You are on page 1of 1

Project: Proposed Executive Condominium at Anchorvale Crescent

Static Axial Com rcssion Load Testing on Instrumented Test Pile ULT2

Pile No. •ULT2


Pile Diameter : 900 mm
Pile Length : 43.282m from ground level of RL 109.963m

Date concreted : 05102/2014


Max Test Load : 3.5 x 4770kN or failure
Concrete I Steel •G40, 11 T20
DateTested : 19-02-2014to 25-02-2014

Main steel : 11 = 3,456 mm 2)


X-Area of concrete 2
c. Nominal 632,717 mm

Modulus of steel 200 kN/mm2


Modulus of concrete: kN/mm2

FIGURE (i) LOAD DISTRIBUTIONCURVEFOR 1st CYCLE


COMPUTED FROM VW GLOSTRE,XT STRAIN GAUGES TEST RESULTS
1st CYCLE

Loads ( kN)
2000 4000 6000 8000 t 0000 i 2000 14000 i 6000 18000 20000

2
4
148 1
6
8
80

12
127 ts-oX',-f
> 14

CD
16
E 18
20
1055
— 22
24
o 26

28
30
32
34
36 5
38
40
42
44
3623Krå
-.—p 6026KN 7103KN 8355KN —P= 9647KN 10782KN
-e-p 11960KN —-P= 13040KN 13820KN —.-p- 15086KN

F-5(i)