Debit Note
To Accounts Department
Please debit following material from KEC running bill for material consumed in Tower Crane
foundation Pile.
Backup Sheet attached
Total Cement consumption: 19.954 MT
Flyash : 0.068 MT
Steel : 11.193 MT
f a
Le Ble, Ph debek Tho gore,
4 ie ahoe menfareal ina fexsop
| Ay CLunal- uaege of Fyre]
KEQ deepe of vaXk,
\i}e [ zy
iC S [enwKEC INTERNATIONAL LTD.
\YKAY CENENT (CENTRAL) LTD, PANNA.MP
CEMENT & FLY ASH CONSUMPTION STATEMENT FOR EXTRA PILING.
Works
Dato:13.07.2024
SiNo ‘Name of The structure urs uso [rota
1. Tower crane & other 4544
2 lame 710
[fost Quanty for LA BILL Noo sz10] 45344
{Sement consumption Par cum
[tal Cement Geneumption in iT
1)
‘ass
ratcmavan pecan
0.04] 0.000] a |
[Total By Ash Consumotn MT |e 0.089]
col Lized etl
“WT CONSUMPTION STATEMENT FOR EXTRA PRING
nm
Fm Te (Toe
oa | Do
[Tower Gane &cther
7 7
mere > This Oty of Commit, by :
Ye L Rinlncement
TH mefoval we in Kee Toemrane cok =