You are on page 1of 2
Dated 14/08/2021 (Debit Note of KEC) JKCL's Cement, Fly Ash & TMT used b KEC for its own works S.No Structure Length ‘Width | Height Quantity of concrete {in cum) M30 RCC Grade Kec Tower Crane Details| 1 Preheater 18mT 4s 45 2.25 45.5625 - 2 Clinker silo 71 71 47 85.697 3 Preheater 6mT_ 5.6 5.6 1.37 42.9632 _— 4 Raw Mill Building -1. 5.6 5.6 1.37 42.9632 — 5 Raw Mill Building -2 5.6 5.6 1.37 42.9632_— Total Concrete In Tower Crane 260.1491 @| S70 [structure Length Width [Height] Quantity of concrete (in cum)M7.5 PCC Grade 1 Preheater 18mT 47 47 01 2.209 2 Preheater 6mT_ 58 5.8 0.1 3.364 3 Raw Mill Building -1 58 5B O14 3.364 4 Raw Mill Building -2 5.8 58 01 3.364 Total Concrete in Tower Crane 22301 S.no |Structure Length |Width Height Quantity of concrete (in : cum)M15 PCC Grade (eh ne) 1 Clinker silo 72 72 0.373 19.33632 Total Concrete In Tower Crane 19,33632 M30 [M15 [M75 Total in MT FA peau 1 Cement Consumeaty | 89.751 4.293] 1.661 95.705 “GFE |MTy eS 2 Flyash Consume QTY 25.234] 1.354) 0.554] 27.142 — IMT @ ANTS © 3 TReinforcement ary 21.483 21.483, MT y —— ts WE — dusted Comect (ore) - 96-07 Des REC, ‘ PAs - 24.142.NT se ah a Q\ uo Mes MT HI THT = 2I are er Ph dabife ta cencunt at jn Kee. pes usage. of Ate] far ed an ep (de ae ern ’ » = aaa SER SEES 30_| awe Tamera 16 __[ Berens e300 [9 +} —> 51400 aT z a as a 2 [earaaiesmconr foe see te 2a sa Bt tee eee = 5 a2 [asa | “i769 | et} Seam [933 za baeaeat (“900 [23] ig | on = i 225 wa IE

You might also like