AGENDA STATUS

1. Construction Schedule To be submitted by Friday (Feb. 18, 2022)


2. 3-week Look Ahead Schedule To be submitted by Friday (Feb. 18, 2022)
3. Workplan for Underground Conduit Sizes for each duct section – Revised by CHK
works (Electrical and Telecom) Methodology – Missing
Materials – Missing
Equipment – Missing
AHA – Submitted to the Government
4. SOV – Schedule of Values On-going review
5. Generator Submittals Sent to TPR
6. Conduit Penetration Location Telecom – Done
Power -
7. Mobilization Delivery today (2/15/2022)
CHK and 7K Coordination Meeting:

Date: 2/15/2022