ.


OPIS KOLIČINA BETON
BROJ STAVKE MJERA NORME
Jedinično Ukupno
BETONIRANJE AB ZIDOVA
11. 3.11. 36,42 m3 - 1 36,42
PODRUMA BETONOM MB 30
BETONIRANJE AB STUPOVA 3
12. 3.12. 6,86 m - 1 6,86
BETONOM MB 30
BETONIRANJE AB GREDA
13. 3.13. 15,48 m3 - 1 15,48
ŠIR. 30 cm BETONOM MB 30
BETONIRANJE AB HOR.
14. 3.14. 0,84 m3 - 1 0,84
SERKLAŽA BETONOM MB 30
BETONIRANJE AB SITNORE. 3
15. 3.15. 226,33 m - 1 226,33
PLOČE BETONOM MB 30,
BETON MB 30 UKUPNO PRVO KAT 285,93

BETONIRANJE AB VIJENCA 3
16. 3.16. 13,2 m - 1 13,2
KROVA, BETONOM MB 20
BETON MB 20 UKUPNO PRVO KAT 13,2

VLAD 6
ORGANIZACIJA GRAĐENJA IV. ARMIRAČKI RADOVI

IV. ARMIRAČKI RADOVI


PODRUM

RED. BROJ JED. BR. GRAĐ.


OPIS KOLIČINA BET. ČELIK Č 37 ŽICA ZA VEZANJE
BR STAVK MJ. NORME
Jedinično Ukupno Jedinično Ukupno
ARMIRANJE AB ZIDOVA
1. 4.1.
PODRUMA
DEBELA 3936,3 kg 400,201-5 1,080 4251,20 0,0035 13,78
TANKA 2624,4 kg 400,201-2 1,080 2834,35 0,0035 9,19
ARMIRANJE AB STUPOVA
2. 4.2.
PODRUMA
DEBELA 329,4 kg 400,201-5 1,080 355,75 0,0035 1,15
TANKA 219,6 kg 400,201-2 1,080 237,17 0,0035 0,77
ARMIRANJE AB GREDA
3. 4.3.
PODRUMA
DEBELA 1613,5 kg 400,201-5 1,080 1742,58 0,0035 5,65
TANKA 691,5 kg 400,201-2 1,080 746,82 0,0035 2,42
ARMIRANJE AB PLOČE
4. 4.4.
PODRUMA
DEBELA 9231,5 kg 400,201-6 1,100 10154,65 0,004 36,93
TANKA 9231,5 kg 400,201-3 1,100 10154,65 0,004 36,93

DEBELA PODRUM UKUPNO 57,50


TANKA PODRUM UKUPNO 49,30

VLAD 7
ORGANIZACIJA GRAĐENJA IV. ARMIRAČKI RADOVI

IV. ARMIRAČKI RADOVI


PRIZEMLJE
RED. BROJ JED. BR. GRAĐ.
OPIS KOLIČINA BET. ČELIK Č 37 ŽICA ZA VEZANJE
BR STAVK MJ. NORME
Jedinično Ukupno Jedinično Ukupno
5. 4.5. ARMIRANJE AB ZIDOVA
DEBELA 2185,2 kg 400,201-5 1,080 2360,02 0,0035 7,65
TANKA 1456,8 1457 400,201-2 1,080 1573,34 0,0035 5,10
ARMIRANJE AB STUPOVA
6. 4.6.
PRIZEMLJA
DEBELA 411,6 kg 400,201-5 1,080 444,53 0,0035 1,44
TANKA 274,4 kg 400,201-2 1,080 296,35 0,0035 0,96
ARMIRANJE AB GREDA
7. 4.7.
PRIZEMLJA ŠIRINE 30 cm
DEBELA 1083,6 kg 400,201-5 1,080 1170,29 0,0035 3,79
TANKA 464,4 kg 400,201-2 1,080 501,55 0,0035 1,63
ARMIRANJE AB GREDA
8. 4.8.
PRIZEMLJA ŠIRINE 15 cm
DEBELA 409,5 kg 400,201-6 1,100 450,45 0,004 1,64
TANKA 409,5 kg 400,201-3 1,100 450,45 0,004 1,64
ARMIRANJE AB
9. 4.9.
HORIZONTALNIH SERKLAŽA
DEBELA 58,8 kg 400,201-5 1,080 63,50 0,0035 0,21
TANKA 25,2 kg 400,201-2 1,080 27,22 0,0035 0,09
ARMIRANJE AB PLOČE
10. 4.10.
PRIZEMLJA
DEBELA 8558,5 kg 400,201-6 1,100 9414,35 0,004 34,23
TANKA 8558,5 kg 400,201-3 1,100 9414,35 0,004 34,23
DEBELA PRIZEMLJE UKUPNO 48,96
TANKA PRIZEMLJE UKUPNO 43,64

