You are on page 1of 4
HALLIBURTON Portable Off Shore Generator CL-GLHAL-IEM-PREV-L28B ‘Specific Equipment Type | Record Pi Wor reading Equipment # | "te, Standard Tractor, | (ory motor functions, Mo # Date 1200, ote propery) ALS 6PPL Gon eaateor 2000 hes B3UPSSOPF|Y OZ. 1071F al (rate RPM ode)_Wh= rol applicable use codoebalw [Vendor Name CAT ‘Componeni(e) not installed on unit being inspected [Shop Name: |2 = Task not applicable to the design of unit being Inspected PB Location [5= No engine package on unt being inspected ‘Gheck SAP maintenance order Fistor or component replacement & recent repairs. List and pint al ouStanaing orders for unit including RPM, MOD, etc [Employee Name and Number. Kaya KOVSKY. Avlox, 6109 [pale 7 OLIOT [Employee Name and Number: Vin 2; vrsikin 28 EYE Date: 74.05, 207% [Employee Name and Number [Date SAFETY = 7 SO ET ee ee ea ‘Conduct safety huddle prior to work to identify safety hazards ‘Wear appropriate PPE before beginning work. ENGINE INSPECTION 4 [oneck hoses, piping and connections for leaks, and/or damage 5__[Gheck proper operation of ar restriction gauge 3 [Check airfiterrepiace as needed 7 inspect to insure air intake covers are m place 3 [Test emergency shutdown devices f equipped JA. With engine water temperature at least 100°F, and engine operating at 1000 RPM, activate emergency kill switch. Engine should stop and ig savers shoul else. Diagnose land epair savers i they fail to operate propery, For ECM controled CAT engines use the CAT ET diagnostic software to perform the following test. ‘Activate the engine over speed function in the CAT ET Slowiy increase engine rpm unti rg saver activates B._Ensure rig savers are propery latched inthe open poston after the test. '_|Remove ESD overspeed shutdown device and inspect valve infemaly for leantinews 7 70 [Inspect stop handle and cable assembly for corrosion and proper operation Tp 77 [Check radiator, mounts, supports and guards cB 1 [Check al Roses, tines and connections for leaks Z 13[Gheck radiator for obstruction and condition 14 ee coolant level and protection to minus 34°F (-37° C) 75_[Check fan hub and fen assembly SZ 76_|Check engine coolant system for contamination CHF 77_[Check shuttor operation c 78 [Check beit condition and adjust needed 7 78 [Pressure test cooing system and cap Z 20 |Check pH and SCA and adjust as necessary r Zi” |lubreate fan hub Z_|Gheck Webasto heater Z 23_|Check ol level and inspec for contamination EE 24 [Collect engine oil sample CB 25_ [Check engine lubrication system Tor leaks or damage CE Process Owner: Giobal Equipment Maintenance Manager Preventive Maintenance Check Sheet Approver: Larry Deweese. Page 1 of 4 Revision Date: 9/21/2016 Portable Off Shore Generator HALLIBURTON CL-GL-HAL-IEM-PREV-L288 ENGINE INSPECTION (cont) initial Eg [Check condition of hot oll hoses: 27 [Clean crankcase breather 28 [Change engine oll and fiter 2 Replace air starter. 3 [Verify that starter lubricator 1s operational 3 [Rebuild idler pulley. 2 [Change belts. SSN] [Remove exhaust wrapping and inspect exhaust system Drain fuel from fuel tank & clean tank [Check fuel system for leaks 3 3 5 35 [Check tank mounting and condition 37, [Check concition of fuel ines Ed [Change fuel fiters on all engines 38 [Check fuel shut off valve and drain fuel sump a0 [Check fuel cap and vents Nt a [Add fuel conaitioner as required a, [Check exhaust system for leaks or damage a [Check exhaust system for missing paris, loose mounts [Check condition of insulation wrap [Check rain cap for proper mounting and operation, [Check for cracks in muffler flange or mounting a 5 6 a7, [Replace any manifold that is cracked e [Check all mounts for missing bolts & damage 9 Inspect condition of drip pan HIGH VOLTAGE ELECTRICAL SYSTEM initial 30 [Check condition of beakers and breaker box 3 [Check condition of electrical cord and plugs 2 [Check condition of wiring and routing 35 [Remove terminal box cover and check the condition and integniy of all wing. Check for [Secure connections CONTAINER PassiFail initial [Check condition of all sheet metal for rust and damage 5 [Check condition of doors, hinges and latches (lubricate) ‘FRAME Pass/Fail Tnitial [Check all structural members for damage, deformation or excessive corrosion Caution | JL !D0 not weld on unit without first disconnecting all magnetic pickups and MCI 7 [Check all safety guards and assure they are in place and secure. 