Job Notes-: Eo Cable Rearrangement
Job Notes-: Eo Cable Rearrangement
-Job Notes-
NGA PLANNING Pre Recorded on PIPeR (Yes/No) NO
STANDARD JOB PACK PIPeR Works Order Name
Associated Estimates
Estimate No (s) Comments
GOVERNING NONE
CONCURRENT NONE
DEPENDENT NONE
JPPA Ver3.3.36
SAFETY STATEMENT
The correct installation procedure must be followed to reduce the risk of an accident. Conditions at the installation site ma y exacerbate risks to handling and lifting. BT policy
requires you to undertake an on-site assessment and if the results indicate risks above that covered by your training then you should consult your line manager/supervisor.
Any health & safety issues found while planning the work will be stated in the notes &/or job notes page. BVH_6S6CF
All OS maps reproduced by permission of Ordnance Survey. © Crown copyright 2009. All rights reserved. BT Licence Number 100028040.
BT Works Instructions. IN CONFIDENCE. Copyright. © British Telecommunications plc 2005. Registered Office: 81 Newgate Street, London EC1A 7AJ
BDUK_REST_OF_SCOTLAND_FTTC_B
Description: Project Code: 897FN Estimate No: IBQ9PGTK Page No: 2 OF 4
VH_PCP17_EO_INTERCEPT_VA1
Planner: STUART DENNISON Planner Tel No: 02086662673 Plan OUC: BLP2A5 Supp Code: 80096128
Doc Title: Job Notes Exchange: BANCHORY COW: LMC Issued: 05/04/2017
Certified By: Certifier Tel No: Company/OUC: Job Type: Duct Certified Date:
-Job Notes-1
Works Instructions / Job Notes - All completed estimate/jobs packs either Execute As Planned or Executed With Changes MUST be returned to Network Inventory (eRecords)
THE WORK CONTAINED IN THIS JOB IS PART OF THE NGA PROJECT FOR BANCHORY EXCHANGE
ANY TECHNICAL ISSUES (INCLUDING TDFS) PLEASE CONTACT NGA CuRe TST 0800 917 9670
email NGA CuRe TST G (nga.CuRe.TST@openreach.co.uk)
ALL OTHER DFEs or DCRs TO FOLLOW THE CURRENT BDUK PROCESS
THIS JOB IS TO PROVIDE CABLE AND CHANGE OVER EXISTING E/O NETWORK AS PER THE JOB DIAGRAMS AND THE ASSOCIATED NETWORK
RECORD SCHEDULES.
WORK TO BE COMPLETED IN LINE WITH E/O REARRANGEMENT BRIEFING.
FOR CLARITY, THE REQUIRED INTERCEPT POINTS FOR EACH CABLE CODE ARE SHOWN ON INDIVIDUAL A55’S – THE WORK REQUIRES THE
INTERCEPT AND CHANGEOVER TO NEW PCP17
PCP 17 ADDRESS:- OPP’ WAYSIDE COTTAGE, NORTH DEESIDE ROAD (A93), INCHMARLO, BANCHORY AB31 4FN
THIS WORK IS TO AFFECT THE TRANSFER OF E/O NETWORK TO PCP17. PROVISION OF TIE CABLES IS NOT REQUIRED AS THIS IS A COMBINED
UNIT WITH PRE-FITTED INTERCONNECT CAPACITY.
NOTE: DUCT SEALS TO BE COMPLETED WHEN ALL CABLES HAVE BEEN INSTALLED – IN LINE WITH CURRENT QUALITY GUIDELINES,
TEMPORARY SEALS TO BE APPLIED WHILST WORK PROGRESSES.
THIS JOB REQUIRES THE IDENTIFICATION OF SUITABLE INTERCEPT POINTS FOR CABLE (S) LISTED ON THE NEXT PAGE
SEE ASSOCIATED CABLE SOLUTION DIAGRAM THAT REFLECTS THE E/O CABLE SOLUTION NUMBER
All OS maps reproduced by permission of Ordnance Survey. © Crown copyright 2009. All rights reserved. BT Licence Number 100028040.