VLAD 8
ORGANIZACIJA GRAĐENJA IV. ARMIRAČKI RADOVI

IV. ARMIRAČKI RADOVI


PRVI KAT
RED. BROJ JED. BR. GRAĐ.
STAVK OPIS KOLIČINA BET. ČELIK Č 37 ŽICA ZA VEZANJE
BR E MJ. NORME
Jedinično Ukupno Jedinično Ukupno
11. 4.11. ARMIRANJE AB ZIDOVA
DEBELA 2185,2 kg 400,201-5 1,080 2360,02 0,0035 7,65
TANKA 1456,8 1457 400,201-2 1,080 1573,34 0,0035 5,10
ARMIRANJE AB STUPOVA
12. 4.12.
PRVOG KATA
DEBELA 411,6 kg 400,201-5 1,080 444,53 0,0035 1,44
TANKA 274,4 kg 400,201-2 1,080 296,35 0,0035 0,96
ARMIRANJE AB GREDA
13. 4.13.
PRVOG KATA ŠIRINE 30 cm
DEBELA 1083,6 kg 400,201-5 1,080 1170,29 0,0035 3,79
TANKA 464,4 kg 400,201-2 1,080 501,55 0,0035 1,63
ARMIRANJE AB HORI.
14. 4.14.
SERKLAŽA U OTVORU LIFTA
DEBELA 58,8 kg 400,201-5 1,080 63,50 0,0035 0,21
TANKA 25,2 kg 400,201-2 1,080 27,22 0,0035 0,09
ARMIRANJE AB PLOČE
15. 4.15.
PRVOG KATA
DEBELA 11316,5 kg 400,201-6 1,100 12448,15 0,004 45,27
TANKA 11316,5 kg 400,201-3 1,100 12448,15 0,004 45,27
ARMIRANJE AB VIJENCA NA
16. 4.16.
KROVU
DEBELA 792,0 kg 400,201-5 1,080 855,36 0,0035 2,77
TANKA 528,0 kg 400,201-2 1,080 570,24 0,0035 1,85
DEBELA PRVI KAT UKUPNO 61,13
TANKA PRVI KAT UKUPNO 54,89
VLAD 9
ORGANIZACIJA GRAĐENJA IV. ARMIRAČKI RADOVI

IV. ARMIRAČKI RADOVI

DEBELA UKUPNO 167,59


TANKA UKUPNO 147,83

VLAD 10
ORGANIZACIJA GRAĐENJA V. TESARSKI RADOVI

V. TESARSKI RADOVI
PODRUM

RED. JED.
POZ OPIS KOL BR. G. N. DASKA m³ GREDICA m³ ČAVLI kg ŽICA kg KLAMFI kg
BR MJ.
Jed. Ukup. Jed. Ukup. Jed. Ukup. Jed. Ukup. Jed. Ukup.

5. 5.1. OPLATA TRAKASTOG 143,02 m2 601,201-2 0,033 4,72 0,035 5,01 0,15 21,5 0,20 28,6 0,50 71,51
TEMELJA
OPLATA
NADTEMELJNOG ZIDA
5.3. 143,42 m2 601,201-2 0,033 4,733 0,035 5,02 0,15 21,51 0,20 28,68 0,50 71,71
TRAKASTOG
TEMELJA
OPLATA AB ZIDOVA
5.5. 465,50 m2 601,201-2 0,033 15,36 0,035 16,29 0,15 69,83 0,20 93,1 0,50 232,8
PODRUMA
OPLATA AB ZIDOVA
5.6. 192,58 m2 601,201-2 0,033 6,355 0,035 6,74 0,15 28,89 0,20 38,52 0,50 96,29
PODRUMA
OPLATA AB PLOČE
5.9. 646,33 m2 601,203-2 0,033 21,33 0,035 22,62 0,15 96,95 0,20 129,3 0,50 323,2
PODRUMA
PODUPIRANJE ZA 3,05 m VISINE 0,015 9,824 0,061 39,43 0,092 59,46 0 0 0 0

