You are on page 1of 6

Business transformation through

real-time data management


Craig Harclerode AVEVA

T
his is a story about an innovative company
looking for innovative solutions. Petro Rabigh Petro Rabigh products are used in such end
deployed the PI System™ as the founda- products as plastics, detergents, lubricants,
tion for its operations data management strategy. resins, coolants, anti-freeze, paint, carpets,
The PI System implementation was spearheaded rope, clothing, shampoo, auto interiors, epoxy
by Nidhal Jamal, Head of Instrumentation and glue, insulation, film, fibers, household appli-
Control Technical Support, and Shabaz Mukadam, ances, packaging, candles, pipes and many
System Engineer. Ultimately, the PI System ena- other applications.
bled Petro Rabigh to create one single source of
truth for its operations data and drive digital trans-
formation across the organisation. With reliable global pandemic that has forced employees to
real-time data and insights available to key stake- work remotely – and the pressure only contin-
holders throughout the company, Petro Rabigh ues to increase. As downstream oil and gas com-
discovered new ways to optimise refinery and pet- panies face excess capacity and dwindling profits,
rochemicals operations. digital transformation is no longer an option. It’s
essential.
Petro Rabigh at a glance Seven years ago, Petro Rabigh understood the
The downstream oil and gas industry faces critical role real-time data management plays in
a number of short and long-term hurdles. driving business transformation. Focused on cre-
Fluctuating oil and petrochemicals prices, chang- ating a more agile organisation, using real-time
ing environmental and operations regulations, operations data to increase visibility, and lever-
decreasing margins, and slowed industry growth aging that data to uncover new efficiencies, the
all put pressure on refineries and petrochem- Saudi Arabia-based refining and integrated pet-
ical producers every minute of every day. Add a rochemicals company embarked on a journey to

Case studies (cont.)


www.digitalrefining.com/article/1002658 November 2021 1

Secure data sharing using PI Cloud Connect


acy historian was fraught with availability and
“When you only have something that is so
reliability issues, costing teams valuable time
basic and rudimentary, you don’t see the
and delaying insights. The historian required
potential until you actually get something
weekly scheduled restarts to ensure availabil-
like the PI System that gives you a lot of
ity and intermittent failures affected third-party
opportunity and capability.”
applications. Recovery time caused application
Nidhal Jamal, delays.
Head of Instrumentation and Control Technical Support In addition to data reliability issues, Petro
Rabigh lacked data quality. Legacy servers had
tag limits, requiring a multi-server setup to meet
current demand. Failures caused gaps in oper-
transform its facility – and the business – using ations data, which meant teams had to verify
operations data. Petro Rabigh, a joint venture monthly reporting to ensure accuracy. “Because
between Saudi Aramco and Japan’s Sumitomo of the intermittent failures of the system, we had
Chemical, was determined to find a solution that a lot of gaps in the data,” Jamal said. Operations
would underpin its operational excellence strat- data was not contextualised, making it diffi-
egies. Petro Rabigh deployed the PI System as cult to find and extract insights. Without access
its data foundation at a 400,000-barrel capacity to timely data or proper context, it was cum-
refinery and integrated petrochemicals complex. bersome and time consuming to gain real-time
The Enterprise Agreement (EA) was a critical situational awareness into current asset perfor-
part of this deployment because it allowed Petro mance. “When you only have something that is so
Rabigh to scale its PI System to drive value across basic and rudimentary, you don’t see the poten-
the organisation. Today, the EA enables Petro tial until you actually get something like the PI
Rabigh to expand its data-driven culture and System that gives you a lot of opportunity and
accelerate digital transformation. capability,” Jamal said.
 EA signed in 2014, PI System is rolled out in In 2010, Petro Rabigh started a large-scale
2015. project that would eventually require its leg-
 300,000 tags/80-90,000 analysis calculations. acy historian to be replaced. The team chose the
 400,000 bpd of crude and 15 million tons of PI System as its operations data management
refined products and 5 million tons of petro- platform. With the help of a system integrator,
chemical products monitored with the PI System Petro Rabigh deployed the PI System in just six
across 30 plants. short months. In 2014, Petro Rabigh signed the
 800+ users of PI Vision across the company. Enterprise Agreement (EA).

