Professional Documents
Culture Documents
ii) Meeting with Mr. Abdul Razzaq (Technical Head Arc Furnace Agha Steel) physically visit
ASML at 12:00 PM.
iv) Discussion regarding Vetting of Specifications provided by Mr. Franz for Boiler from
another Consultant.
a. Yeast Project
b. Potential Venture of Steel through Chinese Company.
vii) Discussion on Write Up for selling power to National Grid or reverse metering. Same is
to be discussed with Lafhaaz Owner.
ix) Meeting with Ch. Younis and Team regarding Cane Development Plan for February
Sowing and provision of Loan to Growers through Seed and other inputs.
d. Locking of Annual Repair & Maintenance Items based on Repeat Order as per
previous history of 2-3 years (Rough Purchase Order) based on which
negotiations can be held with suppliers.
e. Discussion regarding possible venture with Chinese Companies for Steel Project
or venture with already operating Steel Mills wishing to expand their operations.
xiv) Meeting with Mr. Ali Jawwad and Mr. Asad Rashid regarding revised Feasibility of Steel
with assumptions.
xv) Meeting with Mr. Imran regarding Cost Reduction Plan of HR.
xi) Arrangement of payment of Battersea Flats London. Same is due to be paid in December
2021. Arrangement of Mortgage and Tax Planning of New properties.
xvi) Discussion with Altaf Sb on plan for disposal/usage of Old Empty Bags of previous
Seasons.
Best Regards