DASKA m³ GREDICA m³ ČAVLI kg ŽICA kg KLAMFI kg


UKUPNO 62,32 95,11 298,1 318,17 795,43

VLAD 11
ORGANIZACIJA GRAĐENJA V. TESARSKI RADOVI

V. TESARSKI RADOVI
PODRUM

RED. JED. LETVA 3x5


POZ OPIS KOL BR. G. N. DASKA m³ GREDICA m³ ČAVLI kg ŽICA kg
BR MJ. m³
Jed. Ukup. Jed. Ukup. Jed. Ukup. Jed. Ukup. Jed. Ukup.
OPLATA TEMELJA
5. 5.2. 21,45 m2 601,210-1 0,04 0,86 0,005 0,11 0,002 0,04 0,25 5,36 0,15 3,218
SAMCA
OPLATA
5.4. NADTEMELJNOG ZIDA 11,70 m2 601,210-1 0,04 0,47 0,005 0,06 0,002 0,02 0,25 2,93 0,15 1,755
TEMELJA SAMCA
OPLATA AB STUPA
5.7. 73,20 m2 601,210-1 0,04 2,93 0,005 0,37 0,002 0,15 0,25 18,30 0,15 10,98
PODRUMA
PODUPIRANJE ZA 3,05 m VISINE 0,015 1,10 0 0 0,122 8,93 0,092 6,73 0 0
OPLATA AB GREDA
5.8. 213,38 m2 601,210-1 0,04 8,54 0,005 1,07 0,002 0,43 0,25 53,35 0,15 1,755
PODRUMA
PODUPIRANJE
ZA 3,05 m VISINE 0,015 3,20 0 0 0,122 26,03 0,092 19,63 0 0

LETVA 3x5
DASKA m³ GREDICA m³ ČAVLI kg ŽICA kg

UKUPNO 17,09 1,60 35,6 106,30 17,71
LETVA 3x5
DASKA m³ GREDICA m³ ČAVLI kg ŽICA kg KLAMFI kg

UKUPNO PODRUM 79,41 1,60 130,7 404,39 335,88 795,43

VLAD 12
ORGANIZACIJA GRAĐENJA V. TESARSKI RADOVI

V. TESARSKI RADOVI
PRIZEMLJE

RED. JED.
POZ OPIS KOL BR. G. N. DASKA m³ GREDICA m³ ČAVLI kg ŽICA kg KLAMFI kg
BR MJ.
Jed. Ukup. Jed. Ukup. Jed. Ukup. Jed. Ukup. Jed. Ukup.
OPLATA AB ZIDOVA
5. 5.10. 246,44 m2 601,201-2 0,033 8,133 0,035 8,63 0,15 37,0 0,20 49,29 0,50
PRIZEMLJA 123,2
OPLATA AB
5.14. 5,60 m2 601,201-2 0,033 0,185 0,035 0,20 0,15 0,84 0,20 1,12 0,50 2,8
HORIZONTALNIH
OPLATA AB PLOČE
5.15. 587,78 m2 601,203-2 0,033 19,4 0,035 20,57 0,15 88,17 0,20 117,6 0,50 293,9
PODRUMA
PODUPIRANJE ZA 3,05 m VISINE 0,015 8,817 0,061 35,85 0,092 54,08 0 0 0 0

