A B 13.50 C D 13.

50 E F

Roof Apex
7.93

2.41
TOLB
5.52

1.16
Top of Beam

7.78
4.36

4.21
FFL
MULTI - PURPOSE BUILDING/COVERED COURT 0.15

0.15
N.G.L.
0.00

1
LEFT SIDE ELEVATION
A-4
1 : 100

F E D C B A

Roof Apex
7.93

3.57
Top of Beam

0.40

7.78
4.36

beam bottom

3.81
3.96

MULTI - PURPOSE BUILDING/COVERED COURT


FFL

2.00 0.15
0.15
N.G.L.
0.00
RETB
-2.00

2
RIGHT SIDE ELEVATION
A-4
1 : 100

AGENCY PROJECT TITLE: SHEET CONTENTS: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SHT.SET: SHT.NO:

CONSTRUCTION OF
REPUBLIC OF THE PHILIPPINES MULTI - PURPOSE BUILDING AS SHOWN
A

25/11/2021 2:36:30 pm
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS CONCURRED BY:
3
QUEZON 3RD ENGINEERING DISTRICT REGION 4A
OFFICE OF DISTRICT ENGINEER ALMA JANE F. GOZO OLIVER P. FORNESTE FERDINAND Y. RICABLANCA MICHAEL P. ROSARIA JORGE C. PASIA
PROJECT LOCATION: BRGY. CAWAYANIN IBABA, CATANAUAN, QUEZON ARCHITECT II, PLANNING & ENGINEER II, PLANNING & CHIEF, PLANNING & OIC-ASSISTANT
CATANAUAN, QUEZON END USER AUTHORIZED REPRESENTAIVE DESIGN SECTION DESIGN SECTION DESIGN SECTION DISTRICT ENGINEER
OIC-DISTRICT ENGINEER
SCALE: AS INDICATED