Pressure test log

for the compressed air system

Construction project:

Client represented by:

Contractor / responsible party represented by:

Hydrostatic leak test*


Test start (date/time) Test end (date/time)

Pipes filled with water (water quality according to EN 13445-5) and fully ventilated yes no

Ambient temperature °C Water temperature °C

Pipe material Copper Stainless steel Plastic composite pipe

Total pipe length of the compressed air system approx. m

Visual inspection of plug-in, press-fit and screwed connection carried out yes no

Plug, press and screw connectors were tight on visual inspection yes no

The piping system must be installed free of tension.

Preliminary test (test time approx. 10 minutes)


· Permissible operating pressure 10 bar, test pressure max. 1 bar
· Test pressure (10 minutes after start of test) bar Time

No leakage was detected during the test period yes no

Main test (directly after preliminary test Test time min. 30 minutes)

· Test pressure pTest ≥ pmax., perm. x 1,43 = bar Time


or pTest ≥ pmax., perm. x Fp =
(Fp = 1,25 x K20 / KTS according to EN 13445-5)

No leakage was detected during the test period yes no


*according to DGRL, Annex I, section 7.4

Place Date

Signature of client / representative Signature of contractor / representative