DASKA m³ GREDICA m³ ČAVLI kg ŽICA kg KLAMFI kg


UKUPNO 36,53 65,25 180,0 167,96 419,91

VLAD 13
ORGANIZACIJA GRAĐENJA V. TESARSKI RADOVI

V. TESARSKI RADOVI
PRIZEMLJE

RED. POZ OPIS KOL JED. BR. G. N. DASKA m³ LETVA 3x5 GREDICA m³ ČAVLI kg ŽICA kg
Jed. Ukup. Jed. Ukup. Jed. Ukup. Jed. Ukup. Jed. Ukup.
OPLATA AB STUPA
5.11. 91,50 m2 601,210-1 0,04 3,66 0,005 0,46 0,002 0,18 0,25 22,88 0,15 19,13
PODRUMA
PODUPIRANJE ZA 3,05 m VISINE 0,015 1,37 0 0 0,122 11,16 0,092 8,42 0 0
OPLATA AB GREDA
5.12. PRIZEMLJA ŠIRINE 30 127,54 m2 601,210-1 0,04 5,10 0,005 0,64 0,002 0,26 0,25 31,89 0,15 19,13
cm
PODUPIRANJE ZA 3,05 m VISINE 0,015 1,91 0 0 0,122 15,56 0,092 11,73 0 0
OPLATA AB GREDA
5.13. PRIZEMLJA ŠIRINE 15 141,96 m2 601,210-1 0,04 5,68 0,005 0,71 0,002 0,28 0,25 35,49 0,15 21,29
cm
PODUPIRANJE
ZA 3,05 m VISINE 0,015 2,13 0 0 0,122 17,32 0,03 4,26 0 21,29

LETVA 3x5
DASKA m³ GREDICA m³ ČAVLI kg ŽICA kg

UKUPNO 19,86 1,81 44,8 114,66 80,85
LETVA 3x5
DASKA m³ GREDICA m³ ČAVLI kg ŽICA kg KLAMFI kg

UKUPNO PRIZEMLJE 56,39 1,81 110,0 294,71 248,81 419,91

VLAD 14
ORGANIZACIJA GRAĐENJA V. TESARSKI RADOVI

V. TESARSKI RADOVI
PRVI KAT

RED. JED.
POZ OPIS KOL BR. G. N. DASKA m³ GREDICA m³ ČAVLI kg ŽICA kg KLAMFI kg
BR MJ.
Jed. Ukup. Jed. Ukup. Jed. Ukup. Jed. Ukup. Jed. Ukup.
OPLATA AB ZIDOVA 2
5. 5.16. 239,12 m 601,201-2 0,033 7,891 0,035 8,37 0,15 35,9 0,20 47,82 0,50 119,6
PRVOG KATA
OPLATA AB
5.19.
HORIZONTALNIH 5,60 m2 601,201-2 0,033 0,185 0,035 0,20 0,15 0,84 0,20 1,12 0,50 2,8
SERKLAŽA
OPLATA ABUVIJENCA
OTVORU
5.21. 89,44 m2 601,201-2 0,033 2,952 0,035 3,13 0,15 13,42 0,20 17,89 0,50 44,72
NA KROVU

DASKA m³ GREDICA m³ ČAVLI kg ŽICA kg KLAMFI kg

UKUPNO 11,03 11,70 50,1 66,83 167,08

VLAD 15
ORGANIZACIJA GRAĐENJA V. TESARSKI RADOVI

V. TESARSKI RADOVI
PRVI KAT

RED. JED. LETVA 3x5


POZ OPIS KOL BR. G. N. DASKA m³ GREDICA m³ ČAVLI kg ŽICA kg
BR MJ. m³
Jed. Ukup. Jed. Ukup. Jed. Ukup. Jed. Ukup.

5.17. OPLATA AB STUPA 91,50 m2 601,210-1 0,04 3,66 0,005 0,46 0,002 0,18 0,25 22,88 0,15 13,73
PRVOG KATA

PODUPIRANJE ZA 3,05 m VISINE 0,015 1,37 0 0 0,122 11,16 0,092 8,42 0 0

OPLATA AB GREDA
5.18. PRVOG KATA ŠIRINE 123,75 m2 601,210-1 0,04 4,95 0,005 0,62 0,002 0,25 0,25 30,94 0,15 18,56
30 cm
PODUPIRANJE ZA 3,05 m VISINE 0,015 1,86 0 0 0,122 15,10 0,092 11,39 0 0