The digital transformation journey begins The power of context


Seven years ago, Petro Rabigh was facing a As part of the PI System deployment, the Petro
number of data management challenges. Its leg- Rabigh team created a data model in Asset
Framework (AF), the contextu-
alisation layer of the PI System.
The data model created an asset
hierarchy for structuring and
contextualising real-time data.
By moving away from tag-based
monitoring and leveraging the AF
er
asset hierarchy, the Petro Rabigh
n team gained access to real-time
streaming analysis. Currently,
The Petro Rabigh is running 80,000-
90,000 near real-time analyses in
ure
AF.
party In addition, the data models
ays. in AF laid the right data founda-

The power of context


2 November 2021 www.digitalrefining.com/article/1002658

mand.
eant
particularly useful for process engineers during the
COVID-19 pandemic.

tion to integrate PI System data into other enter- 04 thePetro


COVID-19 pandemic.
Rabigh: Business Thesereal-time
transformation through mobile moni-
data management

prise systems, including SAP. After testing the PI toring capabilities have democratised insights
Integrator for Business Analytics, Petro Rabigh to management, engineers, and others, giving
determined that ease of integration and minimal teams the visibility they need to work remotely
maintenance needs made this an ideal solution to when necessary. Mobile monitoring was par-
integrate PI System data with SAP. Now, AF runs ticularly useful for process engineers during the
calculations using the defined model, and final COVID-19 pandemic.
values are sent to SAP using the PI Integrator.
Those values are used for reports, workflows, and From reactive to predictive operations
environmental KPIs. Prior to implementing the PI System, Petro
Rabigh used a scheduled maintenance strat-
A 360˚ view into the enterprise egy. Teams followed manufacturer guide-
After its initial PI System rollout, Petro Rabigh lines and performed maintenance based on
deployed PI Vision, a web-based visualisation set time periods rather than actual asset con-
platform for PI System data, across the com- ditions. Without real-time operational intelli-
pany. The PI Vision screens visualised infor- gence into  asset conditions, teams were likely
mation based on the asset hierarchy developed to miss performance anomalies or other red
in AF. The Petro Rabigh team converted 1,700- flags. This  could result in unplanned down-
1,800 DCS graphics into PI Vision displays based time or extra costs associated with unnecessary
on AF templates. Simple PI Vision dashboards maintenance.
now show actionable information in real time, Using the PI System and PI Vision dashboards
including asset health status, flare monitoring, to improve operations data management, Petro
and more. More complex visualisations allow Rabigh moved away from reactive strategies and
engineers to zoom into additional asset layers towards condition-based maintenance. Subject
and perform further analysis. These real-time, matter experts can monitor and visualise condi-
contextualised insights enable teams across the tion equipment in real time using PI Vision and
enterprise to quickly make data-driven decisions receive soft alarms or notifications should per-
about the plant. formance move above or below a set threshold.
By visualising operations data in PI Vision, All PI System notification alarms are parame-
Petro Rabigh eliminated the need to use spread- ter-driven, which means people at various levels
sheets to perform analyses. Team members can of the organisation receive alerts depending on
access PI Vision on the business network or via the severity of the issue.
mobile devices, which enables them to securely By moving away from scheduled maintenance
view operations data and insights away from the and leveraging real-time PI System data, Petro
sensitive process control network. Rabigh is detecting problems sooner, recog-
In addition, process engineers used DCS graph- nising early signs of asset failure, and perform-
ics and other KPI dashboards in PI Vision to ing repairs in advance to avoid unnecessary
monitor processes remotely during the height of shutdowns.

