You are on page 1of 6
1. ASME STD 2. APISTD 3. What are the basic Doc required for the Start the New lay out 4, General practice for Branch Connection 5. Main pipe rack piping arranged 6. Pipe Rack Loops Distance 7, Steam Trap arrangement & TYPE 8, Known API Pump Configuration 9. What is NPSH & USE of Vertex Breaker? 10. Types of Strainer 11, Pump PIPING arrangement 12, Tank form Piping, 13, Heat Exchanger Piping 14. Column piping 15. Utility station 16. Insulation & types 17. tracing & types 18. pipe & tube Difference and use 19. But welded socket weld & Threaded fitting use 20. Sockolet and Weldolet 21, About Underground Lines 22, Factors to be consider Equipment layout design 23, Factors to be consider piping layout design 24, Factors to be consider STRU. & platform design 25. About VT lines 26. Piping Special Fittings. 27. Check List for Flow element 28. Type of exchanger 23, What are the doc you have seen while design & check 30, Review Doc, For 30%, 60% & 90% 1. ASME STD 1, ASME 831.1 power Piping 2. ASME 831.3 Process PIPING 3. ASME B31.4 Pipe Line 4, ASME B31.8 gas Transmission 2. API Std ‘API 610 ~ Centrifugal PUMP ‘API 616 —Gas Turbine ‘API617 ~ Compressor Centrifugal AP! 660 Shell & Tube Exchanger ‘APIG61 ~ Ait Cooler 3. What are the basic Doc required for the Start the New piping lay out 1 Plot plan, Process Data Sheet(PDS), Mechanical Data Sheet(MDS) P&ID, Piping SPEC, Piping Design Basis. ownen 4, General practice for Branch Connection 1. Gas, steam, Air —Top side 2. Liquid ———Bottom side 3. Allretum Line at top connection 5, How the Main pipe rack lines to be arranged 1, All_process Lines are first & sec Tire All Utility lines are Third & fourth Tire. Al pipe are arranged big bore to Small from Pipe rack column,(due to deflection of beam) Load to 25% extra for Future pipe. Slop for LFL towers BL / KO drum (KNOCK-OUT DRUM) 1:500 (0.2 %) Steam & condensate SLOP 1:100 peer, 6. Pipe Rack Loops distance 1. Min 30 m Max 60M 7. Steam Trap arrangement 1. Every 30m 2. Open type{ condensate send to Drain) & close type (return to Condensate Header) 8. pump data sheet configuration As per API 610 1. API610. (BBS)- Top suction, Top discharge 2, API610 (OH2) -End Suction, Top discharge 3, NPSH ( Net Positive Suction Head) SH (suction head) DH (discharge Head) 4, Vertex Breaker — to eliminate Air & Vapor entering the Pump to be avoid 9. Types of Strainer 1. Y-type 2. T-type 3. Temp. Strainer 4. Bucket Strainer 10. PIPING ISO MENTRIC CHECK point. 1. Piping 1SO check tist, 2. Bill of material (PMS) 3. Support tag, (STRESS DOC/ STD} 4, Insulation & piping Spec 5. Test Pr, and design parameter 6. Low point vent & drain 11, About Underground piping ©D-open drain CD-closed drain SD-solvent drain SE-SWEAGE 12. Flow Element Ro- Restriction Orifice FT-FLOW transmitter (Up steam & down steam-As per STD and Vendor Information) 13, Type of exchanger 1, Shell & tube ( Kettle type for Vapor Only) 2. PLATE FRAME HE 3. AIRCOOLER 14, What are the doc you have seen while design & check 1. PFD 2. PRID 3. Line list 4. PDS 5. MDS. 6. Data Sheet 7. Piping design specification ‘Material Specification (SPEC) 9. HSE (Health, Safety and Environmental) 10. HFE (HUMAN FACTORS ENGINEERING PRACTICE) 11. Vendor drawing 12, Handling Study 13, Stress Calculation 14. Equipment layout 15. Plot plan 16. Conceptual & composite layout 17. Ladders & platform 18. Structure Drawing 19. STANDARD(design std, Support Std) 20. Clash report andi etc. 21. 15, Review Doc. For 30%, 60% & 90% 1. For 30% a b All Process Requirement to satisfied, All Big bore Modeled Plot plan Update Nozzle orientation of Equipment Hold List ‘Model Review QUALIFICATION sheet for the Assumption P&id Markup for The Modeled Line Handling study for the Layout Access study for the Layout & markup Equpment List-Status MDS Internal model review Status and comments Plot plan Superimpase Print from Model Critical Line list Updated Line list 16. 30% Model review Status (95% comment to be closed) K. US AND DS of Flow Element Structure model status (Civil) 60% Model review Status (100% comment to be closed) HSE - Eyewash&Safety Shower location Utility station location-PA, N2, STL, UW Deludge piping Steam Tracing manifold location Steam trap arrangement Instrument air sub header Closed & solvent drain ‘Sample Cooler Revied Plot Plan & Equpment Layout

You might also like