OPLATA AB
5.20. SITNOREBRIČASTE 1236,48 m2 601,204-1 0,04 49,46 0,000 0,00 0,002 2,47 0,07 86,55 0,00 0
PLOČE

PODUPIRANJE ZA 3,05 m VISINE 0,015 18,55 0 0 0,025 30,91 0,092 113,76 0 0

LETVA 3x5
DASKA m³ GREDICA m³ ČAVLI kg ŽICA kg

UKUPNO 76,19 0,62 59,9 251,05 18,56
LETVA 3x5
DASKA m³ GREDICA m³ ČAVLI kg ŽICA kg KLAMFI kg

UKUPNO PRVI KAT 87,21 0,62 71,6 301,17 85,39 167,08

VLAD 16
ORGANIZACIJA GRAĐENJA V. TESARSKI RADOVI

VI. ZIDARSKI RADOVI

RED. JED.
POZ OPIS KOL BR. G. N. OPEKA kom MORT m³
BR MJ.
Jed. Ukup. Jed. Ukup.
6. 6.1. ZIDANJE KANT ZIDA ZA
ZAŠTITU H.I. NF OPEKOM
2
DEBLJIN d = 6,5 cm 281,03 m 301,206-6 34 9555 0,03 8,43
PRODUŽNIM CEMENTNIM
MORTOM 1:3:9
ZIDANJE ZIDA OKNA LIFTA NF
6.2. OPEKOM DEBLJINE ZIDA d = 144,57 m2 301,206-1 50 7229 0,04 5,78
12 cm PRODUŽNIM
ZIDANJE PARAPETNOG ZIDA
NF OPEKOM DEBLJINE ZIDA d
6.3. 33,26 m³ 301,201- 3 385 12805 0,32 10,64
= 30 cm PRODUŽNIM
CEMENTNIM MORTOM 1:3:9

OPEKA kom MORT m³

UKUPNO 29589 24,86

VLAD 17
ORGANIZACIJA GRAĐENJA V. TESARSKI RADOVI

VI. ZIDARSKI RADOVI

RED. JED. BITUMEN


POZ OPIS KOL BR. G. N. LJEP m² BITUMEN kg
BR MJ. RASTVOR kg GORIVO kg
Jed. Ukup. Jed. Ukup. Jed. Ukup. Jed. Ukup.
6.4. 6.4.1. POSTAVLJANJE
HORIZONTALNE
HIDROIZOLACIJE PODRUMA,
2
SA PRETHODNIM 751,34 m 301,501-3 1,15 864 3,50 2629,69 0,60 450,80 8,00 6912,33
NANOŠENJEM BITUMENSKE
EMULZIJE.1 LJEPENKA + 2
BITUMENSKA PREMAZA
6.4.2. POSTAVLJANJE VERTIKALNE
HIDROIZOLACIJE PODRUMA.
281,03 m2 301,501-3 1,15 323,2 3,50 983,61 0,60 168,62 8,00 2585,48
1 LJEPENKA + 2 BITUMENSKA
PREMAZA
6.4.3. POSTAVLJANJE KROVNE
HORIZONTALNE
HIDROIZOLACIJE, SA
PRETHODNIM NANOŠENJEM 677,43 m2 301,501-5 2,30 1558 2,80 1896,80 0,60 406,46 9,00 14022,80
BITUMENSKE EMULZIJE.2
LJEPENKA + 3 BITUMENSKA
PREMAZA

BITUMEN
LJEP m² BITUMEN kg
RASTVOR kg GORIVO kg
UKUPNO 2745,31 5510,10 1025,88 23520,61

VLAD 18
ORGANIZACIJA GRAĐENJA V. TESARSKI RADOVI

VI. ZIDARSKI RADOVI

RED. JED.
POZ OPIS KOL BR. G. N. CEMENT kg VAPNO m³ PIJESAK m³ VODA m³
BR MJ.
Jed. Ukup. Jed. Ukup. Jed. Ukup. Jed. Ukup.
6. 6.5. IZRADA PRODUŽNOG
24,86 m³ 301,103-5 146 3630 0,31 7,71 0,93 23,12 0,24 5,97
CEMENTNOG MORTA 1:3:9

CEMENT kg VAPNO m³ PIJESAK m³ VODA m³


UKUPNO 3630 7,71 23,12 5,97