(Spring_2018_CVEN381_L01)
Assignment # 4
Mazen El Tohfa
201304414
1.What is the allowable period of time for a contractor such that he must obtain the
required Performance Bond according to Ashghal General Conditions 2007? What are the
acceptable entities who can issue performance bonds?
28 days from the notification of acceptance
4. What is the permissible period such that the contractor must submit detailed schedule of
work for the project?
14 days
5. How the contractor is protected for injuries during construction? And which section or
clause support your answer?
The contractor must have an insurance against any injury to workers and this insurance must be
with insurer approved by PWA.
Clause 23 and 24 from General Obligation section
6. What section that protects the rights of labor and prove that they are receiving the
appropriate wages in accordance to local Qatari regulations?
Labour section (34)
7. By default, is night time construction allowed in any project? Which section or clause
supports your answer?
No, it’s not allowed to work at night time, but if it’s necessary there must be a written permission
to work at night from the engineer representatives.
8. What is meant by Method of Measurement? And what are the different allowable
Methods to be used for quantities?
Method of measurement provide detailed information, classification table and rules for
measuring building work, also it is used in preparation of bill of quantities.
Unit method/ Elemental estimate/ Approximation quantities
Questions related to the Multistory Car Park Example:
1.What is the language of the contract documents and all communication per the particular
conditions of the project? Which clause supports your answer?
The language of contract documents and all communication is English.
Clause 6(1)
2. What is the main subject of clause 45 (2)? And who will pay the supervision in such case?
Engineer’s overtime: this clause describes the action that must be taken when the contractor
wants to work after the normal hours of work in order to complete the work at the date set in the
contract.
The contractor will pay for supervision.
3. What is the situation if the contractor was delayed due to local regulation procedure?
The contractor must be provided with time extension and the engineer determine how long will
be this additional period.
4.In your own understanding summarize clause 51 (3). Do not copy words express it in
meaningful equations.
This clause describe what actions must be done when there is any addition to the contract price,
so according to clause 51(3) any additional work must be valuated at the rates and prices set out
in the contract, but if the contract does not include the rates of any additional work so the prices
must be determined as the following:
1. Basic cost of material delivered to site:
2. Basic cost of labors
3. Basic cost of plant and machinery
Basic cost must not include any site management cost. For work performed by contractor it must
have limit of 15% and for work performed by subcontractor it must not exceed 8% of basic cost
and 7% of subcontractor actual cost for contractor markup.
When BOQ contract is used the contractor must not be entitled for any markup or any additional
payment.
7. How are the daily activities recorded in the project? What provisions related to such
topic in the specifications and QCS 2014?
The contractor must submit the site diary on daily basis to engineer or engineer’s representative
latest on beginning of following day
Provision of guarantees, warranties and bonds and Provision of operation and maintenance
manuals.