www.digitalrefining.com/article/1002658 November 2021 3


Case studies Complying with environmental standards
Petro Rabigh
With a solid at a glance
operations data management strat- Petro Rabigh closely monitors environment pro-
egy in place, Petro Rabigh engineers can now cess parameters to ensure compliance with emis-
quickly and easily use the PI System to configure sions and national standards. The team defined a
The downstream
real-time oil and
decision gas industry
support toolsfaces
anda solutions.
number The Enterprisemodel
hierarchical Agreement
in AF(EA) was a critical
specifically part
for environ-
of short and long-term hurdles. Fluctuating oil and of this deployment because it allowed Petro Rabigh
Here are just a few of their successes. mental parameters from the plant. These param-
petrochemicals prices, changing environmental and to scale its PI System to drive value across the
eters include air monitoring (stack, flare, flue
operations regulations, decreasing margins, and organization. Today, the EA enables Petro Rabigh to
A single source of truth for reporting gas, fuel gas, etc.), waste water (cooling tower,
slowed industry growth all put pressure on refineries expand its data-driven culture and accelerate digital
Prior to deploying the PI System, Petro Rabigh blow down water, oil/water separator pits, sump
and petrochemical producers every minute of every transformation.
had no single source of truth for reporting. pits, etc.) and lab data (including ammonia,
day. Add a global pandemic that has forced employees
Analyses were split across numerous spread-
to work remotely – and the pressure only continues
COD, sulphide,
y EA signed turbidity,
in 2014, PI Systemetc.) is sent
is rolled out in from
2015. the
sheets and compliance reports were time con-
to increase. As downstream oil and gas companies
Laboratory Information Management System to
y 300,000 tags/80-90,000 analysis calculations.
suming.
face excessData quality
capacity impacted
and dwindling monthly
profits, digital and the PI System where it will be contextualised in
quarterly reporting
transformation and an
is no longer teams spent
option. hours con-
It’s essential. the model.bpd of crude and 15 million tons of refined
y 400,000
tinually verify reporting accuracy. The system
products and 5calculates
million tonshourly and daily
of petrochemical aver-
products
Seven yearsto
Thanks ago,
thePetro Rabigh understood
PI System and the AFthe critical
data hier- ages in AF using
monitored with thePIPI Analytics. This
System across 30 data
plants.is then
role real-time data management plays in driving
archy, all of Petro Rabigh’s reports are seamless sent to the SAP system using PI Integrator
business transformation.
and centralised. Focused
Standard KPIson are
creating
based a more
on the y 800+
for users ofAnalytics.
Business PI Vision across the event
In the company. the values
agile organization, using real-time operations
AF model, which created consistent benchmarks data to received from the PI System exceed acceptable
increase visibility, and leveraging that data to uncover
for all areas of the operation. Teams can now limits, the defined workflows in SAP are trig-
new efficiencies, the Saudi Arabia-based refining and
confidently extract monthly and quarterly com- gered. This enables Petro Rabigh to take immedi-
integrated petrochemicals company embarked on a Petro Rabigh products are used in such end
pliance reports without spending valuable hours. ate corrective actions.
journey to transform its facility – and the business – products as plastics, detergents, lubricants,
using operations data. Petro Rabigh, a joint venture resins, coolants, anti-freeze, paint, carpets,
Production accounting calculations
between Saudi Aramco and Japan’s Sumitomo
Real-time asset monitoring
rope, clothing, shampoo, auto interiors,
Together, the PI System and AF have trans-
Chemical, was determined to find a solution that
Real-time asset monitoring is critical to ensuring
epoxy glue, insulation, film, fibers, household
formed
would PetroitsRabigh’s
underpin operationalproduction accounting
excellence strategies. that equipment is operating
appliances, packaging, safelypipes
candles, andand
efficiently.
processes.
Petro RabighPI Systemthedata
deployed from as
PI System across the plant
its data As part
manyof theapplications.
other PI System deployment, Petro
is collected,
foundation at aaggregated, andcapacity
400,000-barrel processed in AF. AF
refinery Rabigh opted to make its compressor vibration
quickly
and and easily
integrated gives Petro
petrochemicals Rabigh consistent,
complex. data available to key stakeholders in the organ-
reliable production information that can be easily isation. “They wanted to monitor compressor
analysed and validated – without having to man- health and compressor data as well,” Jamal said.
ually export raw data or perform time-consuming The team pushed vibration data into the PI
Excel calculations. Production summary informa- 02 System to monitor
Petro Rabigh: its compressor
Business transformation fleet
through real-time in real
data management
tion from AF is interfaced to SAP to easily enable time and enable teams to view contextualised
financial reporting, including operational margin data from compressors in PI Vision. Today, the
calculations. main dashboard shows all compressors and

