You are on page 1of 2

insert into L2_PROVISION_BE (VALID_ON, LOT_TYPE_FK, IDE_POSITION_REF, STATUS) select VALID_ON,

LOT_TYPE_FK, IDE_POSITION_REF, 5 from L2_Provision

select * from L2_Provision_BE

insert into L2_PROVISION_BE


(VALID_ON, LOT_TYPE_FK,
IDE_POSITION_REF, STATUS)
select VALID_ON,
LOT_TYPE_FK,
IDE_POSITION_REF, 5 from
L2_Provision

select * from
L2_Provision_BE

changing test data from 2016 to 2019

1)run processes

2)in temp/in lated .dat file replace 2016 with 2019 in validon

3)run capture/ BEA STANDARD CAPTURE/ AND search in temp that .dat file

3) Installation parameter: DIRECT_FILL_FROM_DF: N

You might also like