(1) Project Title
Construction of Hotel Complex and Parking Lot in ITC
(2) Project Scope ITC Hotels has its headquarters in Gurugram, Haryana. The project
Abstract aims at realizing new Hotel in Gurugram. The Hotel will be located in
the city center. An underground parking lot will be built as well.
(3) Project Manager Level of Authority (4) Project Sponsor(s) (5) Type of Project
Sponsor
Full Decision and
XXXXX Spending Authority ITC CEO
(6) Product The full complex is made of a tower in the city center of
Description /
Gurugram. Besides the New towers, a two-floor underground
Deliverables
parking lot will be built.
The internal lighting of the tower and the climate control has been
designed by the Novara. The whole system has been designed to
have the lowest environment impact thanks to computer-controlled
panels.
Project deliverables are:
1. 70—meter hotel complex tower.
2. Two-floor underground parking lot with 400 spaces.
3. Two restaurants at the ground floor and first floor for 500 seats
each.
4. Computerized lighting and climate control system.
5. Maintenance plan of the complex.
(7) Project The project is part of strategic expansion plan. With this project
Objectives also establish a strategic partnership with Novara snc. This
collaboration will enhance the chance of success in future project
biddings than KS to their innovative system. The overall
infrastructure of the lighting system and climate control will be
developed by the DeCarlo spa. The project aims at developing a
strong relationship with the DeCarlo spa as well.
(8) Work Site The site is located in Gurugram.
TOTALS320M USD
Organizational Information
(18) Project Technical Review meetings will be held on a monthly basis for
High Level Process lessons learned analysis. Kanban Board will be used to enhance
Improvement Plan communication in project teams. New excavator technologies will be
applied to reduce time and reworks. Computerized lighting and climate
control systems will be developed within the agile/scrum methodology.
(19) Project will be implemented within company ISO quality standards.
Organizational All procurement will be done through informal RFI and formal RFQ
according to company quality standard.
Process
Contract Manager will be on-site.
Definition
(20) Main Lessons Lessons from following projects have been analyzed.
Learned Applied 1. City Tower construction of XYZ Hotels.
2. PQR Tower in Mumbai.
(21) Tools & The Team Leader will receive Primavera P6 training in order to
Templates understand the work done by the Planner.