BT Works Instructions. IN CONFIDENCE. Copyright. © British Telecommunications plc 2005. Registered Office: 81 Newgate Street, London EC1A 7AJ
BDUK_REST_OF_SCOTLAND_FTTC_B
Description: Project Code: 897FN Estimate No: IBQ9PGTK Page No: 3 OF 4
VH_PCP17_EO_INTERCEPT_VA1
Planner: STUART DENNISON Planner Tel No: 02086662673 Plan OUC: BLP2A5 Supp Code: 80096128
Doc Title: Job Notes Exchange: BANCHORY COW: LMC Issued: 05/04/2017
Certified By: Certifier Tel No: Company/OUC: Job Type: Duct Certified Date:
-Job Notes-2
Works Instructions / Job Notes - All completed estimate/jobs packs either Execute As Planned or Executed With Changes MUST be returned to Network Inventory (eRecords)
CABLE N1_E/O CABLE
E SIDE INTERCEPT_JC:JRC:U2653658(JRC 11:52)_OPP’ WAYSIDE COTTAGE_NORTH DEESIDE RD_BANCHORY_AB31 4FN_GRID REF_336306796778
D SIDE INTERCEPT_JC:JRC:U2653658(JRC 11:52)_OPP’ WAYSIDE COTTAGE_NORTH DEESIDE RD_BANCHORY_AB31 4FN_GRID REF_336306796778
Cable N between E intercept point and New PCP provide 10 Metres of 50/0.5
Cable N between D intercept point and New PCP provide 10 Metres of 50/0.5
Description of work see -Cable Diagram-2- Cable code N Bar pairs ‘’K’’ 317, 366-379, 381-382, 384-385, 389, 417, 417, 422-423, 425-428, 430-432, 435-436, 438, 444-
447 & 449.
Target E side E 301-350 Target D side D 301-350.
This work is to transfer existing E/O cable N to new PCP 17 by intercepting the existing cable at E side intercept Location, straight pin connection in PCP17 and jointing in
D side at D side intercept location. Provide Tool Less Mount Columns in PCP17 and terminate E and D side cables, straight pin as per jointing schedule.
All OS maps reproduced by permission of Ordnance Survey. © Crown copyright 2009. All rights reserved. BT Licence Number 100028040.
BT Works Instructions. IN CONFIDENCE. Copyright. © British Telecommunications plc 2005. Registered Office: 81 Newgate Street, London EC1A 7AJ
BDUK_REST_OF_SCOTLAND_FTTC_B
Description: Project Code: 897FN Estimate No: IBQ9PGTK Page No: 4 OF 4
VH_PCP17_EO_INTERCEPT_VA1
Planner: STUART DENNISON Planner Tel No: 02086662673 Plan OUC: BLP2A5 Supp Code: 80096128
Doc Title: Job Notes Exchange: BANCHORY COW: LMC Issued: 05/04/2017
Certified By: Certifier Tel No: Company/OUC: Job Type: Duct Certified Date:
-Job Notes-3
Works Instructions / Job Notes - All completed estimate/jobs packs either Execute As Planned or Executed With Changes MUST be returned to Network Inventory (eRecords)
CABLE N4_E/O CABLE
E SIDE INTERCEPT_JC:JRC:U2653658(JRC 11:52)_OPP’ WAYSIDE COTTAGE_NORTH DEESIDE RD_BANCHORY_AB31 4FN_GRID REF_336306796778
D SIDE INTERCEPT_JC:JRC:U2653658(JRC 11:52)_OPP’ WAYSIDE COTTAGE_NORTH DEESIDE RD_BANCHORY_AB31 4FN_GRID REF_336306796778
Cable N between E intercept point and New PCP provide 10 Metres of 10/0.5
Cable N between D intercept point and New PCP provide 10 Metres of 10/0.5
Description of work see -Cable Diagram-5- Cable code N Bar pairs ‘’K’’ 316 & 319.
Target E side E 371-380 Target D side D 371-380.
This work is to transfer existing E/O cable N to new PCP 17 by intercepting the existing cable at E side intercept Location, straight pin connection in PCP17 and jointing in
D side at D side intercept location. Provide Tool Less Mount Columns in PCP17 and terminate E and D side cables, straight pin as per jointing schedule
JUMPERING NOTES:
WP1 ADDRESS:- JC:JRC:U2653658 (JRC 11:52) - OPP’ WAYSIDE COTTAGE, NORTH DEESIDE ROAD (A93), INCHMARLO, BANCHORY AB31 4FN.
GRID REF: 366306796778
WP2 ADDRESS:- PCP 17 (AIO) - OPP’ WAYSIDE COTTAGE, NORTH DEESIDE ROAD (A93), INCHMARLO, BANCHORY AB31 4FN.
GRID REF: 366309796776
All OS maps reproduced by permission of Ordnance Survey. © Crown copyright 2009. All rights reserved. BT Licence Number 100028040.
BT Works Instructions. IN CONFIDENCE. Copyright. © British Telecommunications plc 2005. Registered Office: 81 Newgate Street, London EC1A 7AJ