You are on page 1of 1

PT .

ADHIMIX RMC INDONESIA


PLANT CASABLANCA

LAPORAN HASIL TEST KUAT TEKAN BENDA UJI


PROYEK : PEMBANGUNAN FASILITAS PERKERETAAPIAN UNTUK MANGGARAI S/D JATINEGARA (PAKET A) (TAHAP II) "PEKERJAAN MAIN LINE I"
KONTRAKTOR : NINDYA - CITRA - KHARISMA KSO

Tanggal Umur Berat Benda Uji Ukuran Luas Beban Kuat Tekan
No Test Mutu Kode Benda Uji Penampang Keterangan
Tgl Cor Tgl Test
( Hari ) (kg) (cm) (kN) Kg/cm²
NCK-DDT / PILECAPE L AS 7/8 / K-300 /
1 26-Jan-22 02-Feb-22 7 K-300 12.37 Silinder 15x30 176.71 347 241.32
ADCSB1
NCK-DDT / PILECAPE L AS 7/8 / K-300 /
2 26-Jan-22 02-Feb-22 7 K-300 12.31 Silinder 15x30 176.71 319 221.53
ADCSB2
NCK-DDT / PILECAPE L AS 7/8 / K-300 /
3 26-Jan-22 02-Feb-22 7 K-300 12.35 Silinder 15x30 176.71 331 230.13
ADCSB3
NCK-DDT / PILECAPE L AS 7/8 / K-300 /
4 26-Jan-22 02-Feb-22 7 K-300 12.31 Silinder 15x30 176.71 345 239.63
ADCSB4
NCK-DDT / PILECAPE L AS 7/8 / K-300 /
5 26-Jan-22 02-Feb-22 7 K-300 12.31 Silinder 15x30 176.71 323 224.57
ADCSB5
NCK-DDT / PILECAPE L AS 7/8 / K-300 /
6 26-Jan-22 02-Feb-22 7 K-300 12.40 Silinder 15x30 176.71 328 228.07
ADCSB6
NCK-DDT / PILECAPE L AS 7/8 / K-300 /
7 26-Jan-22 02-Feb-22 7 K-300 12.33 Silinder 15x30 176.71 311 216.54
ADCSB7
NCK-DDT / PILECAPE L AS 7/8 / K-300 /
8 26-Jan-22 02-Feb-22 7 K-300 12.40 Silinder 15x30 176.71 340 236.69
ADCSB8

Catatan : Jakarta, 2-Feb-2022


KONSULTAN KONTRAKTOR PT. ADHIMIX RMC INDONESIA
Plant Casablanka

(…………………………..) (…………………………..) ( Anton Junaedi )