Item DESCRIPTION Qty Unit Rate Item K
K n
n
DEMOLITIONS
ADMIN BLOCK
Carefully take down the existing roof and hand over
1 removed roofing sheets to client and clear from the site
all other waste item
Carefully remove all Light fittings after isolating them
from power and hand over to the client item
Carefully take down the existing ceiling board and
2 370.00 m2
remove waste from site
Remove with care existing Distribution Board and hand
3 over to client, seal, close off opening and make good in item
readiness for painting
Carefully remove Distribution Board in Corridor ouside
4 the TM office and hand over to client, make good and item
prepare to receive New one
Allow for removal of all Notice Boards, Picture frames,
Write ups, Notices, signage, hooks, Rails, door handles,
5 Blinds and all other fixtures on walls and doors in item
rediness for painting and store in safe and secure place
as directed by the client, and re-install after painting
SAFETY& SECURITY
Carefully remove all Light fittings after isolating them
1
from power and hand over to the client item
Carefully take down the existing ceiling board and
2 78.00 m2
remove waste from site
Carefully remove Distribution Board located in office
3 and hand over to client, make good and prepare to item
receive New one
Allow for removal of all Notice Boards, Picture frames,
Write ups, Notices, signage, hooks, Rails, door handles,
4 Blinds and all other fixtures on walls and doors in item
rediness for painting and store in safe and secure place
as directed by the client, and re-install after painting
Carefully take down the existing roofing Sheets and
5 Trusses and hand over removed roofing sheets to client
and clear from the site all other waste item
Carefully remove the last 600mm of block work on all
6 the walls, make good and prepare to receive Reinforced 52.00 m2
Ring Beam
BOQ 1
Subtotal
To Summary
Item DESCRIPTION Qty Unit Rate Item K
K n
n
NEW WORKS
ROOFING
ADMIN BLOCK
IBR Roofing
Allow for repairing and/ or replacing any broken or
Rotten rafter, purlin, or truss member and make sure
1 item
that the entire truss frame work is straight in
readiness to receive new roof covering
2 Supply and fit 0.5mm IBR roofing sheets 675.00 m2
3 Supply and fit G.I Ridges 101.00 m
4 Supply and fit 200x100mm G.I water gutter 22.00 m
5 Supply and fit G.I Flashing 28.00 m
supply and install PVC rain gutters complete with
6 33.00 m
down pipes and all accessories
Supply and Install 200x22mm softwood timber
7 135.00 m
Fascia Board
IBR Roofing
4 Supply and fit 0.5mm IBR roofing sheets 115.00 m2
5 Supply and fit G.I Ridges 10.00 m
supply and install PVC rain gutters complete with
6 5.00 m
down pipes and all accessories
Supply and Install 200x22mm softwood timber
7 48.00 m
Fascia Board
BOQ 2
Subtotal
To Summary
Item DESCRIPTION Qty Unit Rate Item K
K n
n
CEILING FINISHINGS
ADMIN BLOCK
Gypsum board ceilings on Timber framing
Suspended Gypsum Ceiling board fixed to existing
40mm x 40mm timber brandering using self tapping 2
1 298.00 m
dry wall screws, Skimmed smooth with Rhinolite,
complete with cornice, fixed with covebond
ELECTRICAL INSTALLATIONS
Preamble
Allow for making good all disturbed electricals,
1 conduiting and wiring to complete all circuits and 1.00 Item
positioning of lighting points.
Light Fittings
supply deliver, install, connect and set to work the
following electrical fittings with standard and
performance specifications approved by the engineer
60 x 60mm LED fluorescent surface mounted fitting
complete with intergral switch start control, and all
2 94.00 No.
required accessories as Philips TMX 200Ls or other
equal approved
BOQ 3
Subtotal
To Summary
Item DESCRIPTION Qty Unit Rate Item K
K n
n
B/ Forward -
BOQ 4
Subtotal
To Summary
Item DESCRIPTION Qty Unit Rate Item K
K n
n
PAINTING
2
1 Internally walls 2,060.00 m
Painting to doors, doors frames, window frames and
2
2 all shelving internally in matt gloss or egg shell 360.00 m
equivallent
2
3 Painting to ceiling 448.00 m
Prepare and apply two coats of clear Vanish on 2
4 30.00 m
general surface of Hardwood doors
2
5 Prepare and apply Brick Vanish on Fire Place area 17.00 m
External Painting to Admin Block, Safety and
6 1,023.00 m2
Security, Programming and Medical Building
PAINTING TO SUMMARY -
OTHER WORKS
Glazing
Wall Tilling
7 300x 200 ceramic wall tiles 105.00 m2
C/ Forward -
BOQ 5
Subtotal
To Summary
Item DESCRIPTION Qty Unit Rate Item K
K n
n
OTHER WORKS CONT.D B/ Forward -
Miscelloneous ironmongery
Installation of 2 lever mortice locks to Doors to
2 34.00 No.
offices and clossets
3 Installation of Door Handles to closset doors 22.00 No.
KITCHEN WORKS
BOQ 6
Subtotal
To Summary
Item DESCRIPTION Qty Unit Rate Item K
K n
n
EXTERNAL WORKS
BOQ 7
Subtotal
To Summary
Item DESCRIPTION Qty Unit Rate Item K
K n
n
SUMMARY
DEMOLITION -
ROOF COVERINGS -
CEILING FINISHES -
ELECTRICAL INSTALLATION -
PAINTING -
OTHER WORKS -
EXTERNAL WORKS -
TOTAL -
MAIN SUMMARY
Proposed Works -
SUB TOTAL -
ADD
Contingecy @
SUB TOTAL -
TOTAL -
BOQ 8