Professional Documents
Culture Documents
PFRL Full Sync PlanV1.1
PFRL Full Sync PlanV1.1
1. XIDB to be made 0 inventory for those 25 nodes and EAN combination. FO will
consume this, hence Processed Flag will be 0 in the start. FO and Dropship to
confirm to Sterling to start the sync, post consumption of 0 inventory data from
XIDB
2. Ashutosh to then confirm the matching of inventory between XIDB and
Sterling Availability for first 25 nodes and confirm.