European Post-Master Accountancy program
Oral Examination form
Internal Control & Accounting Information Systems
Candidate: Katerina Nguyen Date: 11-12-2020
Examiner: prof.dr. Eddy Vaassen RA
Petri ihe care Lm Kiomliamd + (SCE Wellaledi/)
ae Cou) daw lary. ing yh. lenin fo aot ls oh
Madbuds eat ath Aupewws ? PC comsegltend 5?
at eek. tie
f mbt, fay nl, cuhd lanvoanyf
dc phd) es om Ay wll
tie svc ea bs (3 (ilk oe
ic. bof HS, dada
UT Lupirndivet Fra wyiln % jwvly 7
— thoes? seat mie, sl pin,
ahs af (SEE
aa dey Ku Pes
pros ee eg Pde a tle PMC 7 Hor
in (oso. Combs Aersironon
Ncmundelions, Sad, (C/Cole, ree Corby,
Mhabamatec analyn's, hoa in he IT
firm? ey ? Fike bn fprensbated 7 ig. fo
sity ome, accommodation bo (56 Wann os | ?
Assigned grade: [PF os
Signature candidate: Signature examiner:
—_—Topics to discuss and evaluation
Topic
Qualification
Evaluation
(excellent, very good, | (motivation of the qualification)
good, sufficient,
insufficient, strongly
insufficient, not
discussed)
Practical case written part
Practical case oral defense
gee
aia
TT audit foundations
wag yed
WEES ant (TRE) Pol ne
TCAIS foundations. what is
IC/AIS, why IC/AIS, link
between IC and AIS?
Por
Ic
Information quality
Value cycle
i
Ty pinche cats
Internal control according
to COSO and the
candidate’s own opinion
veer seed
Da Prekid ante. Solel _
Link between internal
control and management
control
ped
| fh mel
Link between internal
control and IT control
iy ot
(T Laviriotin,
Recent practical ICAIS
cases (fraud, best
practices, innovations) and
‘other contemporary topics
‘Other topics
Upt vom Cin/C4
Persuasiveness of the
candidate and
‘communication skills
saflsind
Voug wed
Sealine, Pea hae prOcnes
a
(Tay ord 9 Me aed 4¢TILBURG 6 University
‘School of Economics and Management
PRACTICAL CASE
LAFTOIL INTERNATIONAL SECONDMENT B.V.
Date: 7-11-2020
Name: Huyen Katerina Nguyen
Student number: 2019356
Email: h.ksnguyen@@tilburguniversity.edy
Case supervisor (Tilburg University): prof. dr. E.H.J. Vaassen RA
Practical traineeship supervisor: M. Sodekamp RA
|
|
¥2C
KK bul
Signature of the traineeship supervisor
\ ham
pAo
INTRODUCTION
+ partof abig conglomerate the Laftll Group
rowledge and sil to
“Objective ofthe Company i to provide staffing services to
Some of processes are outsourced to SSCS (in Prague and in Moscow)