You are on page 1of 1
Page 1 of 1 15406 ITEM NO: 1 WORK ORDER NO:VBD001-50500600-SPC DU NO: BHARAT HEAVY ELECTRICALS LIMITED VALVE CODE No: 7105935 High Pressure Boiler Plant TIRUCHIRAPPALLI - 620 014. Po P)0121723/5 0022 FORM III-C CERTIFICATE OF MANUFACTURE AND TEST OF BOILER MOUNTINGS AND FITTINGS (Regulation 4(g)) Centicate No 3a7073 DATE 21.12.2077 Design presure in Ky/Saem 260 Tyme Ten Presse a KeiSqem [390 Main dimension & Class: 1 Inch 1500 Class Name of part: HIGH PRESSURE DROP VALVE CS SW HW (25:40 mm Customer's Name and Address: Body Material: SA105 ISGEC Heavy Engineering Ltd- Boiler ‘A-4 Sector 24, Drawing No: 3V562304929 Noida, UP TMAWP = Maximum Alowabla Working Pressure in Kg/egem Tillacune [ooeae | 200 7 300 | 400 1 426-1 «50 | «78 1 500 | 626 | 660 1 676 [ooo 12s vawe» | 260 | 228 | 197 | 477 | ere] | Teeeeee reece reer Pressure shown ot room lernperature fs teed value Other pressure valves Indosted in tobi ebove ore celeulted valve only. Heat No SECHEVICAL COMPOSITION PHYSICAL TEST RESULTS | VALVE Cc | Mn} Si P S| Cr |Mo/ Ni | Vv UTS eee. lary 0.220) 0.820] 0.200] 0.011] 0.022} 0.122] 0,00] 0.010) 0-002] 30 27 7 MPa TOTAL NUMBER OF VALVES 1 Raw Material Details: Test Certificate No.:1524 & Date:13.07.2016 Size:1" BODY 5620 ‘Spec: SA105, Heat No.TEW £29306 Process of Manufacture:CLOSED DIE FORGING (Fully Killed) Name of the Maker: THILLAT ENGINEERING WORKS. Name of the Inspecting Authority: WELL KNOWN FORGE Certified that the particulars entered herein by us are correct.The Valvels) hasthave) been designed end constructed to comply with he indian Boller Regulations 960 for a maximum working pressure of 260 kg/Scom and maximum temperature as referred in table nd satisigctory withstood # Hydraulic test using water or Kerasene to @ pressure of 390 kg/Sgcm on the 21st day of DECEMBER 017 in the presence of our responsible representative whose signature is appended hereunder. (a nu JL.BENJAMIN PAULRAJ ‘C.ANAND Deputy General Manager Deputy General Manager ‘uality Controt Valves Production Maker's (Name & Signature) Maker's Representative (Name & Signature) Valvels) has(have) been constructed and tested in accordance with the requirements, ity that tha particulars entered herein are correct, Deputy Director of BHEL, Trichy & Thirumayom Plants, on behelt of INSPECTING AUTHORITY Director of Boilers, Tamil Nadu. Name & Signature of the Inspecting Authority We have satisfied ourselves and the f the INDIAN BOILER REGULATIONS, 1960. Wo further ot EER Name & Signature of the Competent Person Who, witness pac{O0B/ TRICHY & THIRUMAYAM| Date} “he

You might also like