Construction project:
Client represented by:
Contractor/responsible party
Expert represented by:
All pipelines are closed with metal stoppers, caps or blanks or blind flanges.
Devices, pressure tanks or drinking water heaters must be disconnected from the pipes.
A visual inspection of all pipe connections for correct execution was carried out.
The temperature and steady-state condition is waited for; then the test time starts
________________________________________
Place Date
________________________________________
Signature of client / representative Signature of contractor / representative