You are on page 1of 15

SFRA Test Signatures Comparison

Location: Mankhurd Mumbai


Make: ABB
KV Rating: 110/22
Mfr Year:
Serial Number: 1LIN21600100084
Vector Group: Dyn11

1. HV Side – Open Circuit Plot, 1U-1V, Tap Position-1

2. HV Side – Open Circuit Plot, 1V-1W, Tap Position-1


3. HV Side – Open Circuit Plot, 1W-1U, Tap Position-1

4. HV Side – Open Circuit Plot, 1U-1V, Tap Position-11


5. HV Side – Open Circuit Plot, 1V-1W, Tap Position-11

6. HV Side – Open Circuit Plot, 1W-1U, Tap Position-11


7. HV Side – Open Circuit Plot, 1U-1V, Tap Position-21
8. HV Side – Open Circuit Plot, 1V-1W, Tap Position-21

9. HV Side – Open Circuit Plot, 1W-1U, Tap Position-21

10. HV Side – Open Circuit Plot, 1U-2U, Tap Position-11


11. HV Side – Open Circuit Plot, 1V-2V, Tap Position-11
12. HV Side – Open Circuit Plot, 1W-2W, Tap Position-11

13. HV Side – LV Short Circuit Plot, 1U-1V, Tap Position-11


14. HV Side – LV Short Circuit Plot, 1V-1W, Tap Position-11

15. HV Side – LV Short Circuit Plot, 1W-1U, Tap Position-11


16. LV Side – Open Circuit Plot, 2U-2N, Tap Position-11

17. LV Side – Open Circuit Plot, 2V-2N, Tap Position-11


18. LV Side – Open Circuit Plot, 2W-2N, Tap Position-11

19. LV Side – Short Circuit Plot, 2U-2N, Tap Position-11


20. LV Side – Short Circuit Plot, 2V-2N, Tap Position-11
21. LV Side – Short Circuit Plot, 2W-2N, Tap Position-11

THREE PHASE COMPARISON OF FIELD SFRA MEASUREMENT


22. HV Side – Open Circuit Plot, 1U-1V, 1V-1W, 1W-1U, Tap Position-1
23. HV Side – Open Circuit Plot, 1U-1V, 1V-1W, 1W-1U, Tap Position-11

24. HV Side – Open Circuit Plot, 1U-1V, 1V-1W, 1W-1U, Tap Position-21
25. HV Side – Open Circuit Plot, 1U-2U, 1V-2V, 1W-2W, Tap Position-11

26. HV Side – LV Short Circuit Plot, 1U-1V, 1V-1W, 1W-1U, Tap Position-11
27. LV Side – Open Circuit Plot, 2U-2N , 2V-2N ,2W-2N, Tap Position-11

28. LV Side – Short Circuit Plot, 2U-2N , 2V-2N ,2W-2N, Tap Position-11