HEAT TREATMENT
05.02.2019 PROCEDURE
CONTENTS
1.0 SCOPE
2.0 REFERENCE CODES & STANDARD.
3.0 FURNACE
4.0 INSTRUMENTS
5.0 TESTING EQUIPMENTS
6.0 CALIBRATION
7.0 PLACEMENT OF THERMOCOUPLES
8.0 HEAT TREATMENT CYCLE
9.0 VERIFICATION
10 CERTIFICATION
pace?NATIONAL HEAT TREATERS
NHT/QC/SR-01_| QUALITY CONTROL PROCEDURE
REV 002
HEAT TREATMENT
(05.02.2019 PROCEDURE
SCOPE:
‘The Heat treatment procedure only for Fumace Heat Treatment,
‘The Provess of Siress relieving ,
‘Normalizing, Annealing, Solution Annealing
‘And Tempering Process. The Material of Mid Steel,Carbon Steel,
Alloy Steel Stainless steel, Steel Casting and Cast Iron Material are
Processed inthe Bogie Hearth Oil Fired Indirect Firing System Fumaces,
22
23
24
32
33
34
‘ASME SECTION Vill DIV1
INTERNATIONAL STANDARD - ISO
17663
AS PER CUSTOMER SPECIFICATION
QC MANUAL.
Bogie Hearth Oil Fired indirect Fiting System Furnace
Size: 65 Mts Long X 4 Mrs Width X 3 Mtrs Height
Bogie Hearth Oil Fired Indirect Firing System Furnace
Size: 65 Mrs Long X 2 Mrs Width X 1.5 Mirs Height
Bogie Hearth Oil Fired inirect Firing System Furnace
Size: 8.5 Mirs Long X 2 Mirs Width X 1.5 Mirs Height
Champer Type Electrical Fumace
Size : 900 mm Long X 450 mm Width
300 mm HeightNATIONAL HEAT TREATERS
INHT/QC/SR-01 | QUALITY CONTROL PROCEDURE
REV 002
HEAT TREATMENT
(05.02.2019 PROCEDURE
INSTRUMENT:
4.1. Strip Chart Recorder ( 3 Point and 6 Point ), Time,
Temperature Recorder Available for Recording the Process.
4.2. KeType ( CHRIALU) Thermocouples are using the
temperature range of 1200°C
4.3. Digital Temperature Indicator and Controllers are using and
the Temperature Range of 1200°C
S.TESTING EQUIPMENTS:
5.1 BRINELL Hardness Testing Machine are Using to check the
Hardness in the Annealed Material.
5.2 Portable and Poldi Hardness Testers are used
6.CALIBRATION
6.1 Fumaces are calibrated Once In a Year as per API 6A Standards to find out
the Temperature Uniformity inside the Fumace by providing 23 Thermocouples.
‘As per the API 6A Standards the Furnace Uniformity
is + 8°C For Stress Relieving and + 14°C For Normalizing Temperature,
6.2. Recorder , controller, and thermocouples shall be calibrated once in 3 months.
63 Testing Equipments shall be calibrated once in 6 months.
f. rae totsNATIONAL HEAT TREATERS
NTOCTSRO "QUALITY CONTROL PROCEDURE
ev 002
HEAT TREATMENT
(05.02.2019 PROCEDURE
‘LPLACEMENT OF THERMOCOUPLES
(EAT.
7.° The Number of Thermocouples and the Location of Thermocouples shall be Decided depending up onthe Job size
and Loading Area All the Thermocouples are in touch on the Job Only, and the Distance Between
‘he Thermocauples not Exceeding 3.5 Cumir __ to cover Loading Area Top Middle and Bottom.
‘These Thermocouples shall be connected tothe Temperature Recorder and Control.
7.2 Minimum of 3 and Maximum of 9 Thermocouples shall be provided.
73 Allthe Thermocouples are Maintaining the Job Temperature only
8.1 Loading Temperature, Temperature ofthe Furnace at the Stage of Loading Below 300°C or Room Temperature.
£82 Rate of Heating : Rate of Heating shall be 200°C Per Hour Divided by Maximum metal Thickness in Inches,
83 Soaking Time
Heat Treatment method Soaking Temoerature
{STRESS RELIEVING 610° Ca 10°C
At.carbon Steel - Pt 2 hours plus 15 min for add Th
Normalizing 880°C-900"C
AZAly steel -P3 Stess eieving _620°C-650°C 4 Inch =1 Hour above 2 inch=
Nomalzng 900°C-9206 2hours plus 15 - min for add Th.
AS Ally steel -P4 Stressrelieving __650°C-680°C 4 Inch =1 -Hour above 2inch=
Normalizing 920"C-960°C hours pls 15 min for add Thk
‘Ad Alloy steel-PS Stresstelieving _680°C-705"C “Inch =1 Hour above 2inch=
Normalizing 920°C-950°C ours plus 15 -min for add Th
84 Rate of Cooling: Rate of Cooling shall be 260°C per Hour Maximum
(hdd by Maximum Metal Thickness in Inches
8.5 Unloading Temperature: The Unicading Temperature shall be 300°C Maximum Unless
Customer is not SpecifiedNATIONAL HEAT TREATERS
fnTTOC ROT "QUALITY CONTROL PROCEDURE
revonz
HEAT TREATMENT
03.02.2019 PROCEDURE
|SVERIFICATION:
O.CERTIEICATION:
8.1 Loating ofthe Item into the Fumace shal be witnessed, Location and Number of Thermocouples.
‘Shall be Checked by the Plant Engineer( QC ) Thermocouple compensatve cable shall be
Connected With the Contoler and Recorder o record the complete process.
1011 ter Completing the Process he Heat Treatment char shal be Vriied and Submited
Cul signed bythe Cualty contol Manager.
‘The Chart Contains the folowing
2.Char number
Customer oretent name
¢ Delve callan or Heat Treatment Requestor PO number
4 Desorption of heat tested Materia
«Loading Temperature Rate of Heating, Soaking Temperature Soaking time,
rate of cooing and Unloading Temperature
{Date of process
10.2 The Hardness of all the Annealed Material shall be checked and