Tel: 02-2527-6979/2526-7256
Subject: Comments on the Contractor's submission of FM200 System (TYCO) and DCC
building HVAC.
Reference: Ref. No.: EG-P36 Lot-2 CON 00135 Tech Renovation dated September 30, 2021
With respect to the subject above and referred letter, please find the Engineer's comments
attached hereto. The Contractor is requested to re-submit the FM200 System
(TYCO) and DCC building HVAC submittal in accordance with the aforementioned
comments so that the submittal can be fully compliant with the Contract.
The submitted documents are in accordance with GC 3.1 "Engineer's Duties and Authority".
Sincerely Yours,
Project Manager
Encl.: as stated
Page 1 ofl