DETAIL D3
615
262
WELD LOCATION
℄120F-003
7008
C CUT FROM
7025
DESIGN CONDITIONS
7006 7007 ITEM
7004 7005 120F-003
EQUIPMENT NO.
7102
PROCESS
45°
DESIGN PRESSURE ELASTIC/RUPTURE ( Kg/cm²g ) 9.5
7102
COVER PLATE 7024 DESIGN TUBE METAL TEMPERATURE ( °C ) 535
7401 153
340
7204 CUT FROM ITEM CUT FROM
220 7021 DESIGN FLUID TEMPERATURE ( °C ) 420
ITEM
CORROSION ALLOWANCE ( mm ) 1.5
7023
INITIAL HYDROSTATIC TEST PRESSURE ( Kg/cm²g ) 16.32
· API 560 5TH ED. FEB. 2016 - FIRED HEATERS FOR GENERAL REFINERY
· DELETED C
350 · DRP001-PUC-SPE-W-000-006- WELDING & NDE OF PRESSURE EQUIPMENT & PIPING
300
CUT FROM · DRP001-PUC-SPE-W-000-007- POSITIVE MATERIAL IDENTIFICATION
7026
ITEM
30°
CUT FROM REFERENCE DRAWINGS
7402
ITEM HOLE Ø6mm 1
FOR VENT
40
EL. 10,820 · A1-33140-001: GENERAL NOTES (DRP001-PUC-TEC-D30-120F-001-0001) C
DONT DRILL
7101
THE PIPE · A1-33140-301 & A1-33140-302: GENERAL ARRANGEMENT ELEVATIONS & PLANS
7403 (DRP001-PUC-TEC-G31-120F-003-0001 & DRP001-PUC-TEC-G31-120F-003-0002)
7103 HALF IPE 120
PLATE TYP. · A3-33140-SK301: SKETCH TUBESKINES (DRP001-PUC-TEC-D30-120F-003-0007)
C
DETAIL D2 THK. 10mm
HEB160 260 160
200
D4 D4 VIEW D5-D5 CROSS-OVER SUPPORT GENERAL NOTES
PROCESS OUTLET SCL. 1:10
EL. 3750 1. FLANGES BOLTS TO STRADDLE HORIZONTAL AND VERTICAL CENTERLINES.
7101
LINE OF CASTING
LINE OF CASTING
LINE OF CASTING
LINE OF CASTING
7003 7022 7002 7001 7001 7002 2. FOR ENDS BEVELS SEE ASME B16.25.
SUPPORTS
SUPPORTS
SUPPORTS
SUPPORTS
3. THIS DRAWING IS ONLY FOR COIL FABRICATION. BILL OF MATERIAL DOES NOT SHOW MATERIAL REQUIRED
FOR WELD HOMOLOGATION, CALIBRATION, INSPECTION REQUIREMENTS, DESTRUCTIVE TESTS, ETC.
4. TUBE LENGTHS SHOWN IN THIS DRAWING (OVERALL AND FINNED) ARE THE FINAL ONES.
7301 7302 9. COIL ASSEMBLIES SHALL BE COMPLETELY DRAINED IMMEDIATELY UPON COMPLETION OF HYDROTESTING.
7005 7202 7203
D5 CL CELL 1 10. MARK 7022 WILL BE SUPPLIED WITH AN EXTRA LENGTH OF 100mm REGARDING TO THE THEORICAL DIMENSION,
3750
IN ORDER TO MAKE THE HYDRO-TEST. AFTER THE TEST (AT SHOP), PIPES SHALL BE CUT AND BEVELLED
ACCORDING TO ASME B16.25 FIG. 2a TO THE THEORICAL LENGTH.
7023
340
#2 11. MARKS FROM 7003 TO 7010, 7012, 7013 AND 7017 WILL BE SUPPLIED WITH AN EXTRA LENGTH OF 100MM
7012 PROCESS REGARDING TO THE THEORICAL DIMENSION, IN ORDER TO ADJUST AT SITE.
OUTLET
12. COATING OF EXTERNAL SURFACES AS PER DRP001-PUC-SPE-W-000-008
3320
7204
#3 13. INITIAL HIDROSTATIC TEST VALUE IS CONSIDERED WHEN THE TUBES ARE UNCORRODED (BEFORE FIRST
7011 PROCESS START-UP OF THE HEATER) / PERIODICAL HYDROSTATIC TEST VALUE IS CONSIDERED WHEN THE TUBES
OUTLET COULD BE CORRODED (DURING THE LIFE OF THE HEATER).
7010
9760
7102
1875
13510
7102
3750
CL CELL 2
7102
D6 TW
150
#4
PROCESS
D6
7013 OUTLET
7016 #4
2690
2690
7014
L 120F-003
#3
2030
7015
C 270º CL 120F-003 90º
#2
2690
#1
7102
90º #5 22-AUG-19 C FOR APPROVAL RRL IBL AMM DCR PRN DFH
270º #8 C
L 120F-003
PROCESS DETAIL D3
OUTLET SCL. 1:10 15-MAR-19 B FOR APPROVAL RRL IBL AMM DCR PRN DFH
1875
#6 CL CELL 3 HT PROC
2030
#5
7019 #6
7017 PROCESS
D6 150 OUTLET Duqm Refinery Project EPC Package One
3320
D6 TW #7
6440
9130
UNIT: 120
1875
3750
7004
7011 CL CELL 4 PURCHASE ORDER NUMBER (RFP): 1012001030 EQUIPMENT: 120F-003
13510
VIEW D4-D4
7005 SCL. 1:50 COMMENTS AS NOTED REVIEWED AS BUILT FOR INFORMATION
D5
D5 VOID
7012 7006 22 October 2019
DATE:
350
300 C VENDOR IDENTIFICATION:
7007 CUT FROM TR-TECNICAL
7026
ITEM
30°