4 November 2021 www.digitalrefining.com/article/1002658


identifies if any compressors are currently una- Defining and monitoring critical operating
vailable or operating outside of set parameters. parameters
Thanks to the AF hierarchy, teams can easily Critical operating parameters, or COPs, are mon-
drill down into specific compressors to investi- itored attributes that can be used to detect any
gate further. deviations from standard operating conditions.
Such real-time monitoring quickly became crit- Deviations can potentially offer an early indi-
ical for the team’s day-to-day operations, includ- cation of a developing problem. These COPs are
ing power supply test and pressure relief valve critical to ensuring product quality and profita-
monitoring. The PI System enabled teams to bility. Asset parameters operate within the design
respond faster than ever in the event of a perfor- limits to ensure availability and that plant equip-
mance anomaly. ment is continually operating correctly. COPs are
In addition, real-time asset monitoring also critical, which is why Petro Rabigh uses the PI
helped with the creditors reliability test (CRT). System to monitor them in real time.
“We set some soft alarms and critical alarms The team configured a COP model in AF, so
as well as dashboards to monitor live data,” they could monitor parameters on a daily basis.
Mukadam said. “This proved to be incredibly The AF model calculates KPIs, including COP
important during the critical reliability test.” exceedance count and accumulated exceedance
Thanks to PI Vision’s visual alarms that changed time, 24 hours per day for the past seven days.
depending on levels or urgency, Petro Rabigh These calculated KPIs are then visualised in PI
prevented asset failure and passed its CRT. Vision dashboards, giving teams quick and easy
access to critical information. Operations person-
Monitoring and mitigating flaring activity nel can use PI Vision to view a plant-level sum-
Reducing flaring is a high priority for Petro mary and details of all COPs that have exceeded
Rabigh. Not only will flare reduction save the set parameters.
company money, decreasing hydrocarbon burn-
ing improves sustainability and is good for the Alleviating pressure valves in real time
environment. Prior to deploying the PI System, There are many high-pressure vessels inside the
Petro Rabigh did not monitor flaring in real time, Petro Rabigh process plant. These vessels are
making it difficult to determine the root cause equipped with pressure relief valves (PRV) that
and ensure accountability. passively release pressure if it exceeds set param-
To enable real-time monitoring, the team first eters. When they did operate, they were diffi-
created a model in AF to define the hierarchy of cult to monitor, and the company lacked data for
assets. They added more than 150 control val- future analysis. This hindered any subsequent
ues and used those values to analyse and mon- investigations that sought to identify the root
itor flaring activity. “Asset Framework helped cause.
us design the hierarchy for the flare model, so Using the PI System, Petro Rabigh developed a
we continuously know how much it is flaring pressure relief valve monitoring system. The sys-
in real time,” Mukadam said. The results were tem uses predefined pressure reference setpoints.
displayed in PI Vision, allowing teams to eas- These setpoints are modelled in AF, and results
ily analyse flaring. Teams also received notifi- are visualised in PI Vision dashboards. Once a
cations when flaring occurred, enabling them to PRV is activated, it is reported and can be visual-
take action. ised in existing plant KPI dashboards.
Now, each area of the operation is responsi- These PI Vision dashboards enable operations
ble for monitoring its own flaring activity and and other users to monitor all activated PRVs
the associated costs from them. Management and take required corrective actions to main-
receives notifications when the cost exceeds a tain safe operations. The dashboards provide the
certain amount per hour, giving them the infor- details, such as PRV name, set pressure, pressure
mation they need to ask the right questions. reference, and site location for each PRV that is
Thanks to the PI System, Petro Rabigh is working being actively monitored by the plant. Operations
to reduce flaring, which also reduces the associ- teams can easily see active valves using high-
ated expenses and the environmental impact on lighted displays that also show the active time in
company operations. hours. Now, teams within each individual depart-

