bh RARAN G1. PAWRR
_Speezpscatrons oe ft
——“ — | J
? Forthesox kK 1.
ae excavedts, i be cleane, noth
“fe ian " |
_ IE disposed « Hed _& due. |
pe eterthes Bald be dig our te the enach saite of Riundation —
nocebe
f—Measurement chauld be staten in od
=2 :
——_7 Bete Bhall be desivable for complete wore of sem load dnd
) i |
Sim Vee ine wd galt -bools & equipments needed far exca vintia :
=the sigec of trench shad be Dreaced perfectly vertical | fram |
—_—|4ap te tottemn of Peo bed : | |
abet tegged in tne teenth ghaSi be pumped our withaut |
erp ct,
veto ute nal he appticanle Ler every ochre,
gift of bem
< soils sid te. by timber Shor
=Rocks @ bordders it Sound during dugging then ik shoud 4
Temoved:
Cement Movtar t- |
Cement mortar Shall be prepared as pey Specified pwpertion
—+Tncase of wet cand, its Quantity Shalt be Increased oa te
ee | > wad lee |
=the Linenest of sand used for ptartay Qheud be as pey Specified in
ES, In case of plastering otter shalt be Sinmiy applied on
the surface [rom top te down.
- Comment vs0d for martay chews follow ZS rules test_sna
|
— bt
~~ k mater used fet meartny Showd be Lree fram ony fap
— 2b Shewd be Clean5S Brun
2 Brien werk Fixst ctags !
SER Tish ctass
have. plat
S “ — ner si
[rede nak Atte beset arnt & annul hae jo pore —
— i wld be , ae
The brick showed nob break Lohan drenped from hh ight fe
eu nteram tm |
Penled of 12 hour bepele ute.
=Briess Ghewd Neb be oftecte)
efleren i
j= Ban'c ic, breutd nok
thsarb Waker (e S25% absorption dheutd
be ther.
eet st Gnas be cater be dees cat anatase anid oxgoale
dowers particles |
1
fresh ordinay perttand Cement sith nt foro
: 1
Specifications Should be used i
=fise marks
= Fach course of brick show) be Serene Os herizorraly
| There: hewd be & perfect _a slumb wal)
= tohen boo buickg OC Stuck with each
i
|
7
etre ye |
howd 4 Clean pine, Sound |
|
= fox minimum 4.
Saye, bricticerts “Anousd be weteine | wor
|
|
|
|
|AD_Cement concrete ficoning 1
= Te,
|
— “the base concrete used under fteore mayb. a
< Ss a
— Bnccete