ITEM DESCRIPCION DEL BIEN M3 LATAS EN M3 M3 EN LATAS
1 ARENA GRUESA 36.00 52.00 1872.00
2 HORMIGON 58.00 52.00 3016.00 3 PIEDRA CHANCADA DE 1/2" 32.00 53.00 1696.00 4 ARENA FINA 17.00 52.00 884.00 5 CEMENTO 710.00 1.00 710.00 TOTAL DIAS ZO LATAS X VIAJE EN 4 TOTAL DIAS ACEMILAS 24.00 78.00 24.00 125.67 24.00 70.67 24.00 36.83 24.00 29.58 340.75 AGREGADOS PARA PTAP SAN LORENZO ITEM DESCRIPCION DEL BIEN M3 LATAS EN M3 M3 EN LATAS
1 ARENA GRUESA 36.00 52.00 1872.00
2 HORMIGON 58.00 52.00 3016.00 3 PIEDRA CHANCADA DE 1/2" 32.00 53.00 1696.00 4 ARENA FINA 17.00 52.00 884.00 5 CEMENTO 710.00 1.00 710.00 TOTAL DIAS LORENZO LATAS X VIAJE CON 12 TOTAL DIAS ACEMILAS 72.00 26.00 72.00 41.89 72.00 23.56 72.00 12.28 24.00 29.58 133.31