www.digitalrefining.com/article/1002658 November 2021 5


ment have access to PI Vision dashboards, ena- organisations spreading data collection, point by
bling them to quickly and easily monitor active point, from one installation to the next. However,
pressure valves in real time. while each site gains value, companies are miss-
ing the opportunity to deploy the PI System
Secure data sharing using PI Cloud Connect strategically across the entire organisation. The
Petro Rabigh often enlists third-party experts, deluge of IoT data from the rapidly growing num-
such as manufacturers and licensors, to analyse ber of sensors, tag pricing for each new installa-
asset performance. Licensors often use proprie- tion, and the need for consistent data modelling
tary models and information to perform analysis. often become logistical challenges, posing barri-
These third-party companies must have access ers to expansion and strategic growth.
to Petro Rabigh’s asset data to run analyses. PI While many organisations unroll the PI System
Cloud Connect quickly and easily enables Petro incrementally, more and more customers are
Rabigh to share the real-time process data in the choosing to deploy enterprise-wide with the
PI System with licensors. Enterprise Agreement (EA) program. With an
Models for the different process units are cre- EA, your company can collect and visualise all
ated in AF, and these models send configured operations data and strategically integrate IT and
process data to the licensor through PI Cloud business data for optimal vision and value reali-
Connect. Now, Petro Rabigh shares real-time sation. The result is an accelerated and more effi-
data for its Naphtha, Aromatics, a-Butyl, EPR cient path to success.
processes with licensors so they can moni- The EA removes the burden of counting
tor numerous areas of the plant. Licensors can licenses, minimises complicated deployments
now monitor Petro Rabigh’s reactor feed heat- and ad-hoc practices, and delivers advisory ser-
ers, stripper reboilers, preheaters, inter-heaters, vices for a successful enterprise deployment of
column monitoring, clay treaters, and feed and the PI System.
effluent heat exchangers. Today, over 175 PI System customers have
This in-depth data sharing not only harnesses taken advantage of the EA program to accelerate
third-party expertise to fix issues, PI Cloud strategic vision and deliver business transforma-
Connect enables Petro Rabigh to get expert tions. Through an EA partnership, our custom-
knowledge about the efficiency and health of its ers mitigate technical and business risk while
process critical equipment. This includes pumps, future-proofing their companies to take advan-
compressors, heat exchangers, and more. This tage of change.
time-series process data is further used by the EA delivers a program that is designed to:
licensor to calculate proprietary KPIs. Licensors  Accelerate the value and business impact of
send calculated KPIs back to Petro Rabigh the PI System.
through the licensor cloud system. This enables  Encourage people to capture more data.
Petro Rabigh’s process engineers and licensors  Reduce and eliminate pricing penalties and
to collaborate and respond quickly in the event of licensing headaches.
any operational changes.  Minimise the cost of deployment and total cost
In addition, Petro Rabigh is now conduct- of ownership.
ing a proof-of-concept using PI Cloud Connect  Deliver improved scalability and reliability for
for an advanced digital twin concept for the the future.
Naphtha continuous catalytic reforming (CCR)
unit. Process data, including reformer, separa-
tor, drum, and bottom pumps, is shared with the
licensor through PI Cloud Connect.
LINKS
More articles from: OSIsoft
Enterprise Agreement (EA) program
More articles from the following categories:
Upon deployment, customers immediately real-
Instrumentation, Automation and Process Control
ise the value of the PI System. This often leads to

6 November 2021 www.digitalrefining.com/article/1002658

You might also like