8 Verify that the SAP equipment number is clearly marked on the unt (see the ES. [Branding web page for guidelines), [Verify that proper company logos and decals are installed as per the Branding inilatve- LA [Touch up paint as necessary to Halliburton specifications. Process Owner: Global Equipment Maintenance Manager OL CHANCED CAT bEO 45 w40 Preventive Maintenance Check Sheet Approver: Larry Deweese Page 2 of 4 Revision Date: 9721/2016 Portable Off Shore Generator HALLIBURTON CL.GL-HALJEM-PREV-L28B LIFTING STRUCTURE Pass/Fail Thitial 0 Visually inspect all fing points and welds on frame. If repairs are required have NDE Performed after repairs are made. ATTACH COPY OF INSPECTION REPORT TO THIS CHECK SHEET. Ui aT [Check and record date of visual inspection on all lifting slings and padeyes, which = required every six months. Mark container tag with a "V" and the date of the visual inspections. If due before next PM, fai this line item and have inspection done. (Note: [Create separate Certification (CERT) order to record visual inspection). [Date Last Visual Sling Inspection [Date Last Visual Padeye Inspection @ [Verify liting sing cerffication tags in place on the sing, Record: (all should be noted on certification tag), Invoice/Certt [Test Date [Sling Capacity [Sling unit # Verify all iting shackles, pins, and nuts are in place and secure. ala [Check and Record date of Last NDE on Padeyes, NDE required every year. I'due before next PM, fail this line item and have NDE done. (Note: Create separate Certification (CERT) order to record NDE inspection.) Date Last Padeye NDE cy [Check and Record date of Padeye Full Load Test, Padeye Full Load Test required avery 5 years. if due before next PM, fail this line item and have test performed. Verify Load Test Tag is on unit. (Note: Create separate Certification (CERT) order to record Full Load test) [Date Last Full Load Test of Padeyes oS [Verify that Lift Cerifcation data plate is attached to unit ENGINE RUN UP (indicate units of measure) Titial a [Record engine water temperature [Check all gauges for operation CJ [Record engine oil psi at 1600 rpm 7 pater 70, [Record hydraulic charge psi palibar 7 [Check for engine oil leaks 72 [Check for fuel leaks 7 [Check condition of insulation wrap (exhaust) 7H [Check air system for leaks i [Check air compressor governor cut off (120 psi) 75 [Check operation emergency pop off on air tank 77, [Check for hydraulic leaks 78 [Check operation of engine kill (ube valve stem) 79, [Take samples of engine oll and hydraulic fluid 30 [inspect condition of drip pan aT [Connect to ioad bank and load test for one hour. Record the following: jotage Geo Fe SOK, [Amps 2 Mak, ENVIRONMENTAL [Dispose of all waste properly. Eneure all spills are cleaned up and properly contained Process Owner: Global Equipment Maintenance Manager Preventive Maintenance Check Sheet Approver: Larry Deweese Page 3 of 4 Revision Date: 9/21/2016 HALLIBURTON Portable Off Shore Generator CL-GL-HALIEM-PREV-L28B List all defects that were found during the PM inspection with an appropriate explanation. This list will be used to create RPM orders as required. PM Check sheet line rrumber. [RPM order ® PM Check sheet line ‘number. RPM order # = }F PM Check sheet line ‘number. RPM order # PM Check sheet ine umber RPM order # JTS PM Check sheet line ‘number. IRPM order PM Check sheet line umber. RPM order PM Check sheat line umber RPM order # Process Owner: Global Equipment Maintenance Manager Preventive Maintenance Check Sheet Approver: Larry Deweese Page 4 of 4 Revision Date: 9/21/2016

You might also like